Building BusinessServices

Section 24

AC & Refrigerator Repair Centre

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹4.53 lakh and ₹4.53 lakh.

Legal form
Applicant category
Location

Detailed Project Report

AC & Refrigerator Repair Centre

—

Prepared on: 27 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹2.86 L
Term loan from bank
₹1.86 L
Promoter’s contribution
₹0.29 L
Subsidy
₹0.71 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.40 L
Average DSCR
-8.00
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

In summer the phone never stops — a trusted name for AC and fridge service.

Main product or serviceAC & Refrigerator Repair Centre
Installed capacity per year (at 100%)10,000 units

04 Market

  • Households
  • Shops, offices, hospitals and laboratories
  • Hotels, food processing units and cold storages
  • Customers bringing appliances to the workshop
  • Visits to the customer's site
  • Annual maintenance contracts (AMC) with big organisations
  • Sale of spare parts and accessories
  • Flyers, online listing and referrals from local businesses

05 Plant and machinery

ItemQty₹Total ₹
Multimeters (× 2)130,00030,000
Refrigerant leak detectors (× 2)116,00016,000
Pressure gauge sets (× 2)136,00036,000
Thermometer112,00012,000
Tool kit (screwdrivers, pliers etc.) (× 1 set)125,00025,000
Refrigerant recovery machine128,00028,000
AC vacuum pump122,00022,000
Welding machine118,00018,000
Compressor test rig125,00025,000
Tool chest110,00010,000
Laptop / desktop150,00050,000
Total2,72,000

Pre-filled from: UP MSME 1-Connect (Govt of UP, RAMP) – Project Report: Refrigerator & AC Repairing Unit; UP MSME 1-Connect – Business category page: Refrigerator & AC Repairing Unit. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Spare parts: capacitors, compressors, condenser and evaporator coils, fans, motors
  • Refrigerant gas — for refills during servicing
  • Cleaning agents and brushes — for coils and filters
  • Safety gear: gloves, safety glasses, masks

07 Cost of project

₹ in lakh
Plant and machinery2.72
Contingency0.14
Total fixed capital2.86
Working capital margin0.00
Total project cost2.86

08 Means of finance

₹ in lakh%
Promoter’s contribution0.2910.0
Subsidy0.7125.0
Term loan from bank1.8665.0
Total2.86100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.060.060.060.060.060.060.06
Insurance0.010.010.010.010.010.010.01
Total cost of operations2.952.952.952.952.952.952.95
Operating profit (EBITDA)-2.95-2.95-2.95-2.95-2.95-2.95-2.95
Depreciation0.430.360.310.260.220.190.16
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.200.170.140.110.080.050.02
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.58-3.49-3.40-3.33-3.25-3.19-3.13
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.58-3.49-3.40-3.33-3.25-3.19-3.13

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.58-3.49-3.40-3.33-3.25-3.19-3.13
Depreciation0.430.360.310.260.220.190.16
Cash accruals (PAT + depreciation)-3.15-3.13-3.09-3.06-3.03-3.00-2.97
Term loan repaid0.140.290.290.290.290.290.29
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.30-3.41-3.38-3.35-3.32-3.29-3.25
Cash and bank-3.30-6.71-10.09-13.43-16.75-20.04-23.29

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.001.001.001.001.001.001.00
Reserves and surplus-3.58-7.07-10.47-13.80-17.05-20.24-23.37
Term loan outstanding1.711.431.140.860.570.290.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-0.87-4.64-8.33-11.94-15.48-18.96-22.37
Net fixed assets2.432.061.751.491.271.080.92
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.30-6.71-10.09-13.43-16.75-20.04-23.29
Total assets-0.87-4.64-8.33-11.94-15.48-18.96-22.37

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-8.59-6.42-6.89-7.44-8.08-8.84-9.75
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-8.00
Lowest DSCR-9.75
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.430.360.310.260.220.190.16

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
11.860.200.141.71
21.710.170.291.43
31.430.140.291.14
41.140.110.290.86
50.860.080.290.57
60.570.050.290.29
70.290.020.290.00

17 Licences and registrations

  • Shop & Establishment
  • Udyam
  • GST (above the limit)
  • Refrigerant handling training (Ozone Cell/skill certification) — recommended

18 Government schemes that may apply

  • Mukhyamantri Yuva Udyami Vikas Abhiyan (CM-YUVA)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. UP MSME 1-Connect (Govt of UP, RAMP) – Project Report: Refrigerator & AC Repairing Unit — https://msme1connect.up.gov.in/Projectreport/Project%20Report638665738882404441.pdf
  2. UP MSME 1-Connect – Business category page: Refrigerator & AC Repairing Unit — https://msme1connect.up.gov.in/Home/BusinessDetails?Id=87
  3. Devbhoomi Udyamita Yojana (Govt of Uttarakhand, Higher Education Dept) – Project Profile: Fridge and AC Repairing — https://duy-heduk.org/downloads/project-profiles/fridge-and-ac-repairing.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.