Building BusinessServices

Section 24

Acrylic Emulsion Paint

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹21.56 lakh and ₹21.56 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Acrylic Emulsion Paint

—

Prepared on: 27 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹12.60 L
Term loan from bank
₹8.19 L
Promoter’s contribution
₹1.26 L
Subsidy
₹3.15 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.19 L
Average DSCR
-1.96
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Make water-based acrylic paint for walls by dispersing pigments, grinding them and mixing in acrylic emulsion.

Main product or serviceAcrylic Emulsion Paint
Installed capacity per year (at 100%)10,000 units

04 Market

  • House owners and builders
  • Painting contractors
  • Institutions repainting buildings
  • Paint and hardware dealers
  • Direct supply to contractors

05 Plant and machinery

ItemQty₹Total ₹
Sand mill with pump, 5-litre shell, 5 HP motor (× 2)13,00,0003,00,000
Variable-speed high-speed disperser, 15 HP12,00,0002,00,000
Electronic weighing machine120,00020,000
Brookfield viscometer (LCV)13,00,0003,00,000
Weight-per-litre cup, 100 ml15,0005,000
Wet scrubbability tester125,00025,000
DM water plant, 25 litres per hour (× 2)12,00,0002,00,000
Overhead water tank 10,000 litres and tube well180,00080,000
Other machines and equipment170,00070,000
Total12,00,000

Pre-filled from: PMEGP sample project report — Acrylic Paints Manufacturing Unit (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Acrylic emulsion — 54,000 kg a year at ₹95/kg at full capacity — the largest cost
  • China clay — 36,000 kg a year at ₹30/kg
  • Calcite — 18,000 kg a year at ₹15/kg
  • DM water — 1,26,000 litres a year at ₹8/litre
  • HEC (thickener) — 1,260 kg a year at ₹450/kg
  • Pine oil, wetting agent, titanium dioxide, thickener and defoamer — smaller quantities; preservatives, emulsifiers and packing ₹25 L lump sum

07 Cost of project

₹ in lakh
Plant and machinery12.00
Contingency0.60
Total fixed capital12.60
Working capital margin0.00
Total project cost12.60

08 Means of finance

₹ in lakh%
Promoter’s contribution1.2610.0
Subsidy3.1525.0
Term loan from bank8.1965.0
Total12.60100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.250.250.250.250.250.250.25
Insurance0.060.060.060.060.060.060.06
Total cost of operations3.203.203.203.203.203.203.20
Operating profit (EBITDA)-3.20-3.20-3.20-3.20-3.20-3.20-3.20
Depreciation1.891.611.371.160.990.840.71
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.890.770.630.490.350.210.08
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-5.97-5.57-5.19-4.85-4.53-4.25-3.98
Income tax0.000.000.000.000.000.000.00
Profit after tax-5.97-5.57-5.19-4.85-4.53-4.25-3.98

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-5.97-5.57-5.19-4.85-4.53-4.25-3.98
Depreciation1.891.611.371.160.990.840.71
Cash accruals (PAT + depreciation)-4.08-3.96-3.82-3.69-3.55-3.41-3.27
Term loan repaid0.631.261.261.261.261.261.26
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-4.71-5.22-5.08-4.95-4.81-4.67-4.53
Cash and bank-4.71-9.93-15.02-19.96-24.77-29.44-33.97

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)4.414.414.414.414.414.414.41
Reserves and surplus-5.97-11.54-16.73-21.58-26.11-30.36-34.34
Term loan outstanding7.566.305.043.782.521.260.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities6.00-0.83-7.28-13.39-19.18-24.69-29.93
Net fixed assets10.719.107.746.585.594.754.04
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-4.71-9.93-15.02-19.96-24.77-29.44-33.97
Total assets6.00-0.83-7.28-13.39-19.18-24.69-29.93

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-2.11-1.58-1.69-1.82-1.98-2.17-2.39
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.96
Lowest DSCR-2.39
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation1.891.611.371.160.990.840.71

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
18.190.890.637.56
27.560.771.266.30
36.300.631.265.04
45.040.491.263.78
53.780.351.262.52
62.520.211.261.26
71.260.081.260.00

17 Licences and registrations

  • Udyam
  • GST
  • Pollution Control Board consent
  • Trade licence
  • BIS certification if your paint type falls under a quality control order
  • Trademark for the brand (optional)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Acrylic Paints Manufacturing Unit (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Acrylic_Paints%28Chemical%29_%28_Samadhan_Projects_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.