Building BusinessServices

Section 24

Aloe Vera Gel

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹24.83 lakh and ₹24.83 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Aloe Vera Gel

—

Prepared on: 27 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹18.90 L
Term loan from bank
₹12.29 L
Promoter’s contribution
₹1.89 L
Subsidy
₹4.73 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-6.35 L
Average DSCR
-1.37
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Wash and fillet fresh aloe leaves, extract the gel, thicken it and fill it into 100 ml tubes.

Main product or serviceAloe Vera Gel
Installed capacity per year (at 100%)10,000 units

04 Market

  • Skin-care consumers
  • Cosmetic and herbal product makers (bulk gel)
  • Pharmacies
  • Medical and cosmetic stores
  • Malls and supermarkets
  • Bulk supply to cosmetic firms

05 Plant and machinery

ItemQty₹Total ₹
Aloe leaf washing unit12,50,0002,50,000
Ultrasound sterilizer12,50,0002,50,000
Aloe leaf pulp-removing machine, 125 kg/hr13,00,0003,00,000
Juicer, 125 kg pulp/hr140,00040,000
Mixing tank, 500 litres11,75,0001,75,000
Homogeniser11,50,0001,50,000
Filter11,50,0001,50,000
Paste (tube) filling machine11,25,0001,25,000
Conveyor11,50,0001,50,000
Storage tank, 500 litres11,00,0001,00,000
Leaf-cutting table11,00,0001,00,000
Other machines and equipment110,00010,000
Total18,00,000

Pre-filled from: PMEGP sample project report — Aloe Vera Gel Manufacturing Unit (prepared by Udyami/Samadhan); NPCS project summary — Aloe Vera Gel and Powder (file listed on PMEGP as the Aloe Vera Gel profile). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Fresh aloe vera leaves — 100 tonnes a year at ₹18,000/tonne at full capacity
  • Carbopol (thickener) — 1,500 kg a year at ₹2,000/kg
  • Aristoflex (thickener) — 666 kg a year at ₹4,000/kg
  • Calcium hypochlorite (disinfection) — 400 kg a year at ₹140/kg
  • 100 ml tubes — 3,00,000 a year at ₹2 each

07 Cost of project

₹ in lakh
Plant and machinery18.00
Contingency0.90
Total fixed capital18.90
Working capital margin0.00
Total project cost18.90

08 Means of finance

₹ in lakh%
Promoter’s contribution1.8910.0
Subsidy4.7325.0
Term loan from bank12.2965.0
Total18.90100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.380.380.380.380.380.380.38
Insurance0.090.090.090.090.090.090.09
Total cost of operations3.353.353.353.353.353.353.35
Operating profit (EBITDA)-3.35-3.35-3.35-3.35-3.35-3.35-3.35
Depreciation2.842.412.051.741.481.261.07
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.331.150.940.740.530.320.11
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-7.52-6.91-6.35-5.83-5.36-4.93-4.53
Income tax0.000.000.000.000.000.000.00
Profit after tax-7.52-6.91-6.35-5.83-5.36-4.93-4.53

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-7.52-6.91-6.35-5.83-5.36-4.93-4.53
Depreciation2.842.412.051.741.481.261.07
Cash accruals (PAT + depreciation)-4.68-4.50-4.30-4.09-3.88-3.67-3.47
Term loan repaid0.951.891.891.891.891.891.89
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.63-6.39-6.19-5.98-5.77-5.56-5.36
Cash and bank-5.63-12.02-18.21-24.19-29.96-35.52-40.88

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)6.626.626.626.626.626.626.62
Reserves and surplus-7.52-14.43-20.78-26.61-31.97-36.90-41.43
Term loan outstanding11.349.457.565.673.781.890.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities10.441.63-6.60-14.32-21.57-28.39-34.82
Net fixed assets16.0713.6611.619.878.397.136.06
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.63-12.02-18.21-24.19-29.96-35.52-40.88
Total assets10.441.63-6.60-14.32-21.57-28.39-34.82

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.47-1.10-1.18-1.28-1.39-1.52-1.67
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.37
Lowest DSCR-1.67
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.842.412.051.741.481.261.07

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
112.291.330.9511.34
211.341.151.899.45
39.450.941.897.56
47.560.741.895.67
55.670.531.893.78
63.780.321.891.89
71.890.111.890.00

17 Licences and registrations

  • Cosmetics manufacturing licence from the state drug controller
  • GST
  • Udyam
  • Pollution consent as per state category
  • Legal Metrology registration for packaged goods
  • Trademark for the brand (optional)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Aloe Vera Gel Manufacturing Unit (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Alovera_Gel_mfg._%28_Samadhan_Projects_%29.pdf
  2. NPCS project summary — Aloe Vera Gel and Powder (file listed on PMEGP as the Aloe Vera Gel profile) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/ALOE_VERA_GEL_%28_POLYMER_AND_CHEMICAL_BASED_INDUSTRY_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.