Building BusinessServices

Section 24

Anti-Pollution Mask Making

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹25 lakh and ₹25 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Anti-Pollution Mask Making

—

Prepared on: 27 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹15.84 L
Term loan from bank
₹10.30 L
Promoter’s contribution
₹1.58 L
Subsidy
₹3.96 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.78 L
Average DSCR
-1.60
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Cut and stitch layered fabric and filter masks on sewing machines, test them and pack them.

Main product or serviceAnti-Pollution Mask Making
Installed capacity per year (at 100%)10,000 units

04 Market

  • City commuters
  • Construction and factory workers
  • People with allergies
  • Pharmacies and retail shops
  • Industrial safety suppliers
  • Online marketplaces

05 Plant and machinery

ItemQty₹Total ₹
Lockstitch sewing machines (× 15)11,80,0001,80,000
Flat-lock sewing machines (× 2)11,00,0001,00,000
Four-thread overlock machine140,00040,000
Cutting machine and packet patti cutter (× 2)133,00033,000
Permeability tester11,78,0001,78,000
Filtration tester11,00,0001,00,000
Stiffness tester114,50014,500
Slotted-angle racks, 9 levels (× 40)11,00,0001,00,000
Design desktops, laptops, printers, scanners and thermal label printers14,67,0754,67,075
Generator and 4 KW power backup11,06,0001,06,000
Furniture/decoration and air conditioner11,90,0001,90,000
Total15,08,575

Pre-filled from: PMEGP sample project report — Anti-Pollution Mask (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Front fabric, dry-fit layer, net layer and filter layer — average raw material ₹14.05 per O1 mask and ₹19.00 per O2 mask
  • Elastic, ribbon piping and thread — stitching items
  • PU clips, PU stoppers and labels — trims

07 Cost of project

₹ in lakh
Plant and machinery15.09
Contingency0.75
Total fixed capital15.84
Working capital margin0.00
Total project cost15.84

08 Means of finance

₹ in lakh%
Promoter’s contribution1.5810.0
Subsidy3.9625.0
Term loan from bank10.3065.0
Total15.84100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.320.320.320.320.320.320.32
Insurance0.080.080.080.080.080.080.08
Total cost of operations3.283.283.283.283.283.283.28
Operating profit (EBITDA)-3.28-3.28-3.28-3.28-3.28-3.28-3.28
Depreciation2.382.021.721.461.241.050.90
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.110.970.790.620.440.270.09
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-6.77-6.26-5.78-5.35-4.96-4.60-4.27
Income tax0.000.000.000.000.000.000.00
Profit after tax-6.77-6.26-5.78-5.35-4.96-4.60-4.27

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-6.77-6.26-5.78-5.35-4.96-4.60-4.27
Depreciation2.382.021.721.461.241.050.90
Cash accruals (PAT + depreciation)-4.39-4.24-4.07-3.89-3.72-3.54-3.37
Term loan repaid0.791.581.581.581.581.581.58
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.18-5.83-5.65-5.48-5.30-5.13-4.95
Cash and bank-5.18-11.01-16.66-22.14-27.44-32.57-37.52

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)5.545.545.545.545.545.545.54
Reserves and surplus-6.77-13.03-18.81-24.16-29.12-33.72-37.99
Term loan outstanding9.507.926.344.753.171.580.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities8.280.44-6.93-13.87-20.41-26.59-32.44
Net fixed assets13.4611.449.738.277.035.975.08
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.18-11.01-16.66-22.14-27.44-32.57-37.52
Total assets8.280.44-6.93-13.87-20.41-26.59-32.44

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.72-1.28-1.38-1.49-1.62-1.77-1.95
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.60
Lowest DSCR-1.95
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.382.021.721.461.241.050.90

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
110.301.110.799.50
29.500.971.587.92
37.920.791.586.34
46.340.621.584.75
54.750.441.583.17
63.170.271.581.58
71.580.091.580.00

17 Licences and registrations

  • GST
  • Udyam
  • Fire / pollution registration as required
  • BIS certification if sold as a respiratory protective device (e.g. IS 9473 for filtering half masks)
  • Legal Metrology registration for packaged goods
  • Trademark for the brand (optional)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Anti-Pollution Mask (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Air-Pollution_Mask_%28_Samadhan_Projects_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.