01 Project at a glance

Total project cost
₹5.11 L
Term loan from bank
₹3.32 L
Promoter’s contribution
₹0.51 L
Subsidy
₹1.28 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.82 L
Average DSCR
-4.55
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Make small filament bulbs for vehicles (6 V and 12 V, single or double filament) from glass tube, filament and caps.

Main product or serviceAuto Miniature Lamp (Vehicle Bulb) Making
Installed capacity per year (at 100%)10,000 units

04 Market

  • Auto spare-parts dealers
  • Vehicle workshops and mechanics
  • Vehicle owners buying replacements
  • Auto-parts wholesalers
  • Retail spare-parts shops

05 Plant and machinery

ItemQty₹Total ₹
Exhaust bench, 24 heads, with purifying tower set, gas control valve and vacuum (× 4)11,14,0001,14,000
Vacuum unit (× 4)11,12,0001,12,000
Spot welding machine (× 4)180,00080,000
Stem making machine, 12 heads138,50038,500
Sealing machine, 12 heads138,00038,000
Flare making machine, 10 heads135,00035,000
Capping machine, 36 heads118,00018,000
Ageing rack with 5 kVA multi-tapped transformer114,00014,000
Photometric integrator, 24" dia110,00010,000
Glass tube cutter, pre-focus machine, air blower, soldering sets, vibration and torsion testers, wire cutter and bender, cap engraver (× 1 lot)127,60027,600
Total4,87,100

Pre-filled from: DC-MSME project profile — Auto Miniature Lamp; DGFT — ITC(HS) classification of export and import items. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Ready coil filaments (6 V, 12 V; 12, 24, 36 W) — 75,000 a month, ₹7,500
  • Lamp caps, assorted — 75,000 a month at ₹455 per 1,000 = ₹34,125
  • Glass shells — 75,000 a month at ₹400 per 1,000 = ₹30,000
  • Lead-in wire — 1,50,000 a month at ₹22 per 1,000 = ₹3,300
  • Solder wire, capping cement, chemicals and packing — ₹17,125 a month

07 Cost of project

₹ in lakh
Plant and machinery4.87
Contingency0.24
Total fixed capital5.11
Working capital margin0.00
Total project cost5.11

08 Means of finance

₹ in lakh%
Promoter’s contribution0.5110.0
Subsidy1.2825.0
Term loan from bank3.3265.0
Total5.11100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.100.100.100.100.100.100.10
Insurance0.030.030.030.030.030.030.03
Total cost of operations3.013.013.013.013.013.013.01
Operating profit (EBITDA)-3.01-3.01-3.01-3.01-3.01-3.01-3.01
Depreciation0.770.650.550.470.400.340.29
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.360.310.260.200.140.090.03
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-4.13-3.97-3.82-3.68-3.55-3.44-3.33
Income tax0.000.000.000.000.000.000.00
Profit after tax-4.13-3.97-3.82-3.68-3.55-3.44-3.33

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-4.13-3.97-3.82-3.68-3.55-3.44-3.33
Depreciation0.770.650.550.470.400.340.29
Cash accruals (PAT + depreciation)-3.37-3.32-3.26-3.21-3.15-3.09-3.04
Term loan repaid0.260.510.510.510.510.510.51
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.62-3.83-3.77-3.72-3.66-3.61-3.55
Cash and bank-3.62-7.45-11.23-14.95-18.61-22.22-25.77

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.791.791.791.791.791.791.79
Reserves and surplus-4.13-8.11-11.92-15.60-19.15-22.59-25.92
Term loan outstanding3.072.562.051.531.020.510.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities0.72-3.76-8.09-12.28-16.34-20.29-24.13
Net fixed assets4.353.703.142.672.271.931.64
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.62-7.45-11.23-14.95-18.61-22.22-25.77
Total assets0.72-3.76-8.09-12.28-16.34-20.29-24.13

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-4.89-3.65-3.92-4.23-4.60-5.03-5.55
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-4.55
Lowest DSCR-5.55
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.770.650.550.470.400.340.29

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
13.320.360.263.07
23.070.310.512.56
32.560.260.512.05
42.050.200.511.53
51.530.140.511.02
61.020.090.510.51
70.510.030.510.00

17 Licences and registrations

  • Udyam registration
  • GST
  • Trade licence from the local body
  • State Pollution Control Board consent (glass-working burners)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Auto Miniature Lamp — https://www.dcmsme.gov.in/publications/pmryprof/electrical/ch3.pdf
  2. DGFT — ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.