Building BusinessServices

Section 24

Automotive Air Filter Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹21.78 lakh and ₹21.78 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Automotive Air Filter Manufacturing

—

Prepared on: 27 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹13.13 L
Term loan from bank
₹8.53 L
Promoter’s contribution
₹1.31 L
Subsidy
₹3.28 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.29 L
Average DSCR
-1.89
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Make engine air filters from steel canisters, cast caps and pleated filter paper for vehicles.

Main product or serviceAutomotive Air Filter Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Vehicle owners at routine service
  • Garages and service workshops
  • Vehicle and engine makers
  • Auto spare-parts dealers
  • Direct supply to workshops and fleets
  • Supply to vehicle makers

05 Plant and machinery

ItemQty₹Total ₹
Treadle guillotine shearing machine (× —)100
Power press (5 ton in the flow chart) (× —)100
Tilting furnace, 10 kg aluminium, HSD-fired with 1 KVA blower (× —)100
Lathe (adda type) with 1 KW motor (× —)100
Milling machine (adda type) with 1 KW motor (× —)100
Surface grinding machine, manual feed, 2 KW (× —)100
Fly presses of different sizes (× —)100
Motorised hand shearing machine (sheet cutter) (× —)100
Spot welding machine 1 KVA and gas welding sets (× —)100
Buffing machine (8" wheel) and bench drilling machine (13 mm) (× —)100
Total plant and machinery (no item-wise prices printed) (× —)112,50,00012,50,000
Total12,50,000

Pre-filled from: PMEGP sample project report — Automotive Air Filter (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • CRCA sheets — for canisters and perforated barrels
  • Cast aluminium / zinc or moulded plastic parts — top and bottom rims and enclosures
  • Filter paper, non-woven fabric, wire mesh and PU foam — chosen for wet strength, porosity, particle retention and flow rate
  • Rivets and fasteners — all materials are available in India, says the report

07 Cost of project

₹ in lakh
Plant and machinery12.50
Contingency0.63
Total fixed capital13.13
Working capital margin0.00
Total project cost13.13

08 Means of finance

₹ in lakh%
Promoter’s contribution1.3110.0
Subsidy3.2825.0
Term loan from bank8.5365.0
Total13.13100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.260.260.260.260.260.260.26
Insurance0.070.070.070.070.070.070.07
Total cost of operations3.213.213.213.213.213.213.21
Operating profit (EBITDA)-3.21-3.21-3.21-3.21-3.21-3.21-3.21
Depreciation1.971.671.421.211.030.870.74
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.920.800.660.510.370.220.08
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-6.10-5.68-5.29-4.93-4.60-4.30-4.03
Income tax0.000.000.000.000.000.000.00
Profit after tax-6.10-5.68-5.29-4.93-4.60-4.30-4.03

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-6.10-5.68-5.29-4.93-4.60-4.30-4.03
Depreciation1.971.671.421.211.030.870.74
Cash accruals (PAT + depreciation)-4.13-4.01-3.86-3.72-3.58-3.43-3.29
Term loan repaid0.661.311.311.311.311.311.31
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-4.79-5.32-5.18-5.03-4.89-4.74-4.60
Cash and bank-4.79-10.11-15.28-20.32-25.20-29.95-34.55

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)4.594.594.594.594.594.594.59
Reserves and surplus-6.10-11.78-17.07-22.00-26.60-30.90-34.93
Term loan outstanding7.886.565.253.942.631.310.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities6.37-0.63-7.22-13.47-19.38-25.00-30.34
Net fixed assets11.169.488.066.855.824.954.21
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-4.79-10.11-15.28-20.32-25.20-29.95-34.55
Total assets6.37-0.63-7.22-13.47-19.38-25.00-30.34

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-2.03-1.52-1.63-1.76-1.91-2.09-2.31
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.89
Lowest DSCR-2.31
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation1.971.671.421.211.030.870.74

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
18.530.920.667.88
27.880.801.316.56
36.560.661.315.25
45.250.511.313.94
53.940.371.312.63
62.630.221.311.31
71.310.081.310.00

17 Licences and registrations

  • GST
  • Fire NOC
  • Pollution control NOC (if applicable)
  • Udyam registration
  • BIS certification
  • Labour licence
  • Trademark (optional)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus

19 Sources

  1. PMEGP sample project report — Automotive Air Filter (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Automotive_Air_Filter_%28_Samadhan_Projects_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.