Building BusinessServices

Section 24

Baby Diaper Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹20.56 lakh and ₹20.56 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Baby Diaper Manufacturing

—

Prepared on: 27 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹15.23 L
Term loan from bank
₹9.90 L
Promoter’s contribution
₹1.52 L
Subsidy
₹3.81 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.67 L
Average DSCR
-1.66
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Make disposable baby diapers from fluff pulp, absorbent polymer, non-woven fabric and PE film on a line machine.

Main product or serviceBaby Diaper Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Parents of babies
  • Chemists and baby-care stores
  • Supermarkets and kirana shops
  • Hospitals and maternity homes
  • Distributors and wholesalers
  • Retail packs in plastic or paper bags
  • Private-label supply

05 Plant and machinery

ItemQty₹Total ₹
Diaper line: pulp feeding frame, pulp grinder (fluff mill) with reject-fibre collector, pad forming and wrapping system, hot-melt adhesive system, pad conveyor, drive system, counter-stacker (× 1 line)100
Packing machine (pedal-operated or continuous heat sealer; carton packing optional) (× —)100
Other assets: testing devices, spares, generator, safety equipment, computer and printer (× —)11,00,0001,00,000
Total plant and machinery (no item-wise prices printed) (× —)113,50,00013,50,000
Total14,50,000

Pre-filled from: PMEGP sample project report — Baby Diaper (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Wood pulp (cellulose) sheets — crushed into fluff for the absorbent pad
  • Sodium polyacrylate (super-absorbent polymer, SAP) — improves retention and allows a thinner diaper
  • Hydrophilic and hydrophobic non-woven fabric — top sheet and leg cuffs
  • Polyethylene or cloth-like back-sheet film — stops leaks
  • Tissue, hot-melt adhesive, elastics, side and frontal tapes — assembly materials

07 Cost of project

₹ in lakh
Plant and machinery14.50
Contingency0.73
Total fixed capital15.23
Working capital margin0.00
Total project cost15.23

08 Means of finance

₹ in lakh%
Promoter’s contribution1.5210.0
Subsidy3.8125.0
Term loan from bank9.9065.0
Total15.23100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.300.300.300.300.300.300.30
Insurance0.080.080.080.080.080.080.08
Total cost of operations3.263.263.263.263.263.263.26
Operating profit (EBITDA)-3.26-3.26-3.26-3.26-3.26-3.26-3.26
Depreciation2.281.941.651.401.191.010.86
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.070.930.760.590.430.260.09
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-6.62-6.13-5.67-5.26-4.88-4.53-4.21
Income tax0.000.000.000.000.000.000.00
Profit after tax-6.62-6.13-5.67-5.26-4.88-4.53-4.21

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-6.62-6.13-5.67-5.26-4.88-4.53-4.21
Depreciation2.281.941.651.401.191.010.86
Cash accruals (PAT + depreciation)-4.33-4.19-4.02-3.85-3.69-3.52-3.35
Term loan repaid0.761.521.521.521.521.521.52
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.09-5.71-5.54-5.38-5.21-5.04-4.87
Cash and bank-5.09-10.80-16.35-21.72-26.93-31.97-36.85

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)5.335.335.335.335.335.335.33
Reserves and surplus-6.62-12.75-18.42-23.67-28.55-33.08-37.30
Term loan outstanding9.147.616.094.573.051.520.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities7.850.20-7.00-13.78-20.18-26.23-31.97
Net fixed assets12.9411.009.357.956.765.744.88
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.09-10.80-16.35-21.72-26.93-31.97-36.85
Total assets7.850.20-7.00-13.78-20.18-26.23-31.97

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.78-1.33-1.43-1.54-1.67-1.83-2.02
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.66
Lowest DSCR-2.02
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.281.941.651.401.191.010.86

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
19.901.070.769.14
29.140.931.527.61
37.610.761.526.09
46.090.591.524.57
54.570.431.523.05
63.050.261.521.52
71.520.091.520.00

17 Licences and registrations

  • MSME Udyam registration (named in the report)
  • GST registration (named in the report)
  • Other state licences depend on area and machinery, says the report — check with your district industries centre
  • BIS standard for baby diapers (confirm with BIS)
  • Trademark for your brand

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus

19 Sources

  1. PMEGP sample project report — Baby Diaper (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Baby_Diaper_%28_Samadhan_Projects_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.