Electric Tandoor Manufacturing

—

Prepared on: 26 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹6.84 L
Term loan from bank
₹4.45 L
Promoter’s contribution
₹0.68 L
Subsidy
₹1.71 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-4.13 L
Average DSCR
-3.45
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Make electric tandoors from steel sheet, heating wire and thermostats for homes and eateries.

Main product or serviceElectric Tandoor Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Households
  • Hotels, restaurants and dhabas
  • Electrical appliance dealers
  • Hotel and kitchen equipment suppliers

05 Plant and machinery

ItemQty₹Total ₹
Double bench grinder17,5007,500
Sheet rolling machine12,00,0002,00,000
Drill machine114,00014,000
Shearing machine12,25,0002,25,000
Power hacksaw145,00045,000
Air compressor with painting gun125,00025,000
Hand press No. 8115,00015,000
Power press195,00095,000
Tools, dies and fixtures (× 1 lot)125,00025,000
Testing set (megger, high-voltage tester, digital multimeter, test panel, leakage and earthing testers, variable transformer) (× 1 set)100
Total6,51,500

Pre-filled from: KVIC Project Profile — Electric Tandoor (PMEGP); PMEGP sample project report — Electric Tandoor (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • CRC sheet — 8,000 kg a year at ₹38 per kg
  • Nichrome resistance wire — 50 kg a year at ₹1,800 per kg
  • Ceramic roofs — 9,000 pieces at ₹15
  • Bakelite handles — 9,000 pieces at ₹50
  • Thermostats — 9,000 pieces at ₹140 — the biggest raw-material cost

07 Cost of project

₹ in lakh
Plant and machinery6.52
Contingency0.33
Total fixed capital6.84
Working capital margin0.00
Total project cost6.84

08 Means of finance

₹ in lakh%
Promoter’s contribution0.6810.0
Subsidy1.7125.0
Term loan from bank4.4565.0
Total6.84100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.140.140.140.140.140.140.14
Insurance0.030.030.030.030.030.030.03
Total cost of operations3.053.053.053.053.053.053.05
Operating profit (EBITDA)-3.05-3.05-3.05-3.05-3.05-3.05-3.05
Depreciation1.030.870.740.630.540.460.39
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.480.420.340.270.190.120.04
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-4.56-4.34-4.13-3.95-3.78-3.62-3.48
Income tax0.000.000.000.000.000.000.00
Profit after tax-4.56-4.34-4.13-3.95-3.78-3.62-3.48

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-4.56-4.34-4.13-3.95-3.78-3.62-3.48
Depreciation1.030.870.740.630.540.460.39
Cash accruals (PAT + depreciation)-3.53-3.47-3.39-3.32-3.24-3.17-3.09
Term loan repaid0.340.680.680.680.680.680.68
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.87-4.15-4.08-4.00-3.93-3.85-3.78
Cash and bank-3.87-8.03-12.10-16.10-20.03-23.88-27.66

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)2.392.392.392.392.392.392.39
Reserves and surplus-4.56-8.90-13.03-16.98-20.76-24.38-27.86
Term loan outstanding4.103.422.742.051.370.680.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities1.94-3.08-7.90-12.53-17.00-21.30-25.47
Net fixed assets5.814.944.203.573.042.582.19
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.87-8.03-12.10-16.10-20.03-23.88-27.66
Total assets1.94-3.08-7.90-12.53-17.00-21.30-25.47

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-3.71-2.77-2.97-3.21-3.49-3.81-4.21
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-3.45
Lowest DSCR-4.21
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation1.030.870.740.630.540.460.39

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
14.450.480.344.10
24.100.420.683.42
33.420.340.682.74
42.740.270.682.05
52.050.190.681.37
61.370.120.680.68
70.680.040.680.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Pollution Control Board NOC (listed in the sample report)
  • BIS certification if a Quality Control Order covers the product (check the BIS list)
  • Trademark for your brand name (optional)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. KVIC Project Profile — Electric Tandoor (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/ELECTRIC_TANDOOR_%28_RURAL_ENGG._AND_BIO-TECH_INDUSTRY_%29.pdf
  2. PMEGP sample project report — Electric Tandoor (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Electric_Tandoor_%28_Samadhan_Projects_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.