Detailed Project Report
Electric Tandoor Manufacturing
—
Prepared on: 26 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)
01 Project at a glance
- Total project cost
- ₹6.84 L
- Term loan from bank
- ₹4.45 L
- Promoter’s contribution
- ₹0.68 L
- Subsidy
- ₹1.71 L
- Sales · Year 3
- ₹0.00 L
- Profit after tax · Year 3
- ₹-4.13 L
- Average DSCR
- -3.45
- Break-even (% of capacity used)
- —
02 Promoter and unit
| Promoter name | — |
|---|---|
| Business / firm name | — |
| Legal form | Proprietorship |
| Address of the unit | — |
| Applicant category | General · Rural |
03 The project
Make electric tandoors from steel sheet, heating wire and thermostats for homes and eateries.
| Main product or service | Electric Tandoor Manufacturing |
|---|---|
| Installed capacity per year (at 100%) | 10,000 units |
04 Market
- Households
- Hotels, restaurants and dhabas
- Electrical appliance dealers
- Hotel and kitchen equipment suppliers
05 Plant and machinery
| Item | Qty | ₹ | Total ₹ |
|---|---|---|---|
| Double bench grinder | 1 | 7,500 | 7,500 |
| Sheet rolling machine | 1 | 2,00,000 | 2,00,000 |
| Drill machine | 1 | 14,000 | 14,000 |
| Shearing machine | 1 | 2,25,000 | 2,25,000 |
| Power hacksaw | 1 | 45,000 | 45,000 |
| Air compressor with painting gun | 1 | 25,000 | 25,000 |
| Hand press No. 8 | 1 | 15,000 | 15,000 |
| Power press | 1 | 95,000 | 95,000 |
| Tools, dies and fixtures (× 1 lot) | 1 | 25,000 | 25,000 |
| Testing set (megger, high-voltage tester, digital multimeter, test panel, leakage and earthing testers, variable transformer) (× 1 set) | 1 | 0 | 0 |
| Total | 6,51,500 |
Pre-filled from: KVIC Project Profile — Electric Tandoor (PMEGP); PMEGP sample project report — Electric Tandoor (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.
06 Raw materials
- CRC sheet — 8,000 kg a year at ₹38 per kg
- Nichrome resistance wire — 50 kg a year at ₹1,800 per kg
- Ceramic roofs — 9,000 pieces at ₹15
- Bakelite handles — 9,000 pieces at ₹50
- Thermostats — 9,000 pieces at ₹140 — the biggest raw-material cost
07 Cost of project
| ₹ in lakh | |
|---|---|
| Plant and machinery | 6.52 |
| Contingency | 0.33 |
| Total fixed capital | 6.84 |
| Working capital margin | 0.00 |
| Total project cost | 6.84 |
08 Means of finance
| ₹ in lakh | % | |
|---|---|---|
| Promoter’s contribution | 0.68 | 10.0 |
| Subsidy | 1.71 | 25.0 |
| Term loan from bank | 4.45 | 65.0 |
| Total | 6.84 | 100.0 |
| Working capital loan (outside project cost) | 0.00 |
09 Key assumptions
| Selling price | ₹0 per units |
|---|---|
| Raw material & packing cost | ₹0 per units |
| Capacity used each year | 60% · 70% · 80% · 80% · 80% · 80% · 80% |
| Term loan interest rate (% a year) | 11% · 84 months (Moratorium 6) |
| Working capital method | Turnover method (RBI) · Working capital interest (% a year) 11% |
| Income tax rate | 25% |
| Yearly price and cost rise | 0% |
10 Production and sales
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Capacity used | 60% | 70% | 80% | 80% | 80% | 80% | 80% |
| Production (units) | 6,000 | 7,000 | 8,000 | 8,000 | 8,000 | 8,000 | 8,000 |
| Sales | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
11 Projected profitability
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Sales | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Raw material and packing | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Power and fuel | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Salaries and wages | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 |
| Rent | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Administration | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Selling and distribution | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Repairs and maintenance | 0.14 | 0.14 | 0.14 | 0.14 | 0.14 | 0.14 | 0.14 |
| Insurance | 0.03 | 0.03 | 0.03 | 0.03 | 0.03 | 0.03 | 0.03 |
| Total cost of operations | 3.05 | 3.05 | 3.05 | 3.05 | 3.05 | 3.05 | 3.05 |
| Operating profit (EBITDA) | -3.05 | -3.05 | -3.05 | -3.05 | -3.05 | -3.05 | -3.05 |
| Depreciation | 1.03 | 0.87 | 0.74 | 0.63 | 0.54 | 0.46 | 0.39 |
| Preliminary expenses written off | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest on term loan | 0.48 | 0.42 | 0.34 | 0.27 | 0.19 | 0.12 | 0.04 |
| Interest on working capital | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Profit before tax | -4.56 | -4.34 | -4.13 | -3.95 | -3.78 | -3.62 | -3.48 |
| Income tax | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Profit after tax | -4.56 | -4.34 | -4.13 | -3.95 | -3.78 | -3.62 | -3.48 |
12 Cash flow
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Profit after tax | -4.56 | -4.34 | -4.13 | -3.95 | -3.78 | -3.62 | -3.48 |
| Depreciation | 1.03 | 0.87 | 0.74 | 0.63 | 0.54 | 0.46 | 0.39 |
| Cash accruals (PAT + depreciation) | -3.53 | -3.47 | -3.39 | -3.32 | -3.24 | -3.17 | -3.09 |
| Term loan repaid | 0.34 | 0.68 | 0.68 | 0.68 | 0.68 | 0.68 | 0.68 |
| Owner’s drawings | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Surplus after repayment | -3.87 | -4.15 | -4.08 | -4.00 | -3.93 | -3.85 | -3.78 |
| Cash and bank | -3.87 | -8.03 | -12.10 | -16.10 | -20.03 | -23.88 | -27.66 |
13 Projected balance sheet
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Capital (own + subsidy) | 2.39 | 2.39 | 2.39 | 2.39 | 2.39 | 2.39 | 2.39 |
| Reserves and surplus | -4.56 | -8.90 | -13.03 | -16.98 | -20.76 | -24.38 | -27.86 |
| Term loan outstanding | 4.10 | 3.42 | 2.74 | 2.05 | 1.37 | 0.68 | 0.00 |
| Working capital loan | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Total liabilities | 1.94 | -3.08 | -7.90 | -12.53 | -17.00 | -21.30 | -25.47 |
| Net fixed assets | 5.81 | 4.94 | 4.20 | 3.57 | 3.04 | 2.58 | 2.19 |
| Preliminary expenses not written off | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Current assets (stock and debtors) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Cash and bank | -3.87 | -8.03 | -12.10 | -16.10 | -20.03 | -23.88 | -27.66 |
| Total assets | 1.94 | -3.08 | -7.90 | -12.53 | -17.00 | -21.30 | -25.47 |
14 Ratios and break-even
| Year | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Debt service coverage ratio (DSCR) | -3.71 | -2.77 | -2.97 | -3.21 | -3.49 | -3.81 | -4.21 |
| Break-even (% of capacity used) | — | — | — | — | — | — | — |
| Cash break-even | — | — | — | — | — | — | — |
| Average DSCR | -3.45 |
|---|---|
| Lowest DSCR | -4.21 |
| Payback period | — |
15 Depreciation
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Depreciation | 1.03 | 0.87 | 0.74 | 0.63 | 0.54 | 0.46 | 0.39 |
Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.
16 Term loan repayment
| Year | Opening | Interest | Term loan repaid | Closing |
|---|---|---|---|---|
| 1 | 4.45 | 0.48 | 0.34 | 4.10 |
| 2 | 4.10 | 0.42 | 0.68 | 3.42 |
| 3 | 3.42 | 0.34 | 0.68 | 2.74 |
| 4 | 2.74 | 0.27 | 0.68 | 2.05 |
| 5 | 2.05 | 0.19 | 0.68 | 1.37 |
| 6 | 1.37 | 0.12 | 0.68 | 0.68 |
| 7 | 0.68 | 0.04 | 0.68 | 0.00 |
17 Licences and registrations
- Udyam registration
- GST registration
- Pollution Control Board NOC (listed in the sample report)
- BIS certification if a Quality Control Order covers the product (check the BIS list)
- Trademark for your brand name (optional)
18 Government schemes that may apply
- Prime Minister's Employment Generation Programme (PMEGP)
- Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
- Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
19 Sources
- KVIC Project Profile — Electric Tandoor (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/ELECTRIC_TANDOOR_%28_RURAL_ENGG._AND_BIO-TECH_INDUSTRY_%29.pdf
- PMEGP sample project report — Electric Tandoor (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Electric_Tandoor_%28_Samadhan_Projects_%29.pdf