Building BusinessServices

Section 24

Electronic Door Bell Assembly

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹1.6 lakh and ₹1.6 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Electronic Door Bell Assembly

—

Prepared on: 26 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹0.53 L
Term loan from bank
₹0.34 L
Promoter’s contribution
₹0.05 L
Subsidy
₹0.13 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-2.98 L
Average DSCR
-42.66
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Assemble musical door bells from ready chips, speakers and casings — a tiny home-sized electronics unit.

Main product or serviceElectronic Door Bell Assembly
Installed capacity per year (at 100%)10,000 units

04 Market

  • Households
  • Builders and electricians fitting new homes
  • Electrical and hardware shops
  • Wholesalers

05 Plant and machinery

ItemQty₹Total ₹
10 MHz oscilloscope100
Multimeters (× 1 set)100
Low-cost DC power supply100
Hand tools, jigs and fixtures; office equipment, furniture and work table (× 1 lot)150,00050,000
Total50,000

Pre-filled from: KVIC Project Profile — Electronic Door Bells (PMEGP). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Melody ICs (about 16 tunes), speakers, small amplifier parts, PCBs and casings — raw material ₹3.36 lakh a year at full capacity
  • Labels and packing — ₹75,000 a year

07 Cost of project

₹ in lakh
Plant and machinery0.50
Contingency0.03
Total fixed capital0.53
Working capital margin0.00
Total project cost0.53

08 Means of finance

₹ in lakh%
Promoter’s contribution0.0510.0
Subsidy0.1325.0
Term loan from bank0.3465.0
Total0.53100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.010.010.010.010.010.010.01
Insurance0.000.000.000.000.000.000.00
Total cost of operations2.892.892.892.892.892.892.89
Operating profit (EBITDA)-2.89-2.89-2.89-2.89-2.89-2.89-2.89
Depreciation0.080.070.060.050.040.030.03
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.040.030.030.020.010.010.00
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.01-2.99-2.98-2.96-2.95-2.94-2.93
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.01-2.99-2.98-2.96-2.95-2.94-2.93

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.01-2.99-2.98-2.96-2.95-2.94-2.93
Depreciation0.080.070.060.050.040.030.03
Cash accruals (PAT + depreciation)-2.93-2.93-2.92-2.91-2.91-2.90-2.90
Term loan repaid0.030.050.050.050.050.050.05
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-2.96-2.98-2.97-2.97-2.96-2.95-2.95
Cash and bank-2.96-5.93-8.91-11.87-14.83-17.79-20.74

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.180.180.180.180.180.180.18
Reserves and surplus-3.01-6.00-8.98-11.94-14.89-17.82-20.75
Term loan outstanding0.320.260.210.160.110.050.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-2.51-5.55-8.58-11.60-14.60-17.59-20.57
Net fixed assets0.450.380.320.270.230.200.17
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-2.96-5.93-8.91-11.87-14.83-17.79-20.74
Total assets-2.51-5.55-8.58-11.60-14.60-17.59-20.57

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-45.79-34.24-36.75-39.66-43.07-47.12-52.01
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-42.66
Lowest DSCR-52.01
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.080.070.060.050.040.030.03

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
10.340.040.030.32
20.320.030.050.26
30.260.030.050.21
40.210.020.050.16
50.160.010.050.11
60.110.010.050.05
70.050.000.050.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • BIS certification if a Quality Control Order covers the product (check the BIS list)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Mukhyamantri Yuva Udyami Vikas Abhiyan (CM-YUVA)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. KVIC Project Profile — Electronic Door Bells (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/ELECTRONIC_DOOR_BELLS_%28_RURAL_ENGG._AND_BIO-TECH_INDUSTRY_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.