Building BusinessServices

Section 24

MS Fabrication / Steel Furniture Unit

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹4.6 lakh and ₹43.84 lakh.

Legal form
Applicant category
Location

Detailed Project Report

MS Fabrication / Steel Furniture Unit

—

Prepared on: 26 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹3.69 L
Term loan from bank
₹2.40 L
Promoter’s contribution
₹0.37 L
Subsidy
₹0.92 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.56 L
Average DSCR
-6.24
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Gates, grills, almirahs, tables and chairs — made to order with a welding machine.

Main product or serviceMS Fabrication / Steel Furniture Unit
Installed capacity per year (at 100%)10,000 units

04 Market

  • Owners and builders of new or remodelled houses and commercial buildings (gates, grills, railings, fences)
  • Households, offices, shops, schools and libraries (almirahs, tables, chairs, racks)
  • Industrial and commercial establishments
  • Direct orders from building owners and contractors
  • Furniture and hardware dealers
  • Supply orders from offices and institutions

05 Plant and machinery

ItemQty₹Total ₹
Flat / wire rod twisting machine140,00040,000
Shearing machine (× 3)136,00036,000
Fly press120,00020,000
Manual press brake140,00040,000
Hand drills and tools120,00020,000
Pickling and surface treatment set-up175,00075,000
Sand blasting facility125,00025,000
Spray painting facility115,00015,000
Pipe bending machine110,00010,000
Welding machine (× 2)150,00050,000
Dies, tools and other equipment (× 1 lot)110,00010,000
Hand tools and gauges (× 1 lot)110,00010,000
Total3,51,000

Pre-filled from: UP MSME 1-Connect (Govt of UP, RAMP) – Project Report: Fabrication of Grills & Gates; ni-msme Hyderabad project profiles compiled on Bihar Udyami portal (Project_profiles.pdf). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Mild steel sections, flats, rods and pipes — for railings, fences, grills and gates – the main product line in the UP report
  • Stainless steel square and round pipes — ₹210 per kg in the ni-msme steel-furniture profile
  • Stainless steel sheets and strips — ₹150 per kg in the ni-msme profile
  • Glass sheet — for table tops; ₹120 per sq ft in the ni-msme profile
  • Welding electrodes, cutting blades, screws, cutting fluid, cotton waste — consumables, available in the local market

07 Cost of project

₹ in lakh
Plant and machinery3.51
Contingency0.18
Total fixed capital3.69
Working capital margin0.00
Total project cost3.69

08 Means of finance

₹ in lakh%
Promoter’s contribution0.3710.0
Subsidy0.9225.0
Term loan from bank2.4065.0
Total3.69100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.070.070.070.070.070.070.07
Insurance0.020.020.020.020.020.020.02
Total cost of operations2.972.972.972.972.972.972.97
Operating profit (EBITDA)-2.97-2.97-2.97-2.97-2.97-2.97-2.97
Depreciation0.550.470.400.340.290.250.21
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.260.220.180.140.100.060.02
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.78-3.67-3.56-3.46-3.36-3.28-3.20
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.78-3.67-3.56-3.46-3.36-3.28-3.20

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.78-3.67-3.56-3.46-3.36-3.28-3.20
Depreciation0.550.470.400.340.290.250.21
Cash accruals (PAT + depreciation)-3.23-3.20-3.16-3.12-3.08-3.03-2.99
Term loan repaid0.180.370.370.370.370.370.37
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.42-3.57-3.52-3.48-3.44-3.40-3.36
Cash and bank-3.42-6.98-10.51-13.99-17.43-20.84-24.20

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.291.291.291.291.291.291.29
Reserves and surplus-3.78-7.45-11.01-14.46-17.83-21.11-24.31
Term loan outstanding2.211.841.471.110.740.370.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-0.28-4.32-8.24-12.07-15.80-19.45-23.02
Net fixed assets3.132.662.261.921.641.391.18
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.42-6.98-10.51-13.99-17.43-20.84-24.20
Total assets-0.28-4.32-8.24-12.07-15.80-19.45-23.02

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-6.70-5.01-5.38-5.80-6.30-6.90-7.61
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-6.24
Lowest DSCR-7.61
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.550.470.400.340.290.250.21

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
12.400.260.182.21
22.210.220.371.84
31.840.180.371.47
41.470.140.371.11
51.110.100.370.74
60.740.060.370.37
70.370.020.370.00

17 Licences and registrations

  • Udyam registration
  • GST
  • UPPCB consent (if you do painting/powder-coating or run a larger unit — check the category)
  • Factory licence if 10+ workers with power
  • Commercial/industrial electricity connection

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Mukhyamantri Yuva Udyami Vikas Abhiyan (CM-YUVA)
  • Stand-Up India

19 Sources

  1. UP MSME 1-Connect (Govt of UP, RAMP) – Project Report: Fabrication of Grills & Gates — https://msme1connect.up.gov.in/Projectreport/Project%20Report638665747150126666.pdf
  2. ni-msme Hyderabad project profiles compiled on Bihar Udyami portal (Project_profiles.pdf) — https://udyami.bihar.gov.in/pdf/Project_profiles.pdf
  3. World Customs Organization – HS Nomenclature 2022, Chapter 94 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/2094_2022e.pdf
  4. World Customs Organization – HS Nomenclature 2022, Chapter 73 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/1573_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.