Small Transformer for Electronics

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹9.68 lakh and ₹9.68 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Small Transformer for Electronics

—

Prepared on: 27 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹1.43 L
Term loan from bank
₹0.93 L
Promoter’s contribution
₹0.14 L
Subsidy
₹0.36 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.14 L
Average DSCR
-15.81
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Wind small low-voltage step-down transformers for adaptors, appliances and repair shops.

Main product or serviceSmall Transformer for Electronics
Installed capacity per year (at 100%)10,000 units

04 Market

  • Electronics repair shops
  • Makers of adaptors, inverters and small appliances
  • Electrical and electronics wholesalers
  • Direct supply to local manufacturers
  • Electronics wholesale markets

05 Plant and machinery

ItemQty₹Total ₹
Coil winding machine (× 2)110,00010,000
Power press, 20 tonne150,00050,000
Treadle shearing machine, 1,200 mm115,00015,000
Hand-operated plastic injection moulding machine, 25 g16,0006,000
Dies (× LS)15,5005,500
Baking equipment16,0006,000
Power analyser13,0003,000
Multimeter (× 2)13,0003,000
Variac, 2 A (0–300 V)12,5002,500
Electrification and installation (× LS)110,00010,000
Tools, jigs and fixtures (× LS)15,0005,000
Office equipment and working tables (× LS)120,00020,000
Total1,36,000

Pre-filled from: PMEGP sample project report — Small Transformer For Electronics Purpose (prepared by Udyami/Samadhan); World Customs Organization – HS Nomenclature 2022 edition. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Super enamelled copper wire, 18–46 SWG — 2,220 kg a year at ₹300 a kg = ₹6.66 L (full capacity)
  • Lamination (high silicon steel) — 8,400 kg a year at ₹30 a kg = ₹2.52 L
  • HDPE plastic granules — 120 kg a year at ₹50 a kg
  • Insulating material, clamps and hardware, packing — ₹24,000 + ₹30,000 + ₹30,000 a year

07 Cost of project

₹ in lakh
Plant and machinery1.36
Contingency0.07
Total fixed capital1.43
Working capital margin0.00
Total project cost1.43

08 Means of finance

₹ in lakh%
Promoter’s contribution0.1410.0
Subsidy0.3625.0
Term loan from bank0.9365.0
Total1.43100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.030.030.030.030.030.030.03
Insurance0.010.010.010.010.010.010.01
Total cost of operations2.922.922.922.922.922.922.92
Operating profit (EBITDA)-2.92-2.92-2.92-2.92-2.92-2.92-2.92
Depreciation0.210.180.150.130.110.100.08
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.100.090.070.060.040.020.01
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.23-3.18-3.14-3.10-3.07-3.03-3.00
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.23-3.18-3.14-3.10-3.07-3.03-3.00

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.23-3.18-3.14-3.10-3.07-3.03-3.00
Depreciation0.210.180.150.130.110.100.08
Cash accruals (PAT + depreciation)-3.02-3.00-2.99-2.97-2.96-2.94-2.92
Term loan repaid0.070.140.140.140.140.140.14
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.09-3.15-3.13-3.11-3.10-3.08-3.07
Cash and bank-3.09-6.23-9.36-12.48-15.58-18.66-21.73

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.500.500.500.500.500.500.50
Reserves and surplus-3.23-6.42-9.56-12.66-15.73-18.76-21.77
Term loan outstanding0.860.710.570.430.290.140.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-1.87-5.20-8.49-11.73-14.94-18.12-21.27
Net fixed assets1.211.030.880.750.630.540.46
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.09-6.23-9.36-12.48-15.58-18.66-21.73
Total assets-1.87-5.20-8.49-11.73-14.94-18.12-21.27

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-16.96-12.69-13.62-14.69-15.96-17.46-19.27
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-15.81
Lowest DSCR-19.27
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.210.180.150.130.110.100.08

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
10.930.100.070.86
20.860.090.140.71
30.710.070.140.57
40.570.060.140.43
50.430.040.140.29
60.290.020.140.14
70.140.010.140.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Trade licence from the local body

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Small Transformer For Electronics Purpose (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Small_Transformer_For_Electronics_Purpose_%28_Samadhan_Projects_%29.pdf
  2. World Customs Organization – HS Nomenclature 2022 edition — https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition/hs-nomenclature-2022-edition.aspx

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.