§1What this business is

Concrete of cement, gravel (rodi) and sand (bajari) is poured into moulds with tensioned PC wire, vibrated, left to set for 42–72 hours, de-tensioned and lifted out with a chain pulley on a gantry, then water-cured for 10–15 days. Poles are used for wire fencing; slotted posts with panels make precast boundary walls of 6 and 8 ft height for homes, farms, factories and plots.

Capacity: Poles: 2,000 ft a day, 6,00,000 ft a year. Wall panels: 1,000 sq ft a day, 3,00,000 sq ft a year (8-hour shift, 25 days a month).

§2Is it right for you?

Who it is for

Someone near growing towns or farm areas with contacts among builders, farmers and contractors.

Who it is not for

Someone without yard space.

Advantages

  • Steady demand for farm fencing and plot boundaries
  • Faster and lower-maintenance than brick walls (report)
  • Simple process with local materials
  • Selling near the plant keeps transport cost down

Drawbacks

  • Heavy product — transport is costly
  • Needs many moulds and a large yard
  • Raw material is most of the cost
  • Contractors pay late

Skills you need

  • Concrete mixing and curing
  • Handling moulds and pre-stressing wire
  • On-site installation
  • Local sales to builders and farmers

Why difficulty 2/5: A simple process; it needs space and local sales.

§3Market

Who buys

  • Farmers (field fencing)
  • Plot owners and builders
  • Factories, warehouses and institutions

How it sells

  • Direct sale with installation
  • Building-material dealers and contractors

Good to know

  • The report calls precast boundary walls fast to build, long-lasting and low-maintenance compared with brick walls.

§4Raw material & machinery

ItemQtyCost
Concrete mixer machine——
Shutter vibrators——
Moulds with PC-wire tensioning——
Chain pulley blocks on a gantry crane——
Water curing tanks——
Plant & machinery total—₹13.50 lakh

From: PMEGP sample project report — Cement Block (Cement Pole & Wall Compound) (prepared by Udyami/Samadhan)

  • Cement
  • Gravel (rodi) and sand (bajari)
  • PC wire and GI wire

From: PMEGP sample project report — Cement Block (Cement Pole & Wall Compound) (prepared by Udyami/Samadhan)

In our raw material database

TMT bars (reinforcement steel) →

§5Licences & registration

  1. Udyam
  2. GST
  3. Pollution Control Board NOC (the report lists it)
  4. Trade licence
  5. Trademark (optional)

We can do this registration for you

§6Schemes & subsidies

PMEGP fits the ₹23.98 L project; CGTMSE and Stand-Up India for bank credit.

§7Money

How the investment is worked out: Civil work (land & building) ₹2.70 L, plant & machinery ₹13.50 L, working capital ₹7.78 L = ₹23.98 L.

Working capital: Working capital ₹7.78 L; bank ₹7.00 L.

Year not printed on the report — check current machinery prices.

How to prepare a loan file

§8Export potential

Confirm the HS code in the DGFT ITC(HS) lookup before you export

6810Articles of cement, of concrete or of artificial stone
  • A heavy, low-value product — sold mostly near the plant.

§9Risks — where people fail

  • Cement and steel wire price rise
  • Breakage in handling
  • Slow construction season
  • Credit sales

§1030 / 60 / 90-day plan

A general plan that applies to any business. A plan for this business will be added after research.

  1. Days 1–30: Visit a working precast cement poles and boundary walls unit, ask 10 buyers about price and quantity, and get quotations from 3 suppliers.
  2. Days 31–60: Udyam and the licences you need (Udyam, GST), a project report (DPR), and the scheme or loan file.
  3. Days 61–90: Space and machines, trial production, and first deliveries to 10 customers.

§11Who to connect with

Not verified yet

Associations, clusters and training institutes — the directory is being built. Connect

§12Watch

There is no episode on this business yet. Shows are coming soon on the Podcast page.

Want to start Precast Cement Poles and Boundary Walls?

DPR, loan file or registration — ask us on WhatsApp.

Get a DPR / loan file made

Sources

  1. PMEGP sample project report — Cement Block (Cement Pole & Wall Compound) (prepared by Udyami/Samadhan)

Data review: 6 October 2026. Spotted a mistake? Report it. For information only — not legal or financial advice.