§1What this business is

Natural rubber is compounded with rosin, fillers (china clay, silica), titanium dioxide, zinc oxide, process oil and curing chemicals on a mixing mill, sheeted, cut and moulded under a steam-heated hydraulic press. The finished polishers wear out in use, so rice mills buy them again and again. The report plans 7,300 inches a day over two 7-hour shifts.

Capacity: 7,300 inches a day, 21,90,000 inches a year (2 shifts of 7 hours, 300 days); year 1 at 40%.

§2Is it right for you?

Who it is for

Someone in a rice-milling belt with rubber-moulding experience or a technical partner.

Who it is not for

Someone without access to rice mills as customers.

Advantages

  • Consumable part — rice mills reorder regularly
  • Clear buyer base in rice-growing districts
  • Good margin in the report (9–10%)
  • Same set-up can mould other rubber parts

Drawbacks

  • Heavy power load (50 HP)
  • Natural rubber price swings
  • Mills judge on wear life; poor batches lose customers
  • Boiler and press need trained operators

Skills you need

  • Rubber compounding
  • Moulding and curing
  • Wear testing
  • Selling to rice mills

Why difficulty 3/5: Rubber moulding skill and a 50 HP plant with a boiler.

§3Market

Who buys

  • Rice mills
  • Rice-mill machinery makers and spare-part dealers

How it sells

  • Direct visits to mills
  • Mill-store and spare-part dealers

Good to know

  • Year-1 raw material is ₹51.36 L against sales of ₹91.45 L.

§4Raw material & machinery

ItemQtyCost
Rubber mixing mill 14 × 36 inch with 40 HP motor1₹7.00 lakh
Hydraulic press1₹4.50 lakh
Non-IBR oil-fired baby boiler with pump, blower and chimney1₹3.50 lakh
Cutting machine1₹1.00 lakh
Dies and mouldslump sum₹2.50 lakh
Other equipment and hand toolslump sum₹50,000

From: PMEGP sample project report — Rubber Rice Polishers (Rice-Mill Rubber Parts) (prepared by Udyami/Samadhan)

  • Natural rubber84 tonnes a year at full capacity, ₹1,50,000 a tonne
  • China clay132 tonnes a year, ₹6,000 a tonne
  • Silica powder, process oil, titanium dioxide, zinc oxide, rosin18 t at ₹40,000; 12 t at ₹60,000; 3.6 t at ₹2,00,000; 3.6 t at ₹1,10,000; 2.4 t at ₹1,00,000 a tonne
  • Stearic acid, HBS, TMT and other curing chemicals₹20.00 lakh a year (lump sum)

From: PMEGP sample project report — Rubber Rice Polishers (Rice-Mill Rubber Parts) (prepared by Udyami/Samadhan)

§5Licences & registration

  1. GST
  2. Udyam registration (optional in the report)
  3. NOC from the State Pollution Control Board (listed in the report)
  4. Trademark for the brand if needed

We can do this registration for you

§6Schemes & subsidies

PMEGP fits a ₹27.22 L manufacturing unit; CGTMSE for a collateral-free loan; Stand-Up India for SC/ST or women founders.

§7Money

How the investment is worked out: Samadhan report ₹27.22 L = plant and machinery ₹19.00 L, furniture ₹1.00 L, working capital ₹7.22 L; land own or rented. Term loan ₹18.00 L.

Working capital: Working capital ₹7.22 L; bank demand ₹6.50 L. 10 days of raw material and 10 days of finished goods.

Year not printed on the report — check current machinery and raw-material prices.

How to prepare a loan file

§8Export potential

Rice-mill spares sell in rice-growing countries; confirm the HS code (rubber article or machine part) with a customs broker.

§9Risks — where people fail

  • Rubber price rise
  • Low wear life complaints
  • Rice-mill slowdown in a bad crop year
  • Boiler safety

§1030 / 60 / 90-day plan

A general plan that applies to any business. A plan for this business will be added after research.

  1. Days 1–30: Visit a working rubber rice polishers (rice-mill rubber parts) unit, ask 10 buyers about price and quantity, and get quotations from 3 suppliers.
  2. Days 31–60: Udyam and the licences you need (GST, Udyam registration (optional in the report)), a project report (DPR), and the scheme or loan file.
  3. Days 61–90: Space and machines, trial production, and first deliveries to 10 customers.

§11Who to connect with

Not verified yet

Associations, clusters and training institutes — the directory is being built. Connect

§12Watch

There is no episode on this business yet. Shows are coming soon on the Podcast page.

Want to start Rubber Rice Polishers (Rice-Mill Rubber Parts)?

DPR, loan file or registration — ask us on WhatsApp.

Get a DPR / loan file made

Sources

  1. PMEGP sample project report — Rubber Rice Polishers (Rice-Mill Rubber Parts) (prepared by Udyami/Samadhan)

Data review: 6 October 2026. Spotted a mistake? Report it. For information only — not legal or financial advice.