§1How big it is
Solar installed capacity 164.59 GW as on 31 Jul 2026; total non-fossil capacity 300.50 GW (over 54% of ~552 GW total)
PIB press release (MNRE): India Achieves Landmark 300 GW Non-Fossil Fuel capacity (9 Aug 2026), PRID 2296782Record 55.29 GW non-fossil capacity added in 2025-26, incl. 44.6 GW solar
PIB press release (MNRE): India Achieves Landmark 300 GW Non-Fossil Fuel capacity (9 Aug 2026), PRID 2296782
§2Ways to get started
- Rooftop solar EPC installer empanelled under PM Surya Ghar
- Solar pump installer under PM-KUSUM
- Module mounting structure fabrication
- O&M and panel cleaning service
- Solar product distribution (inverters, batteries)
§3Hubs and clusters
- Rajasthan and Gujarat - largest solar parks (well-known; state capacity table not checked in this pass)
§4Licences and registration
- Vendor empanelment with state DISCOM / national portal for PM Surya Ghar rooftop installation
- Module and cell makers: ALMM (Approved List of Models and Manufacturers) enlistment with MNRE; BIS registration
- Electrical contractor licence from state electrical inspectorate
- Net-metering / grid connectivity approval from DISCOM (per project)
- Udyam Registration (MSME) - free, online, PAN + Aadhaar based
- GST registration (mandatory above turnover threshold or for inter-state supply / e-commerce sale)
- Shops & Establishment registration or Factory Licence (Factories Act / state rules) depending on size and power use
- Consent to Establish and Consent to Operate from the State Pollution Control Board - category (Red/Orange/Green/White) as per CPCB 2025 harmonised list; White category is exempt from consent
- IEC (Importer Exporter Code) from DGFT if you import or export
§5Regulators
- MNRE (ALMM list for modules/cells, standards)
- BIS (CRS for solar modules, inverters)
- State DISCOMs and State Electricity Regulatory Commissions (net metering, connectivity)
- CEA (safety regulations)
§6Government help
- PM Surya Ghar: Muft Bijli Yojana (rooftop solar subsidy for homes)
- PM-KUSUM (solar pumps and farm solar plants)
- PLI for High Efficiency Solar PV Modules
- Solar Park scheme
- Green Energy Corridor
- National Green Hydrogen Mission
- IREDA loans
- Cross-sector schemes that also apply (detailed in the programmes file): Udyam benefits, PMEGP, PM Mudra Yojana, CGTMSE credit guarantee, Stand-Up India, MSE-CDP (cluster development), RAMP, MSME ZED and Lean certification, MSME Champions, TReDS, Startup India (SISFS seed fund, Fund of Funds, CGSS), RoDTEP, EPCG, Advance Authorisation, Districts as Export Hubs, ODOP (One District One Product)
§7For exports
- EEPC India (for equipment)
- SEPC/none specific - not confirmed
§8Pros and cons
Merits
- Very fast capacity growth - from 2.8 GW in 2014 to about 165 GW [PIB Aug 2026]
- Subsidy-backed household demand through PM Surya Ghar
Demerits
- Rooftop EPC payments depend on subsidy release and DISCOM inspection timelines
- Modules/cells historically import-dependent; ALMM rules change supplier options
- Intense price competition among installers