Detailed Project Report

Automobile Control Cables

—

Prepared on: 27 October 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹4.52 L
Term loan from bank
₹2.94 L
Promoter’s contribution
₹0.45 L
Subsidy
₹1.13 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.71 L
Average DSCR
-5.12
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Make brake, clutch and accelerator cables for scooters, motorcycles and auto-rickshaws for the spare-parts market.

Main product or serviceAutomobile Control Cables
Installed capacity per year (at 100%)10,000 units

04 Market

  • Mechanics and two-wheeler service stations
  • Owners of scooters, motorcycles, mopeds and auto-rickshaws
  • Auto-parts dealers and shops
  • Dozen packs in printed poly bags

05 Plant and machinery

ItemQty₹Total ₹
Wire twisting machine (19 bobbins, 1 HP motor) (× 4)11,60,0001,60,000
Pressure die-casting machine170,00070,000
Compressor (1 HP motor)120,00020,000
Size cutter12,0002,000
Flower (end-forming) machine (× 2)110,00010,000
Hand press13,0003,000
Reel winder14,0004,000
Grinder15,0005,000
Hand cutter (× 2)11,6001,600
Dies for die-casting (× 6)136,00036,000
Shearing machine15,0005,000
Small bobbins (× 100)12,5002,500
Big bobbins (× 20)13,0003,000
Poly bag sealing machine (× 2)12,0002,000
Jigs, fixtures and other tools (× lump sum)135,00035,000
Installation and taxes (20%) (× —)171,82071,820
Total4,30,920

Pre-filled from: PMEGP sample project report — Automobile Control Cables (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Stainless steel wire — 21,600 kg a year at full capacity, ₹200 per kg
  • Zinc alloy — 1,800 kg a year, ₹185 per kg (end dipping and stoppers)
  • Printed poly bags — printed outside to order (report's basis)

07 Cost of project

₹ in lakh
Plant and machinery4.31
Contingency0.22
Total fixed capital4.52
Working capital margin0.00
Total project cost4.52

08 Means of finance

₹ in lakh%
Promoter’s contribution0.4510.0
Subsidy1.1325.0
Term loan from bank2.9465.0
Total4.52100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.090.090.090.090.090.090.09
Insurance0.020.020.020.020.020.020.02
Total cost of operations2.992.992.992.992.992.992.99
Operating profit (EBITDA)-2.99-2.99-2.99-2.99-2.99-2.99-2.99
Depreciation0.680.580.490.420.350.300.26
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.320.280.230.180.130.080.03
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.99-3.85-3.71-3.59-3.47-3.37-3.28
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.99-3.85-3.71-3.59-3.47-3.37-3.28

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.99-3.85-3.71-3.59-3.47-3.37-3.28
Depreciation0.680.580.490.420.350.300.26
Cash accruals (PAT + depreciation)-3.31-3.27-3.22-3.17-3.12-3.07-3.02
Term loan repaid0.230.450.450.450.450.450.45
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.54-3.72-3.67-3.62-3.57-3.52-3.47
Cash and bank-3.54-7.26-10.93-14.55-18.12-21.65-25.12

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.581.581.581.581.581.581.58
Reserves and surplus-3.99-7.84-11.55-15.13-18.61-21.98-25.25
Term loan outstanding2.712.261.811.360.900.450.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities0.31-3.99-8.15-12.19-16.12-19.94-23.67
Net fixed assets3.853.272.782.362.011.711.45
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.54-7.26-10.93-14.55-18.12-21.65-25.12
Total assets0.31-3.99-8.15-12.19-16.12-19.94-23.67

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-5.50-4.11-4.41-4.76-5.17-5.66-6.24
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-5.12
Lowest DSCR-6.24
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.680.580.490.420.350.300.26

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
12.940.320.232.71
22.710.280.452.26
32.260.230.451.81
41.810.180.451.36
51.360.130.450.90
60.900.080.450.45
70.450.030.450.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • BIS standard for auto control cables (the report cites IS 1978 — confirm the current standard with BIS)
  • Trade licence from the local body
  • State pollution board consent (zinc melting and die-casting)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Automobile Control Cables (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Automobile_Control_Cables_%28_Samadhan_Projects_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.