Building BusinessServices

Section 24

Bell Metal Craft Unit (Temple Bells, Diyas and Wind Chimes)

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹9 lakh and ₹11 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Bell Metal Craft Unit (Temple Bells, Diyas and Wind Chimes)

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹0.79 L
Term loan from bank
₹0.51 L
Promoter’s contribution
₹0.08 L
Subsidy
₹0.20 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.02 L
Average DSCR
-28.50
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Melt copper and tin into bell metal, cast it in clay and wax moulds, and polish temple bells, puja ghantis and diyas for pilgrims and temples.

Main product or serviceBell Metal Craft Unit (Temple Bells, Diyas and Wind Chimes)
Installed capacity per year (at 100%)10,000 units

04 Market

  • Pilgrims and tourists
  • Temples, ashrams and dharamshalas
  • Puja stores and souvenir shops
  • Temple fairs, craft melas and rural haats
  • Wholesale to puja stores
  • Amazon Karigar, Flipkart Samarth and Etsy

05 Plant and machinery

ItemQty₹Total ₹
Electric melting furnace, 10–15 kg capacity145,00045,000
Brass and bell metal moulds (clay and wax composite)110,00010,000
Table-top polishing machine, 0.5 HP motor112,00012,000
Digital weighing scale12,0002,000
Packaging toolkit (label printer, sealer)16,0006,000
Total75,000

Pre-filled from: Uttarakhand DUY project profile — Local Bell Metal Craft Units in Uttarakhand. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Copper, tin and zinc rods — first batch of raw material ₹1,50,000 – ₹2,00,000
  • Wax and clay for moulds, charcoal — for casting
  • Polishing compounds and protective coatings — for finishing

07 Cost of project

₹ in lakh
Plant and machinery0.75
Contingency0.04
Total fixed capital0.79
Working capital margin0.00
Total project cost0.79

08 Means of finance

₹ in lakh%
Promoter’s contribution0.0810.0
Subsidy0.2025.0
Term loan from bank0.5165.0
Total0.79100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.020.020.020.020.020.020.02
Insurance0.000.000.000.000.000.000.00
Total cost of operations2.902.902.902.902.902.902.90
Operating profit (EBITDA)-2.90-2.90-2.90-2.90-2.90-2.90-2.90
Depreciation0.120.100.090.070.060.050.04
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.060.050.040.030.020.010.00
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.07-3.05-3.02-3.00-2.98-2.97-2.95
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.07-3.05-3.02-3.00-2.98-2.97-2.95

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.07-3.05-3.02-3.00-2.98-2.97-2.95
Depreciation0.120.100.090.070.060.050.04
Cash accruals (PAT + depreciation)-2.96-2.95-2.94-2.93-2.92-2.91-2.90
Term loan repaid0.040.080.080.080.080.080.08
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-2.99-3.03-3.02-3.01-3.00-2.99-2.98
Cash and bank-2.99-6.02-9.04-12.05-15.05-18.04-21.02

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.280.280.280.280.280.280.28
Reserves and surplus-3.07-6.12-9.15-12.15-15.13-18.10-21.05
Term loan outstanding0.470.390.320.240.160.080.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-2.33-5.45-8.56-11.64-14.70-17.74-20.77
Net fixed assets0.670.570.480.410.350.300.25
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-2.99-6.02-9.04-12.05-15.05-18.04-21.02
Total assets-2.33-5.45-8.56-11.64-14.70-17.74-20.77

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-30.59-22.88-24.55-26.50-28.78-31.48-34.75
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-28.50
Lowest DSCR-34.75
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.120.100.090.070.060.050.04

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
10.510.060.040.47
20.470.050.080.39
30.390.040.080.32
40.320.030.080.24
50.240.020.080.16
60.160.010.080.08
70.080.000.080.00

17 Licences and registrations

  • Udyam registration
  • Trade licence from the local body
  • GST registration once turnover crosses the limit
  • Pollution control consent for the furnace where the state board asks for it
  • Artisan (Pehchan) card from the handicrafts office for scheme benefits

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus

19 Sources

  1. Uttarakhand DUY project profile — Local Bell Metal Craft Units in Uttarakhand — https://duy-heduk.org/downloads/project-profiles/Local_Bell_Metal_Craft_Units_in_Uttarakhand.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.