Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹24.53 lakh and ₹24.53 lakh.

Legal form
Applicant category
Location

Detailed Project Report

BOPP Adhesive Tape

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹7.75 L
Term loan from bank
₹5.04 L
Promoter’s contribution
₹0.77 L
Subsidy
₹1.94 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-4.30 L
Average DSCR
-3.07
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Coat BOPP film with rubber-based adhesive, then slit and rewind it into packing tape rolls.

Main product or serviceBOPP Adhesive Tape
Installed capacity per year (at 100%)10,000 units

04 Market

  • Courier and e-commerce packers
  • Factories and pharmaceutical carton packers
  • Shops and commercial offices
  • Packaging-material wholesalers
  • Stationery and hardware shops
  • Direct supply to factories

05 Plant and machinery

ItemQty₹Total ₹
SS tank with stirrer (½ HP) for adhesive, 300 litres175,00075,000
Coating, cooling and rewinding machine with rollers and 50-litre SS tank11,80,0001,80,000
Double-walled drying chamber with conveyor and thermostat (2 KW)160,00060,000
Slitting, printing and rewinding unit with circular knives (1 HP)11,20,0001,20,000
Other equipment: weighing balance, containers, electrical accessories11,80,0001,80,000
Taxes, freight etc. (20%)11,23,0001,23,000
Total7,38,000

Pre-filled from: PMEGP sample project report — Adhesive BOPP Tapes Manufacturing Unit (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • BOPP (polypropylene) film rolls — main raw material; all raw material costed at ₹56 per kg of tape
  • Natural rubber, zinc oxide, magnesium oxide, phenolic resin — adhesive ingredients
  • Solvent (CSNL and linseed oil) — for the adhesive
  • Paper cores and kraft paper or packing — for winding and packing

07 Cost of project

₹ in lakh
Plant and machinery7.38
Contingency0.37
Total fixed capital7.75
Working capital margin0.00
Total project cost7.75

08 Means of finance

₹ in lakh%
Promoter’s contribution0.7710.0
Subsidy1.9425.0
Term loan from bank5.0465.0
Total7.75100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.150.150.150.150.150.150.15
Insurance0.040.040.040.040.040.040.04
Total cost of operations3.073.073.073.073.073.073.07
Operating profit (EBITDA)-3.07-3.07-3.07-3.07-3.07-3.07-3.07
Depreciation1.160.990.840.710.610.520.44
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.550.470.390.300.220.130.05
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-4.78-4.53-4.30-4.09-3.90-3.72-3.56
Income tax0.000.000.000.000.000.000.00
Profit after tax-4.78-4.53-4.30-4.09-3.90-3.72-3.56

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-4.78-4.53-4.30-4.09-3.90-3.72-3.56
Depreciation1.160.990.840.710.610.520.44
Cash accruals (PAT + depreciation)-3.62-3.55-3.46-3.38-3.29-3.21-3.12
Term loan repaid0.390.770.770.770.770.770.77
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-4.01-4.32-4.24-4.15-4.07-3.98-3.89
Cash and bank-4.01-8.33-12.56-16.71-20.78-24.76-28.65

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)2.712.712.712.712.712.712.71
Reserves and surplus-4.78-9.32-13.62-17.71-21.60-25.32-28.88
Term loan outstanding4.653.873.102.321.550.770.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities2.58-2.73-7.80-12.67-17.34-21.84-26.17
Net fixed assets6.595.604.764.053.442.922.48
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-4.01-8.33-12.56-16.71-20.78-24.76-28.65
Total assets2.58-2.73-7.80-12.67-17.34-21.84-26.17

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-3.30-2.46-2.65-2.85-3.10-3.39-3.74
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-3.07
Lowest DSCR-3.74
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation1.160.990.840.710.610.520.44

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
15.040.550.394.65
24.650.470.773.87
33.870.390.773.10
43.100.300.772.32
52.320.220.771.55
61.550.130.770.77
70.770.050.770.00

17 Licences and registrations

  • Udyam
  • GST
  • Pollution Control Board consent
  • Fire NOC (solvents stored)
  • Trade licence

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Adhesive BOPP Tapes Manufacturing Unit (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Adhesive_Tapes_%28_Samadhan_Projects_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.