Detailed Project Report
Broiler Poultry Farm
—
Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)
01 Project at a glance
- Total project cost
- ₹0.00 L
- Term loan from bank
- ₹0.00 L
- Promoter’s contribution
- ₹0.00 L
- Sales · Year 3
- ₹0.00 L
- Profit after tax · Year 3
- ₹-2.88 L
- Average DSCR
- -3348.44
- Break-even (% of capacity used)
- —
02 Promoter and unit
| Promoter name | — |
|---|---|
| Business / firm name | — |
| Legal form | Proprietorship |
| Address of the unit | — |
| Applicant category | General · Rural |
03 The project
Birds ready in 35–40 days — 6–7 batches a year.
| Main product or service | Broiler Poultry Farm |
|---|---|
| Installed capacity per year (at 100%) | 10,000 units |
04 Market
- Integrator companies that run contract farming
- Live-bird traders and meat shops
- Hotels and caterers
- Contract farming: the integrator supplies chicks and feed and takes back the grown birds
- Independent sale of live birds to traders
05 Plant and machinery
| Item | Qty | ₹ | Total ₹ |
|---|---|---|---|
| Broiler shed with asbestos roof (× as per flock size) | 1 | 190 | 190 |
| Thatch-roof shed (contract farming) (× as per flock size) | 1 | 250 | 250 |
| Poultry equipment (× per bird) | 1 | 18 | 18 |
| Total | 458 |
Pre-filled from: NABARD Bihar RO – Unit Cost for Investment Activities in Agriculture & Allied Sectors 2025-26; UP MSME 1-Connect (Govt of UP, RAMP) – Project Report: Broiler Farming. Prices in older reports will have gone up — enter today’s quotations.
06 Raw materials
- Day-old chicks (DOC) — ₹35–47 each
- Broiler feed — ₹40–50 per kg
- Medicines, vaccines and other expenses — ₹20 per bird
- Total running cost — ₹400–450 per bird
07 Cost of project
| ₹ in lakh | |
|---|---|
| Plant and machinery | 0.00 |
| Contingency | 0.00 |
| Total fixed capital | 0.00 |
| Working capital margin | 0.00 |
| Total project cost | 0.00 |
08 Means of finance
| ₹ in lakh | % | |
|---|---|---|
| Promoter’s contribution | 0.00 | 10.0 |
| Term loan from bank | 0.00 | 90.0 |
| Total | 0.00 | 100.0 |
| Working capital loan (outside project cost) | 0.00 |
09 Key assumptions
| Selling price | ₹0 per units |
|---|---|
| Raw material & packing cost | ₹0 per units |
| Capacity used each year | 60% · 70% · 80% · 80% · 80% · 80% · 80% |
| Term loan interest rate (% a year) | 11% · 84 months (Moratorium 6) |
| Working capital method | Turnover method (RBI) · Working capital interest (% a year) 11% |
| Income tax rate | 25% |
| Yearly price and cost rise | 0% |
10 Production and sales
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Capacity used | 60% | 70% | 80% | 80% | 80% | 80% | 80% |
| Production (units) | 6,000 | 7,000 | 8,000 | 8,000 | 8,000 | 8,000 | 8,000 |
| Sales | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
11 Projected profitability
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Sales | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Raw material and packing | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Power and fuel | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Salaries and wages | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 |
| Rent | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Administration | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Selling and distribution | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Repairs and maintenance | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Insurance | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Total cost of operations | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 |
| Operating profit (EBITDA) | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Depreciation | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Preliminary expenses written off | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest on term loan | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest on working capital | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Profit before tax | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Income tax | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Profit after tax | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
12 Cash flow
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Profit after tax | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Depreciation | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Cash accruals (PAT + depreciation) | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Term loan repaid | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Owner’s drawings | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Surplus after repayment | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Cash and bank | -2.88 | -5.76 | -8.64 | -11.52 | -14.41 | -17.29 | -20.17 |
13 Projected balance sheet
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Capital (own + subsidy) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Reserves and surplus | -2.88 | -5.76 | -8.64 | -11.52 | -14.40 | -17.29 | -20.17 |
| Term loan outstanding | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Working capital loan | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Total liabilities | -2.88 | -5.76 | -8.64 | -11.52 | -14.40 | -17.28 | -20.17 |
| Net fixed assets | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Preliminary expenses not written off | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Current assets (stock and debtors) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Cash and bank | -2.88 | -5.76 | -8.64 | -11.52 | -14.41 | -17.29 | -20.17 |
| Total assets | -2.88 | -5.76 | -8.64 | -11.52 | -14.40 | -17.28 | -20.17 |
14 Ratios and break-even
| Year | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Debt service coverage ratio (DSCR) | -3593.90 | -2687.28 | -2884.40 | -3112.73 | -3380.32 | -3698.24 | -4082.17 |
| Break-even (% of capacity used) | — | — | — | — | — | — | — |
| Cash break-even | — | — | — | — | — | — | — |
| Average DSCR | -3348.44 |
|---|---|
| Lowest DSCR | -4082.17 |
| Payback period | — |
15 Depreciation
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Depreciation | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.
16 Term loan repayment
| Year | Opening | Interest | Term loan repaid | Closing |
|---|---|---|---|---|
| 1 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2 | 0.00 | 0.00 | 0.00 | 0.00 |
| 3 | 0.00 | 0.00 | 0.00 | 0.00 |
| 4 | 0.00 | 0.00 | 0.00 | 0.00 |
| 5 | 0.00 | 0.00 | 0.00 | 0.00 |
| 6 | 0.00 | 0.00 | 0.00 | 0.00 |
| 7 | 0.00 | 0.00 | 0.00 | 0.00 |
17 Licences and registrations
- Gram panchayat NOC
- UPPCB consent (for 5,000+ birds, as per CPCB guidelines)
- Udyam
- Animal Husbandry Department registration (for schemes)
18 Government schemes that may apply
- Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
- Stand-Up India
- Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
19 Sources
- NABARD Bihar RO – Unit Cost for Investment Activities in Agriculture & Allied Sectors 2025-26 — https://www.nabard.org/auth/writereaddata/tender/pub_0810250453461849.pdf
- UP MSME 1-Connect (Govt of UP, RAMP) – Project Report: Broiler Farming — https://msme1connect.up.gov.in/Projectreport/Project%20Report638652864569023360.pdf
- NABARD Andhra Pradesh RO – Comprehensive Guide of Unit Costs 2025-26 — https://www.nabard.org/auth/writereaddata/tender/pub_2409250327511846.pdf
- FSSAI – Public Notice: List of mapped ITC HS codes with FSS Regulations — https://fssai.gov.in/upload/advisories/2020/03/5e6b37c994302Public_Notice_HS_Code_13_02_2020.pdf
- APEDA – Product groups (Cereals, Processed Foods, Animal Products, Fruits & Vegetables, Floriculture) — https://apeda.gov.in/
This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.
