Building BusinessServices

Section 24

Canvas Shoes

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹21.58 lakh and ₹21.58 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Canvas Shoes

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹14.25 L
Term loan from bank
₹9.26 L
Promoter’s contribution
₹1.43 L
Subsidy
₹3.56 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.49 L
Average DSCR
-1.76
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Make rubber-soled canvas shoes for schools, sports and uniformed services by calendering rubber and vulcanising the shoe.

Main product or serviceCanvas Shoes
Installed capacity per year (at 100%)10,000 units

04 Market

  • Schools, students and children
  • Players and sports users
  • Army, Navy, Air Force, police, Home Guards and NCC
  • Everyday casual wearers
  • Institutional and government tenders
  • Footwear wholesalers and retailers

05 Plant and machinery

ItemQty₹Total ₹
Mixing mill 4 × 36 in with chilled cast rolls, reduction gear and 50 HP motor100
Cloth calendering machine 8 × 24 in with 25 HP motor100
Rubber spreading machine 12 × 30 in with 25 HP motor100
Vulcaniser 9 × 5 ft100
Boiler100
Embossing machine100
Churner with 1 HP motor100
Eyeleting machine (hand operated)100
Clicking press, 5 tonnes, power operated, 5 HP100
Industrial sewing machine, ½ HP100
Aluminium and iron shoe lasts, moulds, clicking dies, trolleys, office equipment100
Equipment total113,57,50013,57,500
Total13,57,500

Pre-filled from: KVIC Project Profile — Canvas Shoes (PMEGP). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Canvas cloth and rubber (for uppers and soles) — raw material ₹16.08 lakh a year at full capacity
  • Labels and packing material — ₹1.00 lakh a year

07 Cost of project

₹ in lakh
Plant and machinery13.58
Contingency0.68
Total fixed capital14.25
Working capital margin0.00
Total project cost14.25

08 Means of finance

₹ in lakh%
Promoter’s contribution1.4310.0
Subsidy3.5625.0
Term loan from bank9.2665.0
Total14.25100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.290.290.290.290.290.290.29
Insurance0.070.070.070.070.070.070.07
Total cost of operations3.243.243.243.243.243.243.24
Operating profit (EBITDA)-3.24-3.24-3.24-3.24-3.24-3.24-3.24
Depreciation2.141.821.541.311.120.950.81
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.000.870.710.560.400.240.08
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-6.38-5.92-5.49-5.10-4.75-4.43-4.13
Income tax0.000.000.000.000.000.000.00
Profit after tax-6.38-5.92-5.49-5.10-4.75-4.43-4.13

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-6.38-5.92-5.49-5.10-4.75-4.43-4.13
Depreciation2.141.821.541.311.120.950.81
Cash accruals (PAT + depreciation)-4.24-4.11-3.95-3.79-3.63-3.48-3.32
Term loan repaid0.711.431.431.431.431.431.43
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-4.95-5.53-5.37-5.22-5.06-4.90-4.75
Cash and bank-4.95-10.48-15.86-21.07-26.13-31.04-35.78

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)4.994.994.994.994.994.994.99
Reserves and surplus-6.38-12.30-17.79-22.90-27.65-32.08-36.20
Term loan outstanding8.557.135.704.282.851.430.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities7.16-0.18-7.10-13.63-19.81-25.66-31.21
Net fixed assets12.1210.308.757.446.325.384.57
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-4.95-10.48-15.86-21.07-26.13-31.04-35.78
Total assets7.16-0.18-7.10-13.63-19.81-25.66-31.21

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.89-1.41-1.51-1.63-1.77-1.94-2.14
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.76
Lowest DSCR-2.14
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.141.821.541.311.120.950.81

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
19.261.000.718.55
28.550.871.437.13
37.130.711.435.70
45.700.561.434.28
54.280.401.432.85
62.850.241.431.43
71.430.081.430.00

17 Licences and registrations

  • Udyam
  • GST
  • Pollution Control Board consent (rubber processing and boiler)
  • Boiler registration with the state boiler inspectorate
  • BIS certification if a footwear Quality Control Order covers your product — check first
  • Factory licence once the worker count crosses the limit

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. KVIC Project Profile — Canvas Shoes (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/CANVAS_SHOES_%28_POLYMER_AND_CHEMICAL_BASED_INDUSTRY_%29.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.