01 Project at a glance

Total project cost
₹10.87 L
Term loan from bank
₹7.06 L
Promoter’s contribution
₹1.09 L
Subsidy
₹2.72 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-4.87 L
Average DSCR
-2.25
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Stamp brass contacts, crimp them onto wires and fit them into moulded housings to make connectors for electronic equipment.

Main product or serviceCrimped Wire Connectors
Installed capacity per year (at 100%)10,000 units

04 Market

  • Makers of computers, telecom and other electronic equipment
  • Wiring-harness and PCB assembly units
  • Direct supply against buyer specifications
  • Electronic component distributors

05 Plant and machinery

ItemQty₹Total ₹
Vertical injection moulding machine (imported)15,00,0005,00,000
Air wire stripper (imported)190,00090,000
Wire twisting machine (imported)120,00020,000
Wire stripping machine (imported)125,00025,000
Semi-automatic soldering machine125,00025,000
Applicator (imported)125,00025,000
Air press (imported)155,00055,000
Terminating machine (imported)180,00080,000
Precision punch (imported) (× 1 set)160,00060,000
Milli-ohm meter (× 4)150,00050,000
Insulation tester (megger)15,0005,000
High-voltage breakdown tester120,00020,000
Insertion and withdrawal force tester (× 4)148,00048,000
Testing gauge for crimp system (× 4)132,00032,000
Total10,35,000

Pre-filled from: DC-MSME project profile — Crimped Wire Connectors; World Customs Organization – HS Nomenclature 2022, Chapter 85. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Plastic parts (imported) — ₹2,80,000 a month in the report
  • Brass / phosphor-bronze strips (imported) — ₹46,000 a month
  • Plastic moulding powder — ₹36,000 a month, Indian
  • PVC wires — ₹34,000 a month
  • Consumables and packing — ₹25,000 a month

07 Cost of project

₹ in lakh
Plant and machinery10.35
Contingency0.52
Total fixed capital10.87
Working capital margin0.00
Total project cost10.87

08 Means of finance

₹ in lakh%
Promoter’s contribution1.0910.0
Subsidy2.7225.0
Term loan from bank7.0665.0
Total10.87100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.220.220.220.220.220.220.22
Insurance0.050.050.050.050.050.050.05
Total cost of operations3.153.153.153.153.153.153.15
Operating profit (EBITDA)-3.15-3.15-3.15-3.15-3.15-3.15-3.15
Depreciation1.631.391.181.000.850.720.61
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.760.660.540.420.300.180.06
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-5.55-5.20-4.87-4.58-4.31-4.06-3.83
Income tax0.000.000.000.000.000.000.00
Profit after tax-5.55-5.20-4.87-4.58-4.31-4.06-3.83

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-5.55-5.20-4.87-4.58-4.31-4.06-3.83
Depreciation1.631.391.181.000.850.720.61
Cash accruals (PAT + depreciation)-3.92-3.81-3.69-3.58-3.46-3.34-3.22
Term loan repaid0.541.091.091.091.091.091.09
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-4.46-4.90-4.78-4.66-4.54-4.42-4.30
Cash and bank-4.46-9.36-14.14-18.80-23.35-27.77-32.07

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)3.803.803.803.803.803.803.80
Reserves and surplus-5.55-10.75-15.62-20.19-24.50-28.56-32.39
Term loan outstanding6.525.434.353.262.171.090.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities4.78-1.51-7.47-13.13-18.52-23.67-28.59
Net fixed assets9.247.856.675.674.824.103.48
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-4.46-9.36-14.14-18.80-23.35-27.77-32.07
Total assets4.78-1.51-7.47-13.13-18.52-23.67-28.59

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-2.41-1.80-1.93-2.09-2.27-2.48-2.74
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-2.25
Lowest DSCR-2.74
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation1.631.391.181.000.850.720.61

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
17.060.760.546.52
26.520.661.095.43
35.430.541.094.35
44.350.421.093.26
53.260.301.092.17
62.170.181.091.09
71.090.061.090.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • State Pollution Control Board consent where the state requires it (soldering fumes, cleaning solvents)
  • Import Export Code (IEC) for importing machines and material
  • BIS certification only if a Quality Control Order covers your connector type — check with BIS

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. DC-MSME project profile — Crimped Wire Connectors — https://www.dcmsme.gov.in/publications/pmryprof/it/ch21.pdf
  2. World Customs Organization – HS Nomenclature 2022, Chapter 85 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/1685_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.