Building BusinessServices

Section 24

Dholak Making

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹5.89 lakh and ₹5.89 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Dholak Making

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹3.94 L
Term loan from bank
₹2.56 L
Promoter’s contribution
₹0.39 L
Subsidy
₹0.98 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.60 L
Average DSCR
-5.86
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Turn seasoned mango or sheesham wood into barrel-shaped dholaks, fit leather or plastic heads, rope and rings, and tune them.

Main product or serviceDholak Making
Installed capacity per year (at 100%)10,000 units

04 Market

  • Musicians, bhajan and kirtan groups
  • Families for weddings, sangeet and festivals
  • Folk-dance troupes (bhangra, lavani)
  • Musical-instrument shops and wholesalers
  • Direct orders from groups and events

05 Plant and machinery

ItemQty₹Total ₹
Wooden lathe100
Drill machine100
Scissors (for cutting leather) (× 1 lot)100
Pointed chisel (× 1 lot)100
Hand hacksaw (× 1 lot)100
Hand files (× 1 lot)100
All plant and machinery (report total) (× 1 set)13,75,0003,75,000
Total3,75,000

Pre-filled from: PMEGP sample project report — Dholak Manufacturing Unit (prepared by Udyami/Samadhan); World Customs Organization – HS Nomenclature 2022 edition. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Barrel-shaped wood — sheesham, mango or jackfruit — bought from local markets; seasoned before use
  • Leather or plastic sheets — for the heads and membrane
  • Metal rings, keys, sockets and hooks — for tightening and tuning
  • Cotton rope (5–6 m per dholak) and bamboo strips — rope laces the heads; bamboo makes the rings
  • Harika stone powder, maida starch and engine oil — mixture applied to the head for tone

07 Cost of project

₹ in lakh
Plant and machinery3.75
Contingency0.19
Total fixed capital3.94
Working capital margin0.00
Total project cost3.94

08 Means of finance

₹ in lakh%
Promoter’s contribution0.3910.0
Subsidy0.9825.0
Term loan from bank2.5665.0
Total3.94100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.080.080.080.080.080.080.08
Insurance0.020.020.020.020.020.020.02
Total cost of operations2.982.982.982.982.982.982.98
Operating profit (EBITDA)-2.98-2.98-2.98-2.98-2.98-2.98-2.98
Depreciation0.590.500.430.360.310.260.22
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.280.240.200.150.110.070.02
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.85-3.72-3.60-3.49-3.40-3.31-3.22
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.85-3.72-3.60-3.49-3.40-3.31-3.22

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.85-3.72-3.60-3.49-3.40-3.31-3.22
Depreciation0.590.500.430.360.310.260.22
Cash accruals (PAT + depreciation)-3.26-3.22-3.18-3.13-3.09-3.05-3.00
Term loan repaid0.200.390.390.390.390.390.39
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.45-3.61-3.57-3.53-3.48-3.44-3.40
Cash and bank-3.45-7.06-10.63-14.16-17.64-21.08-24.48

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.381.381.381.381.381.381.38
Reserves and surplus-3.85-7.57-11.17-14.66-18.06-21.37-24.59
Term loan outstanding2.361.971.581.180.790.390.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-0.11-4.22-8.22-12.10-15.89-19.60-23.21
Net fixed assets3.352.842.422.061.751.491.26
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.45-7.06-10.63-14.16-17.64-21.08-24.48
Total assets-0.11-4.22-8.22-12.10-15.89-19.60-23.21

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-6.29-4.70-5.04-5.44-5.91-6.47-7.14
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-5.86
Lowest DSCR-7.14
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.590.500.430.360.310.260.22

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
12.560.280.202.36
22.360.240.391.97
31.970.200.391.58
41.580.150.391.18
51.180.110.390.79
60.790.070.390.39
70.390.020.390.00

17 Licences and registrations

  • Udyam
  • GST
  • Trade licence

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Mukhyamantri Yuva Udyami Vikas Abhiyan (CM-YUVA)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Dholak Manufacturing Unit (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Dholak_Manufacturing_Unit_Final_%28_Samadhan_Projects_%29.pdf
  2. World Customs Organization – HS Nomenclature 2022 edition — https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition/hs-nomenclature-2022-edition.aspx

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.