Detailed Project Report

Diesel Engine Cylinder Block Machining

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹3.59 L
Term loan from bank
₹2.33 L
Promoter’s contribution
₹0.36 L
Subsidy
₹0.90 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.54 L
Average DSCR
-6.40
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Buy grey cast iron cylinder block castings and machine, drill and tap them for diesel engine makers and the spares market.

Main product or serviceDiesel Engine Cylinder Block Machining
Installed capacity per year (at 100%)10,000 units

04 Market

  • Diesel engine manufacturers (original equipment)
  • Engine spare parts dealers
  • Engine repair and reconditioning workshops
  • Ancillary supply against an engine maker's drawing and schedule
  • Sale through spare parts wholesalers

05 Plant and machinery

ItemQty₹Total ₹
Medium duty lathe, 1,000 mm between centres, 230 mm centre height, 2 HP (× 3)11,80,0001,80,000
Medium duty lathe, 6 ft bed, 2 HP180,00080,000
Pillar drilling machine, 25 mm capacity, 2 HP116,00016,000
Automatic tapping machine, 2 HP125,00025,000
Double-ended grinder, 250 mm wheel, 2 HP16,0006,000
Testing and measuring equipment115,00015,000
Other tools and fixtures120,00020,000
Total3,42,000

Pre-filled from: DC-MSME project profile — Diesel Engine Cylinder Block. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Grey cast iron Grade 20 cylinder block castings — 17 tonnes a month at ₹42,000 a tonne = ₹7,14,000; bought from foundries

07 Cost of project

₹ in lakh
Plant and machinery3.42
Contingency0.17
Total fixed capital3.59
Working capital margin0.00
Total project cost3.59

08 Means of finance

₹ in lakh%
Promoter’s contribution0.3610.0
Subsidy0.9025.0
Term loan from bank2.3365.0
Total3.59100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.070.070.070.070.070.070.07
Insurance0.020.020.020.020.020.020.02
Total cost of operations2.972.972.972.972.972.972.97
Operating profit (EBITDA)-2.97-2.97-2.97-2.97-2.97-2.97-2.97
Depreciation0.540.460.390.330.280.240.20
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.250.220.180.140.100.060.02
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.76-3.65-3.54-3.44-3.35-3.27-3.19
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.76-3.65-3.54-3.44-3.35-3.27-3.19

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.76-3.65-3.54-3.44-3.35-3.27-3.19
Depreciation0.540.460.390.330.280.240.20
Cash accruals (PAT + depreciation)-3.22-3.19-3.15-3.11-3.07-3.03-2.99
Term loan repaid0.180.360.360.360.360.360.36
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.40-3.55-3.51-3.47-3.43-3.39-3.35
Cash and bank-3.40-6.95-10.46-13.93-17.36-20.75-24.10

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.261.261.261.261.261.261.26
Reserves and surplus-3.76-7.41-10.95-14.39-17.74-21.01-24.20
Term loan outstanding2.151.801.441.080.720.360.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-0.35-4.36-8.25-12.05-15.76-19.39-22.94
Net fixed assets3.052.592.211.871.591.351.15
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.40-6.95-10.46-13.93-17.36-20.75-24.10
Total assets-0.35-4.36-8.25-12.05-15.76-19.39-22.94

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-6.87-5.14-5.51-5.95-6.46-7.07-7.81
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-6.40
Lowest DSCR-7.81
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.540.460.390.330.280.240.20

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
12.330.250.182.15
22.150.220.361.80
31.800.180.361.44
41.440.140.361.08
51.080.100.360.72
60.720.060.360.36
70.360.020.360.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence where the worker and power limits apply
  • Trade licence from the local body

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Diesel Engine Cylinder Block — https://www.dcmsme.gov.in/old/reports/METProducts/DieselEngineCylinderBlock.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.