Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹168.3 lakh and ₹168.3 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Distribution Transformer Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹8.08 L
Term loan from bank
₹7.27 L
Promoter’s contribution
₹0.81 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-4.52 L
Average DSCR
-2.13
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Build 11 kV/433 V oil-filled distribution transformers (25–250 kVA) for power distribution.

Main product or serviceDistribution Transformer Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • State electricity boards and power distribution companies
  • Rural electrification projects
  • Industries and builders
  • Utility tenders after vendor approval
  • Electrical contractors

05 Plant and machinery

ItemQty₹Total ₹
Guillotine shear machine131,80031,800
Sheet bending press, 150 tonne182,50082,500
HT automatic coil winding machine (× 5)11,50,0001,50,000
LT coil winding machine, heavy (× 3)11,00,0001,00,000
Electric baking oven, up to 105 °C150,00050,000
Vacuum impregnation plant163,00063,000
Oil filtering equipment, 250 GPH138,00038,000
HV testing transformer with panel, 66 kV/230 V, 10 kVA181,00081,000
Double-frequency generator170,00070,000
Variable transformer, 30 A, 3-phase156,00056,000
Geared lathe, 6 ft147,00047,000
Total7,69,300

Pre-filled from: DC-MSME project profile — Distribution Transformers (Branch MSME-DI Dhanbad); World Customs Organization – HS Nomenclature 2022, Chapter 85. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • CRGO laminations (transformer grade) — 15 tonnes a month at ₹1,00,000 a tonne
  • Super-enamelled DPC winding wire — 3 tonnes a month at ₹4,75,000 a tonne
  • DPC aluminium strip — 2 tonnes a month at ₹1,65,000 a tonne
  • Transformer oil — 15,500 litres a month at ₹35 a litre
  • MS sheet, channels, flats and angles — for tanks and frames
  • HV/LV bushings, radiators, insulating paper and press board — bushings 100 sets a month at ₹800 a set; radiators ₹1,00,000 a month

07 Cost of project

₹ in lakh
Plant and machinery7.69
Contingency0.38
Total fixed capital8.08
Working capital margin0.00
Total project cost8.08

08 Means of finance

₹ in lakh%
Promoter’s contribution0.8110.0
Term loan from bank7.2790.0
Total8.08100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.160.160.160.160.160.160.16
Insurance0.040.040.040.040.040.040.04
Total cost of operations3.083.083.083.083.083.083.08
Operating profit (EBITDA)-3.08-3.08-3.08-3.08-3.08-3.08-3.08
Depreciation1.211.030.880.740.630.540.46
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.790.680.560.440.310.190.07
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-5.08-4.79-4.52-4.26-4.03-3.81-3.61
Income tax0.000.000.000.000.000.000.00
Profit after tax-5.08-4.79-4.52-4.26-4.03-3.81-3.61

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-5.08-4.79-4.52-4.26-4.03-3.81-3.61
Depreciation1.211.030.880.740.630.540.46
Cash accruals (PAT + depreciation)-3.87-3.76-3.64-3.52-3.39-3.27-3.15
Term loan repaid0.561.121.121.121.121.121.12
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-4.43-4.88-4.76-4.64-4.51-4.39-4.27
Cash and bank-4.43-9.31-14.07-18.71-23.22-27.61-31.88

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.810.810.810.810.810.810.81
Reserves and surplus-5.08-9.87-14.39-18.65-22.68-26.49-30.09
Term loan outstanding6.715.594.473.362.241.120.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities2.44-3.47-9.11-14.49-19.63-24.56-29.29
Net fixed assets6.875.844.964.223.583.052.59
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-4.43-9.31-14.07-18.71-23.22-27.61-31.88
Total assets2.44-3.47-9.11-14.49-19.63-24.56-29.29

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-2.29-1.71-1.84-1.98-2.15-2.36-2.60
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-2.13
Lowest DSCR-2.60
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation1.211.030.880.740.630.540.46

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
17.270.790.566.71
26.710.681.125.59
35.590.561.124.47
44.470.441.123.36
53.360.311.122.24
62.240.191.121.12
71.120.071.120.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • BIS certification if a Quality Control Order covers your transformer rating — check with BIS
  • BEE star label for distribution transformers where it applies
  • Vendor registration and type-test approval with each power utility
  • State Pollution Control Board consent and factory licence

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Distribution Transformers (Branch MSME-DI Dhanbad) — https://dcmsme.gov.in/ELECTRICAL%20PRODUCTS/DISTRIBUTION%20TRANSFORMERS.pdf
  2. World Customs Organization – HS Nomenclature 2022, Chapter 85 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/1685_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.