DPC (Double Paper Covered) Transformer Winding Wire

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹195.39 lakh and ₹195.39 lakh.

Legal form
Applicant category
Location

Detailed Project Report

DPC (Double Paper Covered) Transformer Winding Wire

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹14.57 L
Term loan from bank
₹13.12 L
Promoter’s contribution
₹1.46 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.83 L
Average DSCR
-1.24
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Draw copper and aluminium rod into wire and wrap it in insulating paper for transformer windings.

Main product or serviceDPC (Double Paper Covered) Transformer Winding Wire
Installed capacity per year (at 100%)10,000 units

04 Market

  • Power and distribution transformer makers
  • Transformer repair shops
  • Electricity boards' repair workshops
  • Direct supply on order
  • Tenders

05 Plant and machinery

ItemQty₹Total ₹
Wire drawing machine, 3 dies, with spooling (× 1 set)13,60,0003,60,000
DPC wire covering machine, 4 line (× 4)12,08,0002,08,000
Paper slitting machine, 30" (4–20 mm)11,20,0001,20,000
Medium wire drawing machine (11–16 SWG, 6 dies) (× 1 set)11,10,0001,10,000
Fine wire drawing machine (16–22 SWG, 5 dies) (× 1 set)175,00075,000
Strip flattening machine and strip covering machine (× 1 each)11,25,0001,25,000
Paper roll slitting machine 42", vacuum annealing, 2 t weighbridge (× 1 each)11,15,0001,15,000
Tensile testing machine11,60,0001,60,000
Kelvin bridge, wrapping tester, AVO meter and multimeter, misc. (× 1 lot)11,15,0001,15,000
Total13,88,000

Pre-filled from: DC-MSME project profile — DPC Wire; DGFT — ITC(HS) classification of export and import items. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Copper wire rod — 22.5 t a month at ₹1,35,000/t = ₹30.38 L
  • Aluminium rod, EC grade — 22.5 t a month at ₹95,000/t = ₹21.38 L
  • Kraft / insulating paper — 5 t a month at ₹95,000/t = ₹4.75 L
  • Stores and spares — ₹20,000 a month

07 Cost of project

₹ in lakh
Plant and machinery13.88
Contingency0.69
Total fixed capital14.57
Working capital margin0.00
Total project cost14.57

08 Means of finance

₹ in lakh%
Promoter’s contribution1.4610.0
Term loan from bank13.1290.0
Total14.57100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.290.290.290.290.290.290.29
Insurance0.070.070.070.070.070.070.07
Total cost of operations3.243.243.243.243.243.243.24
Operating profit (EBITDA)-3.24-3.24-3.24-3.24-3.24-3.24-3.24
Depreciation2.191.861.581.341.140.970.82
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.421.231.010.790.560.340.12
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-6.85-6.33-5.83-5.37-4.95-4.56-4.19
Income tax0.000.000.000.000.000.000.00
Profit after tax-6.85-6.33-5.83-5.37-4.95-4.56-4.19

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-6.85-6.33-5.83-5.37-4.95-4.56-4.19
Depreciation2.191.861.581.341.140.970.82
Cash accruals (PAT + depreciation)-4.66-4.47-4.25-4.03-3.81-3.59-3.36
Term loan repaid1.012.022.022.022.022.022.02
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.67-6.49-6.27-6.05-5.83-5.60-5.38
Cash and bank-5.67-12.17-18.44-24.48-30.31-35.92-41.30

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.461.461.461.461.461.461.46
Reserves and surplus-6.85-13.18-19.01-24.39-29.34-33.89-38.08
Term loan outstanding12.1110.098.076.054.042.020.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities6.71-1.64-9.49-16.88-23.84-30.42-36.63
Net fixed assets12.3910.538.957.616.475.504.67
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.67-12.17-18.44-24.48-30.31-35.92-41.30
Total assets6.71-1.64-9.49-16.88-23.84-30.42-36.63

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.34-1.00-1.07-1.16-1.26-1.37-1.52
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.24
Lowest DSCR-1.52
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.191.861.581.341.140.970.82

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
113.121.421.0112.11
212.111.232.0210.09
310.091.012.028.07
48.070.792.026.05
56.050.562.024.04
64.040.342.022.02
72.020.122.020.00

17 Licences and registrations

  • Udyam registration
  • GST
  • BIS certification to IS 7404 / IS 6162 where buyers ask for it
  • State Pollution Control Board consent
  • Factory licence

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. DC-MSME project profile — DPC Wire — https://www.dcmsme.gov.in/publications/pmryprof/electrical/ch10.pdf
  2. DGFT — ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.