Porcelain Electrical Insulator Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹20.42 lakh and ₹20.42 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Porcelain Electrical Insulator Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹14.07 L
Term loan from bank
₹9.15 L
Promoter’s contribution
₹1.41 L
Subsidy
₹3.52 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.46 L
Average DSCR
-1.78
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Make glazed porcelain insulators for power lines, transformers and wiring from clay, feldspar and quartz.

Main product or servicePorcelain Electrical Insulator Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Power distribution companies
  • Transformer and switchgear makers
  • Electrical contractors and dealers
  • Government and utility tenders
  • Supply to OEMs and dealers

05 Plant and machinery

ItemQty₹Total ₹
Ball mill11,00,0001,00,000
Blunger140,00040,000
Filter press11,00,0001,00,000
De-airing pug mill12,00,0002,00,000
Shaping machine12,00,0002,00,000
Glazing machine (16–25 dipping arms)13,00,0003,00,000
Kiln11,00,0001,00,000
Racks, shutter, moulds and material-handling equipment (× 1 lot)13,00,0003,00,000
Total13,40,000

Pre-filled from: PMEGP sample project report — Insulator (prepared by Udyami/Samadhan); DGFT – ITC(HS) 2022 Schedule (Notification 54 dated 9 Feb 2022). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Ball clay and china clay — ground to fine powder in the ball mill
  • Feldspar and quartz — mixed with the clays into slip
  • Glazing material, chemicals and colour — glaze adds strength and a smooth surface
  • Metal fittings, Portland cement and wooden packing — fittings are cemented to the porcelain

07 Cost of project

₹ in lakh
Plant and machinery13.40
Contingency0.67
Total fixed capital14.07
Working capital margin0.00
Total project cost14.07

08 Means of finance

₹ in lakh%
Promoter’s contribution1.4110.0
Subsidy3.5225.0
Term loan from bank9.1565.0
Total14.07100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.280.280.280.280.280.280.28
Insurance0.070.070.070.070.070.070.07
Total cost of operations3.233.233.233.233.233.233.23
Operating profit (EBITDA)-3.23-3.23-3.23-3.23-3.23-3.23-3.23
Depreciation2.111.791.521.301.100.940.80
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.990.860.700.550.390.240.08
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-6.33-5.88-5.46-5.08-4.73-4.41-4.11
Income tax0.000.000.000.000.000.000.00
Profit after tax-6.33-5.88-5.46-5.08-4.73-4.41-4.11

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-6.33-5.88-5.46-5.08-4.73-4.41-4.11
Depreciation2.111.791.521.301.100.940.80
Cash accruals (PAT + depreciation)-4.22-4.09-3.93-3.78-3.63-3.47-3.32
Term loan repaid0.701.411.411.411.411.411.41
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-4.93-5.50-5.34-5.19-5.03-4.88-4.72
Cash and bank-4.93-10.42-15.76-20.95-25.98-30.86-35.58

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)4.924.924.924.924.924.924.92
Reserves and surplus-6.33-12.22-17.67-22.75-27.48-31.88-36.00
Term loan outstanding8.447.045.634.222.811.410.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities7.03-0.26-7.12-13.61-19.74-25.55-31.07
Net fixed assets11.9610.178.647.346.245.314.51
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-4.93-10.42-15.76-20.95-25.98-30.86-35.58
Total assets7.03-0.26-7.12-13.61-19.74-25.55-31.07

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.91-1.43-1.53-1.65-1.80-1.96-2.17
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.78
Lowest DSCR-2.17
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.111.791.521.301.100.940.80

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
19.150.990.708.44
28.440.861.417.04
37.040.701.415.63
45.630.551.414.22
54.220.391.412.81
62.810.241.411.41
71.410.081.410.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • BIS certification (listed in the report)
  • Trade licence from the local body
  • Fire NOC
  • Consent from the State Pollution Control Board
  • Factory licence
  • Trademark for your brand name (optional)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. PMEGP sample project report — Insulator (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/insulator_%28_Samadhan_Projects_%29.pdf
  2. DGFT – ITC(HS) 2022 Schedule (Notification 54 dated 9 Feb 2022) — https://content.dgft.gov.in/Website/dgftprod/7d5fd1eb-ad39-4c99-b760-014223657469/Eng-Notification%2054%20dated%209%20Feb%202022%20ITC(HS)%202022%20_with%20Annexures.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.