Detailed Project Report

Engineering Scale (Acrylic Ruler) Making

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹16.22 L
Term loan from bank
₹10.54 L
Promoter’s contribution
₹1.62 L
Subsidy
₹4.06 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-5.85 L
Average DSCR
-1.57
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Cut acrylic sheet into 12-inch scales, polish the edges and print fine graduations on an automated marking machine.

Main product or serviceEngineering Scale (Acrylic Ruler) Making
Installed capacity per year (at 100%)10,000 units

04 Market

  • Schools and science colleges
  • Architects and drawing offices
  • Engineering workshops
  • Stationery wholesalers and retailers
  • Institutional supply to schools and colleges

05 Plant and machinery

ItemQty₹Total ₹
Automated scale marking machine with accessories, graduation accuracy 0.01 mm114,85,00014,85,000
Bevel-edge grinding machine, bench type, 8 inch wheel118,00018,000
Bench pantograph engraving machine, 16 inch table115,00015,000
Band saw, bench model, 8 inch wheel112,00012,000
Linear polishing machine18,0008,000
Double-ended bench grinder, 6 inch wheel17,0007,000
Total15,45,000

Pre-filled from: DC-MSME project profile — Engineering Scale. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Acrylic sheet, 1/8 inch thick, transparent or milky white — 500 kg a month, ₹72,500
  • Marking ink, polishing and buffing material — ₹5,000 a month
  • Packing cases, cartons and plastic bags — ₹2,500 a month

07 Cost of project

₹ in lakh
Plant and machinery15.45
Contingency0.77
Total fixed capital16.22
Working capital margin0.00
Total project cost16.22

08 Means of finance

₹ in lakh%
Promoter’s contribution1.6210.0
Subsidy4.0625.0
Term loan from bank10.5465.0
Total16.22100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.320.320.320.320.320.320.32
Insurance0.080.080.080.080.080.080.08
Total cost of operations3.293.293.293.293.293.293.29
Operating profit (EBITDA)-3.29-3.29-3.29-3.29-3.29-3.29-3.29
Depreciation2.432.071.761.491.271.080.92
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.140.990.810.630.450.280.10
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-6.86-6.34-5.85-5.41-5.01-4.64-4.30
Income tax0.000.000.000.000.000.000.00
Profit after tax-6.86-6.34-5.85-5.41-5.01-4.64-4.30

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-6.86-6.34-5.85-5.41-5.01-4.64-4.30
Depreciation2.432.071.761.491.271.080.92
Cash accruals (PAT + depreciation)-4.43-4.27-4.10-3.92-3.74-3.56-3.38
Term loan repaid0.811.621.621.621.621.621.62
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.24-5.90-5.72-5.54-5.36-5.18-5.00
Cash and bank-5.24-11.13-16.85-22.39-27.75-32.94-37.94

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)5.685.685.685.685.685.685.68
Reserves and surplus-6.86-13.20-19.06-24.47-29.48-34.12-38.42
Term loan outstanding9.738.116.494.873.241.620.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities8.550.59-6.89-13.92-20.56-26.82-32.74
Net fixed assets13.7911.729.968.477.206.125.20
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.24-11.13-16.85-22.39-27.75-32.94-37.94
Total assets8.550.59-6.89-13.92-20.56-26.82-32.74

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.68-1.26-1.35-1.46-1.58-1.73-1.91
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.57
Lowest DSCR-1.91
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.432.071.761.491.271.080.92

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
110.541.140.819.73
29.730.991.628.11
38.110.811.626.49
46.490.631.624.87
54.870.451.623.24
63.240.281.621.62
71.620.101.620.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Trade licence from the local body
  • Legal Metrology requirements for measuring instruments — check with the state department before selling

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Engineering Scale — https://www.dcmsme.gov.in/old/reports/mechanical/EngineeringScales.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.