01 Project at a glance
- Total project cost
- ₹0.00 L
- Term loan from bank
- ₹0.00 L
- Promoter’s contribution
- ₹0.00 L
- Sales · Year 3
- ₹0.00 L
- Profit after tax · Year 3
- ₹-2.88 L
- Average DSCR
- —
- Break-even (% of capacity used)
- —
02 Promoter and unit
| Promoter name | — |
|---|---|
| Business / firm name | — |
| Legal form | Proprietorship |
| Address of the unit | — |
| Applicant category | General · Rural |
03 The project
Grind and mix soybean meal, oil cakes, maize and minerals, extrude them into floating pellets, dry, oil-coat and bag them for fish farmers.
| Main product or service | Fish Feed Plant (Floating Pellets) |
|---|---|
| Installed capacity per year (at 100%) | 10,000 units |
04 Market
- Pond fish farmers
- Fish seed (hatchery) units
- Ornamental fish keepers
- Fisheries cooperatives
- Dealers of fisheries inputs
- Direct supply to large farms
- Cooperatives and FPOs
05 Plant and machinery
| Item | Qty | ₹ | Total ₹ |
|---|---|---|---|
| Intake hopper | 1 | 0 | 0 |
| Screw conveyor | 1 | 0 | 0 |
| Elevator | 1 | 0 | 0 |
| Grinding bin | 1 | 0 | 0 |
| Grizzly feeder | 1 | 0 | 0 |
| Hammer mill | 1 | 0 | 0 |
| Air fan with cyclone | 1 | 0 | 0 |
| Mixer hopper | 1 | 0 | 0 |
| Paddle-type mixer | 1 | 0 | 0 |
| Pellet hopper | 1 | 0 | 0 |
| Pellet conditioner (steam) | 1 | 0 | 0 |
| Extruder machine (floating feed) | 1 | 0 | 0 |
| Air conveyor | 1 | 0 | 0 |
| 5-layer dryer with electric heater | 1 | 0 | 0 |
| Cooler | 1 | 0 | 0 |
| Vibratory screen | 1 | 0 | 0 |
| Packaging machine | 1 | 0 | 0 |
| Boiler | 1 | 0 | 0 |
| Total | 0 |
Pre-filled from: UP MSME 1-Connect project profile — Automatic Fish Feed Plant. Prices in older reports will have gone up — enter today’s quotations.
06 Raw materials
- Soybean meal — about 48% protein; the most popular protein source in fish feed
- Cottonseed meal — about 41% protein; usually 10–15% of the feed
- Groundnut cake — about 40% crude protein
- Maize (corn grain) — at least 15–20% for floating pellets
- Wheat flour — 2–5%, mainly as a pellet binder
- Rice bran — high in fat, so used in limited amounts
- Fish meal or meat-and-bone/blood meal blend — protein source
- Mineral mixture and vitamins — supplements
07 Cost of project
| ₹ in lakh | |
|---|---|
| Total fixed capital | 0.00 |
| Working capital margin | 0.00 |
| Total project cost | 0.00 |
08 Means of finance
| ₹ in lakh | % | |
|---|---|---|
| Total | 0.00 | 100.0 |
| Working capital loan (outside project cost) | 0.00 |
09 Key assumptions
| Selling price | ₹0 per units |
|---|---|
| Raw material & packing cost | ₹0 per units |
| Capacity used each year | 60% · 70% · 80% · 80% · 80% · 80% · 80% |
| Term loan interest rate (% a year) | 11% · 84 months (Moratorium 6) |
| Working capital method | Turnover method (RBI) · Working capital interest (% a year) 11% |
| Income tax rate | 25% |
| Yearly price and cost rise | 0% |
10 Production and sales
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Capacity used | 60% | 70% | 80% | 80% | 80% | 80% | 80% |
| Production (units) | 6,000 | 7,000 | 8,000 | 8,000 | 8,000 | 8,000 | 8,000 |
| Sales | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
11 Projected profitability
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Sales | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Raw material and packing | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Power and fuel | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Salaries and wages | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 |
| Rent | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Administration | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Selling and distribution | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Repairs and maintenance | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Insurance | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Total cost of operations | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 |
| Operating profit (EBITDA) | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Depreciation | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Preliminary expenses written off | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest on term loan | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest on working capital | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Profit before tax | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Income tax | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Profit after tax | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
12 Cash flow
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Profit after tax | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Depreciation | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Cash accruals (PAT + depreciation) | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Term loan repaid | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Owner’s drawings | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Surplus after repayment | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 | -2.88 |
| Cash and bank | -2.88 | -5.76 | -8.64 | -11.52 | -14.40 | -17.28 | -20.16 |
13 Projected balance sheet
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Capital (own + subsidy) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Reserves and surplus | -2.88 | -5.76 | -8.64 | -11.52 | -14.40 | -17.28 | -20.16 |
| Term loan outstanding | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Working capital loan | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Total liabilities | -2.88 | -5.76 | -8.64 | -11.52 | -14.40 | -17.28 | -20.16 |
| Net fixed assets | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Preliminary expenses not written off | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Current assets (stock and debtors) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Cash and bank | -2.88 | -5.76 | -8.64 | -11.52 | -14.40 | -17.28 | -20.16 |
| Total assets | -2.88 | -5.76 | -8.64 | -11.52 | -14.40 | -17.28 | -20.16 |
14 Ratios and break-even
| Year | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Debt service coverage ratio (DSCR) | — | — | — | — | — | — | — |
| Break-even (% of capacity used) | — | — | — | — | — | — | — |
| Cash break-even | — | — | — | — | — | — | — |
| Average DSCR | — |
|---|---|
| Lowest DSCR | — |
| Payback period | — |
15 Depreciation
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Depreciation | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.
16 Term loan repayment
| Year | Opening | Interest | Term loan repaid | Closing |
|---|---|---|---|---|
| 1 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2 | 0.00 | 0.00 | 0.00 | 0.00 |
| 3 | 0.00 | 0.00 | 0.00 | 0.00 |
| 4 | 0.00 | 0.00 | 0.00 | 0.00 |
| 5 | 0.00 | 0.00 | 0.00 | 0.00 |
| 6 | 0.00 | 0.00 | 0.00 | 0.00 |
| 7 | 0.00 | 0.00 | 0.00 | 0.00 |
17 Licences and registrations
- Udyam registration
- GST
- Registration with the Bureau of Indian Standards (the report lists this)
- Trade licence
- Factory licence
- NOC from the Pollution Control Board
- NOC from the Fire Safety Board
- Boiler registration if the boiler falls under the Boilers Act
18 Government schemes that may apply
- Prime Minister's Employment Generation Programme (PMEGP)
- Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
- Stand-Up India
19 Sources
- UP MSME 1-Connect project profile — Automatic Fish Feed Plant — https://msme1connect.up.gov.in/Projectreport/Project%20Report638658920857849552.pdf
This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.