Detailed Project Report

Fluorescent Tube Starter Assembly

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹0.40 L
Term loan from bank
₹0.26 L
Promoter’s contribution
₹0.04 L
Subsidy
₹0.10 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-2.95 L
Average DSCR
-55.35
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Assemble glow starters for tube lights from bought-in glow lamps, condensers, brass contacts and cans.

Main product or serviceFluorescent Tube Starter Assembly
Installed capacity per year (at 100%)10,000 units

04 Market

  • Households and offices replacing starters
  • Electricians
  • Electrical retail shops
  • Electrical wholesalers

05 Plant and machinery

ItemQty₹Total ₹
Hand press No. 4 (× 2)110,00010,000
Bench drilling machine17,0007,000
Double-ended grinder14,5004,500
Hand riveting machine12,0002,000
HV tester 0–5 kV18,0008,000
Test bench with voltmeter, ammeter; multimeter; misc. (× 1 lot)17,0007,000
Total38,500

Pre-filled from: DC-MSME project profile — Starters for Fluorescent Tubes; DGFT — ITC(HS) classification of export and import items. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Glow lamps — 10,000 a month at ₹0.50 = ₹5,000
  • Condensers — 10,000 a month at ₹0.50 = ₹5,000
  • Aluminium or plastic cans — ₹5,000 a month
  • Brass contact sets — 10,000 a month at ₹0.20 = ₹2,000
  • Hylem sheet 1/16" and misc. items — ₹4,000 a month

07 Cost of project

₹ in lakh
Plant and machinery0.39
Contingency0.02
Total fixed capital0.40
Working capital margin0.00
Total project cost0.40

08 Means of finance

₹ in lakh%
Promoter’s contribution0.0410.0
Subsidy0.1025.0
Term loan from bank0.2665.0
Total0.40100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.010.010.010.010.010.010.01
Insurance0.000.000.000.000.000.000.00
Total cost of operations2.892.892.892.892.892.892.89
Operating profit (EBITDA)-2.89-2.89-2.89-2.89-2.89-2.89-2.89
Depreciation0.060.050.040.040.030.030.02
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.030.020.020.020.010.010.00
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-2.98-2.97-2.95-2.94-2.93-2.92-2.92
Income tax0.000.000.000.000.000.000.00
Profit after tax-2.98-2.97-2.95-2.94-2.93-2.92-2.92

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-2.98-2.97-2.95-2.94-2.93-2.92-2.92
Depreciation0.060.050.040.040.030.030.02
Cash accruals (PAT + depreciation)-2.92-2.91-2.91-2.91-2.90-2.90-2.89
Term loan repaid0.020.040.040.040.040.040.04
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-2.94-2.96-2.95-2.95-2.94-2.94-2.93
Cash and bank-2.94-5.89-8.84-11.79-14.73-17.67-20.60

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.140.140.140.140.140.140.14
Reserves and surplus-2.98-5.95-8.90-11.84-14.78-17.70-20.61
Term loan outstanding0.240.200.160.120.080.040.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-2.60-5.60-8.60-11.58-14.55-17.52-20.47
Net fixed assets0.340.290.250.210.180.150.13
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-2.94-5.89-8.84-11.79-14.73-17.67-20.60
Total assets-2.60-5.60-8.60-11.58-14.55-17.52-20.47

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-59.40-44.42-47.68-51.45-55.87-61.13-67.47
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-55.35
Lowest DSCR-67.47
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.060.050.040.040.030.030.02

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
10.260.030.020.24
20.240.020.040.20
30.200.020.040.16
40.160.020.040.12
50.120.010.040.08
60.080.010.040.04
70.040.000.040.00

17 Licences and registrations

  • Udyam registration
  • GST (above the threshold)
  • Trade licence from the local body

18 Government schemes that may apply

  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Prime Minister's Employment Generation Programme (PMEGP)
  • Mukhyamantri Yuva Udyami Vikas Abhiyan (CM-YUVA)

19 Sources

  1. DC-MSME project profile — Starters for Fluorescent Tubes — https://www.dcmsme.gov.in/publications/pmryprof/electrical/ch24.pdf
  2. DGFT — ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.