Detailed Project Report

Galvanised Steel (GI) Wire

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹42.53 L
Term loan from bank
₹27.64 L
Promoter’s contribution
₹4.25 L
Subsidy
₹10.63 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-10.68 L
Average DSCR
-0.72
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Draw mild-steel wire rod to size and coat it with zinc for poles, sleepers, precast products and fencing.

Main product or serviceGalvanised Steel (GI) Wire
Installed capacity per year (at 100%)10,000 units

04 Market

  • Precast concrete makers — railway sleepers, electric and telephone poles, pipes, door and window frames
  • Strand makers for electrical, railway and shipping use
  • Fencing and household users
  • Direct B2B supply
  • Steel and hardware traders
  • Government and PSU tenders

05 Plant and machinery

ItemQty₹Total ₹
Bull-block heavy-duty wire drawing machine, 750 mm drum, with motor14,00,0004,00,000
Bull-block heavy-duty wire drawing machine, 600 mm drum, with motor13,00,0003,00,000
Multi-stage wire drawing machine, 4 dies in a row12,00,0002,00,000
Pickling tank, 2 m × 8 m × 2 m11,00,0001,00,000
Oil-fired lead bath furnace, 6 m × 1 m × ½ m, with 7.5 HP blower and quenching tank16,20,0006,20,000
Oil-fired zinc furnace, 3 m × 1 m × ½ m, with 5 HP blower and fluxing tank17,15,0007,15,000
Water rinsing tank140,00040,000
Take-up machine with 12 spools, variable speed14,70,0004,70,000
Effluent treatment plant (neutralising and filtering tanks, water cooling)17,80,0007,80,000
Overhead crane, 2 tonne13,00,0003,00,000
Lathe, 4 ft bed, with motor175,00075,000
Other equipment and hand tools (× LS)150,00050,000
Total40,50,000

Pre-filled from: PMEGP sample project report — Galvanized MS Wire (prepared by Udyami/Samadhan); World Customs Organization – HS Nomenclature 2022, Chapter 72. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • MS wire rod, 6–8 mm — 1,000 tonnes a year at ₹35,000 a tonne = ₹350.00 L at full capacity
  • Lead — 5 tonnes at ₹1,50,000 a tonne = ₹7.50 L
  • Zinc — 50 tonnes at ₹2,00,000 a tonne = ₹100.00 L
  • Furnace oil — 100 KL at ₹30,000 = ₹30.00 L
  • Charcoal, oil, asbestos and other materials — ₹1.50 L a year (lump sum)

07 Cost of project

₹ in lakh
Plant and machinery40.50
Contingency2.03
Total fixed capital42.53
Working capital margin0.00
Total project cost42.53

08 Means of finance

₹ in lakh%
Promoter’s contribution4.2510.0
Subsidy10.6325.0
Term loan from bank27.6465.0
Total42.53100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.850.850.850.850.850.850.85
Insurance0.210.210.210.210.210.210.21
Total cost of operations3.943.943.943.943.943.943.94
Operating profit (EBITDA)-3.94-3.94-3.94-3.94-3.94-3.94-3.94
Depreciation6.385.424.613.923.332.832.41
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan2.992.592.121.661.190.720.25
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-13.31-11.96-10.68-9.52-8.46-7.49-6.60
Income tax0.000.000.000.000.000.000.00
Profit after tax-13.31-11.96-10.68-9.52-8.46-7.49-6.60

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-13.31-11.96-10.68-9.52-8.46-7.49-6.60
Depreciation6.385.424.613.923.332.832.41
Cash accruals (PAT + depreciation)-6.93-6.54-6.07-5.60-5.13-4.66-4.20
Term loan repaid2.134.254.254.254.254.254.25
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-9.06-10.79-10.32-9.85-9.38-8.92-8.45
Cash and bank-9.06-19.85-30.17-40.02-49.41-58.32-66.77

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)14.8814.8814.8814.8814.8814.8814.88
Reserves and surplus-13.31-25.27-35.95-45.46-53.93-61.42-68.02
Term loan outstanding25.5221.2617.0112.768.514.250.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities27.0910.88-4.05-17.82-30.54-42.28-53.14
Net fixed assets36.1530.7226.1222.2018.8716.0413.63
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-9.06-19.85-30.17-40.02-49.41-58.32-66.77
Total assets27.0910.88-4.05-17.82-30.54-42.28-53.14

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.77-0.58-0.62-0.67-0.72-0.79-0.88
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.72
Lowest DSCR-0.88
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation6.385.424.613.923.332.832.41

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
127.642.992.1325.52
225.522.594.2521.26
321.262.124.2517.01
417.011.664.2512.76
512.761.194.258.51
68.510.724.254.25
74.250.254.250.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • State Pollution Control Board consent (CTE/CTO)
  • Factory licence (depends on workers and power)
  • Fire NOC
  • BIS certification where the Steel Quality Control Order covers your wire grade
  • Trademark for your brand (optional)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. PMEGP sample project report — Galvanized MS Wire (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Galvanized_steel_wire_%28_Samadhan_Projects_%29.pdf
  2. World Customs Organization – HS Nomenclature 2022, Chapter 72 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/1572_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.