Building BusinessServices

Section 24

Hacksaw Blade Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹39.87 lakh and ₹39.87 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Hacksaw Blade Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹22.31 L
Term loan from bank
₹14.50 L
Promoter’s contribution
₹2.23 L
Subsidy
₹5.58 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-6.97 L
Average DSCR
-1.19
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Cut steel strip into blanks, mill the teeth and heat-treat them to make hand and power hacksaw blades.

Main product or serviceHacksaw Blade Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Engineering and fabrication workshops
  • Auto repair, fitting and welding shops
  • Technical institutes
  • Government departments such as Railways, Defence and PWD
  • Hardware and tool wholesalers
  • Government tenders and rate contracts

05 Plant and machinery

ItemQty₹Total ₹
Semi-automatic metal strip cutting machine, 50 mm, 5 HP motor13,70,0003,70,000
Strip straightening and cutting machine, 50 mm width, 5 HP motor14,50,0004,50,000
Universal milling machine with attachment, 7 HP motor14,00,0004,00,000
Power press, 20 tonnes14,50,0004,50,000
Automatic temperature-controlled heat treatment plant with 70 kVA LT transformer13,50,0003,50,000
Stamping machine125,00025,000
Rockwell hardness testing machine120,00020,000
Bench grinder, 250 mm wheel, 1 HP motor110,00010,000
Gauges, tools and other equipment150,00050,000
Total21,25,000

Pre-filled from: DC-MSME project profile — Hacksaw Blade. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Carbon-steel strip, 12.5 mm wide x 0.60 mm thick — 1,200 kg a month at ₹55 a kg
  • Carbon-steel strip, 25 mm wide x 1.20 mm thick — 2,200 kg a month at ₹48 a kg
  • High-speed-steel strip, 25 mm wide x 1.20 mm thick — 2,600 kg a month at ₹80 a kg
  • Packing material — ₹50,000 a month

07 Cost of project

₹ in lakh
Plant and machinery21.25
Contingency1.06
Total fixed capital22.31
Working capital margin0.00
Total project cost22.31

08 Means of finance

₹ in lakh%
Promoter’s contribution2.2310.0
Subsidy5.5825.0
Term loan from bank14.5065.0
Total22.31100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.450.450.450.450.450.450.45
Insurance0.110.110.110.110.110.110.11
Total cost of operations3.443.443.443.443.443.443.44
Operating profit (EBITDA)-3.44-3.44-3.44-3.44-3.44-3.44-3.44
Depreciation3.352.842.422.061.751.491.26
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.571.361.110.870.620.380.13
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-8.35-7.64-6.97-6.36-5.81-5.30-4.83
Income tax0.000.000.000.000.000.000.00
Profit after tax-8.35-7.64-6.97-6.36-5.81-5.30-4.83

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-8.35-7.64-6.97-6.36-5.81-5.30-4.83
Depreciation3.352.842.422.061.751.491.26
Cash accruals (PAT + depreciation)-5.01-4.80-4.55-4.31-4.06-3.82-3.57
Term loan repaid1.122.232.232.232.232.232.23
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-6.12-7.03-6.78-6.54-6.29-6.05-5.80
Cash and bank-6.12-13.15-19.94-26.47-32.77-38.81-44.62

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)7.817.817.817.817.817.817.81
Reserves and surplus-8.35-16.00-22.97-29.33-35.14-40.44-45.27
Term loan outstanding13.3911.168.936.694.462.230.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities12.842.97-6.23-14.83-22.87-30.40-37.46
Net fixed assets18.9716.1213.7011.659.908.427.15
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-6.12-13.15-19.94-26.47-32.77-38.81-44.62
Total assets12.842.97-6.23-14.83-22.87-30.40-37.46

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.28-0.96-1.03-1.11-1.20-1.32-1.45
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.19
Lowest DSCR-1.45
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation3.352.842.422.061.751.491.26

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
114.501.571.1213.39
213.391.362.2311.16
311.161.112.238.93
48.930.872.236.69
56.690.622.234.46
64.460.382.232.23
72.230.132.230.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence where the worker and power limits apply
  • Trade licence from the local body
  • BIS licence if you want the ISI mark (IS 2594)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Hacksaw Blade — https://www.dcmsme.gov.in/old/reports/mechanical/hacksawblade.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.