Detailed Project Report

Heat Treatment Job-Work Unit

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹5.27 L
Term loan from bank
₹3.42 L
Promoter’s contribution
₹0.53 L
Subsidy
₹1.32 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.85 L
Average DSCR
-4.43
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Harden, temper, anneal and case-harden steel parts as job work for engineering units that have no furnace of their own.

Main product or serviceHeat Treatment Job-Work Unit
Installed capacity per year (at 100%)10,000 units

04 Market

  • Defence and railway suppliers
  • Automobile part makers
  • Ball and roller bearing makers
  • Fastener and hardware makers
  • Machine tool and general engineering units
  • Job work collected from nearby engineering units
  • Regular contracts with tool rooms and auto-part vendors

05 Plant and machinery

ItemQty₹Total ₹
Electric muffle furnace, 600 × 300 × 300 mm, 24 KW, up to 1,000°C156,50056,500
Air-circulating tempering furnace, 18 KW11,11,0001,11,000
Oil-fired salt bath furnace, pot 450 × 600 mm, up to 1,000°C12,08,0002,08,000
Pre-heating chamber for the salt bath furnace165,00065,000
Hardness testing machine (Rockwell A, B, C), 150 kg load121,00021,000
Quenching tanks, 1 × 0.75 × 1 m (× 4)124,00024,000
Chain pulley block, 1 MT, with tripod18,0008,000
Platform weighing machine, 200 kg18,0008,000
Total5,01,500

Pre-filled from: DC-MSME project profile — Heat Treatment Servicing Unit. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Cyanide salt — 150 kg at ₹65 a kg for the first filling in the profile
  • Neutral salt — 100 kg at ₹15 a kg in the profile
  • Barium carbonate — 50 kg at ₹12 a kg in the profile
  • Quenching oil — 4 barrels at ₹8,000 each in the profile
  • Furnace oil or light diesel oil for the salt bath

07 Cost of project

₹ in lakh
Plant and machinery5.02
Contingency0.25
Total fixed capital5.27
Working capital margin0.00
Total project cost5.27

08 Means of finance

₹ in lakh%
Promoter’s contribution0.5310.0
Subsidy1.3225.0
Term loan from bank3.4265.0
Total5.27100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.110.110.110.110.110.110.11
Insurance0.030.030.030.030.030.030.03
Total cost of operations3.013.013.013.013.013.013.01
Operating profit (EBITDA)-3.01-3.01-3.01-3.01-3.01-3.01-3.01
Depreciation0.790.670.570.490.410.350.30
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.370.320.260.210.150.090.03
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-4.17-4.00-3.85-3.70-3.57-3.45-3.34
Income tax0.000.000.000.000.000.000.00
Profit after tax-4.17-4.00-3.85-3.70-3.57-3.45-3.34

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-4.17-4.00-3.85-3.70-3.57-3.45-3.34
Depreciation0.790.670.570.490.410.350.30
Cash accruals (PAT + depreciation)-3.38-3.33-3.27-3.22-3.16-3.10-3.04
Term loan repaid0.260.530.530.530.530.530.53
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.65-3.86-3.80-3.74-3.69-3.63-3.57
Cash and bank-3.65-7.50-11.31-15.05-18.73-22.36-25.93

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.841.841.841.841.841.841.84
Reserves and surplus-4.17-8.18-12.02-15.72-19.29-22.75-26.09
Term loan outstanding3.162.632.111.581.050.530.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities0.83-3.70-8.07-12.30-16.40-20.38-24.24
Net fixed assets4.483.803.232.752.341.991.69
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.65-7.50-11.31-15.05-18.73-22.36-25.93
Total assets0.83-3.70-8.07-12.30-16.40-20.38-24.24

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-4.75-3.55-3.81-4.12-4.47-4.89-5.40
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-4.43
Lowest DSCR-5.40
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.790.670.570.490.410.350.30

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
13.420.370.263.16
23.160.320.532.63
32.630.260.532.11
42.110.210.531.58
51.580.150.531.05
61.050.090.530.53
70.530.030.530.00

17 Licences and registrations

  • Udyam registration
  • GST
  • State Pollution Control Board consent and hazardous waste authorisation (cyanide salt and spent oil)
  • Factory licence under the Factories Act
  • Fire safety NOC (oil-fired furnace and quench oil)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Heat Treatment Servicing Unit — https://www.dcmsme.gov.in/publications/pmryprof/meatllurgical/ch12.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.