Hydraulic Press and Shearing Machine Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹108.58 lakh and ₹108.58 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Hydraulic Press and Shearing Machine Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹31.19 L
Term loan from bank
₹28.07 L
Promoter’s contribution
₹3.12 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-9.20 L
Average DSCR
-0.66
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Build hydraulic presses and sheet-shearing machines for metal workshops and factories.

Main product or serviceHydraulic Press and Shearing Machine Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Sheet-metal and fabrication units
  • Auto-component and appliance makers
  • Engineering workshops
  • Direct sales and trade fairs
  • Machine-tool dealers

05 Plant and machinery

ItemQty₹Total ₹
5-axis CNC measuring machine16,50,0006,50,000
Vertical lathe15,00,0005,00,000
Planing machine14,50,0004,50,000
Heavy duty milling machine13,50,0003,50,000
Radial drilling machine13,00,0003,00,000
Precision lathe12,50,0002,50,000
Jib crane11,00,0001,00,000
Shaping machine180,00080,000
Welding machine180,00080,000
Power saw machine160,00060,000
Die tools and gauges (× 1 lot)11,50,0001,50,000
Total29,70,000

Pre-filled from: SIDBI Stand-Up Mitra project profile — Hydraulic Press and Shearing Machine. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Castings and forgings for frames, beds and columns — as per machine design
  • Hydraulic cylinders, plungers, power packs and valves — made in-house or bought from reputed makers
  • Motors, shear blades, lubrication pumps and electrical controls

07 Cost of project

₹ in lakh
Plant and machinery29.70
Contingency1.49
Total fixed capital31.19
Working capital margin0.00
Total project cost31.19

08 Means of finance

₹ in lakh%
Promoter’s contribution3.1210.0
Term loan from bank28.0790.0
Total31.19100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.620.620.620.620.620.620.62
Insurance0.160.160.160.160.160.160.16
Total cost of operations3.663.663.663.663.663.663.66
Operating profit (EBITDA)-3.66-3.66-3.66-3.66-3.66-3.66-3.66
Depreciation4.683.983.382.872.442.081.76
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan3.042.632.161.681.210.730.26
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-11.38-10.27-9.20-8.21-7.31-6.47-5.68
Income tax0.000.000.000.000.000.000.00
Profit after tax-11.38-10.27-9.20-8.21-7.31-6.47-5.68

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-11.38-10.27-9.20-8.21-7.31-6.47-5.68
Depreciation4.683.983.382.872.442.081.76
Cash accruals (PAT + depreciation)-6.70-6.29-5.82-5.34-4.87-4.39-3.92
Term loan repaid2.164.324.324.324.324.324.32
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-8.86-10.61-10.13-9.66-9.18-8.71-8.23
Cash and bank-8.86-19.47-29.60-39.26-48.45-57.16-65.39

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)3.123.123.123.123.123.123.12
Reserves and surplus-11.38-21.64-30.84-39.05-46.36-52.83-58.51
Term loan outstanding25.9121.5917.2712.958.644.320.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities17.653.07-10.45-22.98-34.61-45.39-55.39
Net fixed assets26.5122.5319.1516.2813.8411.7610.00
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-8.86-19.47-29.60-39.26-48.45-57.16-65.39
Total assets17.653.07-10.45-22.98-34.61-45.39-55.39

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.70-0.53-0.57-0.61-0.66-0.72-0.80
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.66
Lowest DSCR-0.80
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation4.683.983.382.872.442.081.76

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
128.073.042.1625.91
225.912.634.3221.59
321.592.164.3217.27
417.271.684.3212.95
512.951.214.328.64
68.640.734.324.32
74.320.264.320.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence and plan approval
  • ESI and PF registration
  • IEC code for exports

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. SIDBI Stand-Up Mitra project profile — Hydraulic Press and Shearing Machine — https://www.standupmitra.in/Default/ViewFile/?id=1521221919231_Hydraulic%20And%20Shearing%20Machines.docx&path=ProjectProfile

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.