Detailed Project Report

Insulation Tester (Megger) Assembly

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹5.72 L
Term loan from bank
₹3.71 L
Promoter’s contribution
₹0.57 L
Subsidy
₹1.43 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.93 L
Average DSCR
-4.09
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Assemble and calibrate battery-run electronic insulation testers that electricians use to check wiring, motors, cables and transformers.

Main product or serviceInsulation Tester (Megger) Assembly
Installed capacity per year (at 100%)10,000 units

04 Market

  • Electrical contractors and electricians
  • Makers and repairers of motors, cables and transformers
  • Power utilities and factory maintenance departments
  • Electrical instrument dealers
  • Electrical and instrument dealers
  • Direct sales to contractors and industry through sales executives
  • Tenders of utilities and government departments

05 Plant and machinery

ItemQty₹Total ₹
Wave soldering machine12,80,0002,80,000
Computers with printer (× 3)11,20,0001,20,000
Digital storage oscilloscope (100 MHz)148,00048,000
Soldering iron stations (× 4)128,00028,000
LCR meter124,00024,000
Regulated DC source120,00020,000
Digital multimeters (× 2)19,0009,000
Standard resistance box17,5007,500
De-soldering pumps (× 4)14,8004,800
Magnifying glass with light13,0003,000
Total5,44,300

Pre-filled from: DC-MSME import-substitution DPR — Insulation Tester (Transistorised). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Parts for the basic model including PCB and outer case — ₹4,000 a piece for 250 pieces a month = ₹10,00,000
  • Resistors, capacitors, diodes, zener diodes, transistors and ICs — listed in the report; cost is inside the ₹4,000 a piece
  • Transformer, battery, rotary switch, preset, case and analog meter display — listed in the report; cost is inside the ₹4,000 a piece

07 Cost of project

₹ in lakh
Plant and machinery5.44
Contingency0.27
Total fixed capital5.72
Working capital margin0.00
Total project cost5.72

08 Means of finance

₹ in lakh%
Promoter’s contribution0.5710.0
Subsidy1.4325.0
Term loan from bank3.7165.0
Total5.72100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.110.110.110.110.110.110.11
Insurance0.030.030.030.030.030.030.03
Total cost of operations3.023.023.023.023.023.023.02
Operating profit (EBITDA)-3.02-3.02-3.02-3.02-3.02-3.02-3.02
Depreciation0.860.730.620.530.450.380.32
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.400.350.290.220.160.100.03
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-4.28-4.10-3.93-3.77-3.63-3.50-3.38
Income tax0.000.000.000.000.000.000.00
Profit after tax-4.28-4.10-3.93-3.77-3.63-3.50-3.38

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-4.28-4.10-3.93-3.77-3.63-3.50-3.38
Depreciation0.860.730.620.530.450.380.32
Cash accruals (PAT + depreciation)-3.42-3.37-3.31-3.25-3.18-3.12-3.06
Term loan repaid0.290.570.570.570.570.570.57
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.71-3.94-3.88-3.82-3.75-3.69-3.63
Cash and bank-3.71-7.65-11.53-15.35-19.10-22.80-26.42

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)2.002.002.002.002.002.002.00
Reserves and surplus-4.28-8.38-12.31-16.08-19.71-23.21-26.59
Term loan outstanding3.432.862.291.711.140.570.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities1.15-3.52-8.02-12.37-16.57-20.64-24.59
Net fixed assets4.864.133.512.982.542.161.83
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.71-7.65-11.53-15.35-19.10-22.80-26.42
Total assets1.15-3.52-8.02-12.37-16.57-20.64-24.59

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-4.39-3.29-3.53-3.81-4.13-4.52-4.99
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-4.09
Lowest DSCR-4.99
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.860.730.620.530.450.380.32

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
13.710.400.293.43
23.430.350.572.86
32.860.290.572.29
42.290.220.571.71
51.710.160.571.14
61.140.100.570.57
70.570.030.570.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Trade licence or shop and establishment registration
  • Calibration certificates traceable to an accredited laboratory
  • BIS certification to IS 10656 where the buyer asks for it

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME import-substitution DPR — Insulation Tester (Transistorised) — https://dcmsme.gov.in/35_Insulation%20Tester%20by%20Sunil%20Newar-converted.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.