Building BusinessServices

Section 24

Knitted Woollen Mufflers

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹3.99 lakh and ₹3.99 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Knitted Woollen Mufflers

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹0.91 L
Term loan from bank
₹0.59 L
Promoter’s contribution
₹0.09 L
Subsidy
₹0.23 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.05 L
Average DSCR
-24.60
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Knit acrylic or woollen yarn on hand-operated circular machines into cheap winter mufflers.

Main product or serviceKnitted Woollen Mufflers
Installed capacity per year (at 100%)10,000 units

04 Market

  • Men in cold and hilly areas
  • Low-income buyers wanting cheap winter wear
  • Winter-wear wholesalers
  • Hosiery shops and weekly markets

05 Plant and machinery

ItemQty₹Total ₹
Hand-operated circular knitting machine, 6½" dia, 240 needles, with designing wheels (× 4)160,00060,000
Three-thread overlock machine with motor and stand15,0005,000
Sewing machine with stand and motor12,0002,000
Office furniture, cutting and pressing tables, wooden stands, electric press (× 1 lot)120,00020,000
Total87,000

Pre-filled from: DC-MSME project profile — Woollen Mufflers Knitted; DGFT — ITC(HS) classification of export and import items. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Dyed acrylic yarn, 2/32s or 2/40s count — 380 kg a month at ₹160/kg = ₹60,800 (with wastage)
  • Sewing thread, stickers, labels, polythene bags, boxes — ₹5,200 a month

07 Cost of project

₹ in lakh
Plant and machinery0.87
Contingency0.04
Total fixed capital0.91
Working capital margin0.00
Total project cost0.91

08 Means of finance

₹ in lakh%
Promoter’s contribution0.0910.0
Subsidy0.2325.0
Term loan from bank0.5965.0
Total0.91100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.020.020.020.020.020.020.02
Insurance0.000.000.000.000.000.000.00
Total cost of operations2.902.902.902.902.902.902.90
Operating profit (EBITDA)-2.90-2.90-2.90-2.90-2.90-2.90-2.90
Depreciation0.140.120.100.080.070.060.05
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.060.060.050.040.030.020.01
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.10-3.07-3.05-3.02-3.00-2.98-2.96
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.10-3.07-3.05-3.02-3.00-2.98-2.96

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.10-3.07-3.05-3.02-3.00-2.98-2.96
Depreciation0.140.120.100.080.070.060.05
Cash accruals (PAT + depreciation)-2.97-2.96-2.95-2.94-2.93-2.92-2.91
Term loan repaid0.050.090.090.090.090.090.09
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.01-3.05-3.04-3.03-3.02-3.01-3.00
Cash and bank-3.01-6.06-9.10-12.13-15.15-18.16-21.16

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.320.320.320.320.320.320.32
Reserves and surplus-3.10-6.18-9.23-12.25-15.25-18.23-21.19
Term loan outstanding0.550.460.370.270.180.090.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-2.24-5.40-8.54-11.66-14.75-17.82-20.87
Net fixed assets0.780.660.560.480.410.340.29
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.01-6.06-9.10-12.13-15.15-18.16-21.16
Total assets-2.24-5.40-8.54-11.66-14.75-17.82-20.87

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-26.40-19.74-21.19-22.87-24.83-27.17-29.99
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-24.60
Lowest DSCR-29.99
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.140.120.100.080.070.060.05

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
10.590.060.050.55
20.550.060.090.46
30.460.050.090.37
40.370.040.090.27
50.270.030.090.18
60.180.020.090.09
70.090.010.090.00

17 Licences and registrations

  • Udyam registration
  • GST
  • Trade licence from the local body

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Mukhyamantri Yuva Udyami Vikas Abhiyan (CM-YUVA)

19 Sources

  1. DC-MSME project profile — Woollen Mufflers Knitted — https://www.dcmsme.gov.in/publications/pmryprof/hosiery/ch24.pdf
  2. DGFT — ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.