Building BusinessServices

Section 24

Laminate Wood Flooring

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹23.17 lakh and ₹23.17 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Laminate Wood Flooring

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹17.85 L
Term loan from bank
₹11.60 L
Promoter’s contribution
₹1.79 L
Subsidy
₹4.46 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-6.15 L
Average DSCR
-1.44
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Press decor paper and wear layer onto fibreboard, cut it into click-fit planks and pack them.

Main product or serviceLaminate Wood Flooring
Installed capacity per year (at 100%)10,000 units

04 Market

  • Home owners renovating living rooms and bedrooms
  • Offices and shops
  • Builders and interior contractors
  • Flooring and tile dealers
  • Plywood and laminate shops
  • Direct supply to contractors

05 Plant and machinery

ItemQty₹Total ₹
Multi-rip cutting line13,00,0003,00,000
Laminate flooring DET (double-end tenoner) production line17,00,0007,00,000
Automatic painting and waxing line13,00,0003,00,000
Automatic film shrink packing line14,00,0004,00,000
Total17,00,000

Pre-filled from: PMEGP sample project report — Laminate Wood Flooring (prepared by Udyami/Samadhan); DGFT – ITC(HS) classification of export and import items. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Wear-resistant (overlay) paper — top clear layer
  • Melamine wood-grain decor paper — gives the wood look
  • HDF substrate board — the core of the plank
  • Balance paper — bottom layer that stops bending
  • Wax, cartons and pallets — for edge sealing and packing

07 Cost of project

₹ in lakh
Plant and machinery17.00
Contingency0.85
Total fixed capital17.85
Working capital margin0.00
Total project cost17.85

08 Means of finance

₹ in lakh%
Promoter’s contribution1.7910.0
Subsidy4.4625.0
Term loan from bank11.6065.0
Total17.85100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.360.360.360.360.360.360.36
Insurance0.090.090.090.090.090.090.09
Total cost of operations3.333.333.333.333.333.333.33
Operating profit (EBITDA)-3.33-3.33-3.33-3.33-3.33-3.33-3.33
Depreciation2.682.281.931.641.401.191.01
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.261.090.890.700.500.300.11
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-7.26-6.69-6.15-5.67-5.22-4.82-4.44
Income tax0.000.000.000.000.000.000.00
Profit after tax-7.26-6.69-6.15-5.67-5.22-4.82-4.44

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-7.26-6.69-6.15-5.67-5.22-4.82-4.44
Depreciation2.682.281.931.641.401.191.01
Cash accruals (PAT + depreciation)-4.58-4.41-4.22-4.02-3.83-3.63-3.43
Term loan repaid0.891.791.791.791.791.791.79
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.47-6.20-6.00-5.81-5.61-5.41-5.22
Cash and bank-5.47-11.67-17.68-23.48-29.09-34.51-39.73

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)6.256.256.256.256.256.256.25
Reserves and surplus-7.26-13.95-20.10-25.77-30.99-35.81-40.25
Term loan outstanding10.718.937.145.363.571.790.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities9.701.22-6.71-14.17-21.17-27.78-34.00
Net fixed assets15.1712.9010.969.327.926.735.72
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.47-11.67-17.68-23.48-29.09-34.51-39.73
Total assets9.701.22-6.71-14.17-21.17-27.78-34.00

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.55-1.16-1.24-1.34-1.46-1.59-1.76
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.44
Lowest DSCR-1.76
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.682.281.931.641.401.191.01

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
111.601.260.8910.71
210.711.091.798.93
38.930.891.797.14
47.140.701.795.36
55.360.501.793.57
63.570.301.791.79
71.790.111.790.00

17 Licences and registrations

  • Udyam registration
  • GST
  • Fire NOC
  • State Pollution Control Board NOC
  • Trade licence
  • Factory licence (optional, per report)
  • IEC for import or export (optional)
  • Trademark for your brand (optional)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. PMEGP sample project report — Laminate Wood Flooring (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/laminate_wood_flooring_%28_Samadhan_Projects_%29.pdf
  2. DGFT – ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.