Lead Acid Battery Assembly

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹25 lakh and ₹25 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Lead Acid Battery Assembly

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹3.16 L
Term loan from bank
₹2.05 L
Promoter’s contribution
₹0.32 L
Subsidy
₹0.79 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.46 L
Average DSCR
-7.25
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Assemble bought-in lead plates into batteries for vehicles and inverters, then test and charge them.

Main product or serviceLead Acid Battery Assembly
Installed capacity per year (at 100%)10,000 units

04 Market

  • Vehicle owners and workshops
  • Inverter and UPS users
  • Telecom and solar installers
  • Battery dealers and auto-parts shops
  • Inverter and solar dealers
  • Direct supply to workshops

05 Plant and machinery

ItemQty₹Total ₹
Melting pot110,00010,000
Burner110,00010,000
Dies (× 8)116,00016,000
Welding torch (× 2)16,0006,000
LPG cylinder with regulator (× 2)110,00010,000
Oxygen cylinder (× 2)150,00050,000
Compressor115,00015,000
Battery tester (× 2)18,0008,000
Resistance / capacity discharge tester110,00010,000
Hydrometer (× 5)13,0003,000
Temperature meter13,0003,000
Battery charger135,00035,000
Moulds, die tools, jigs and fixtures (× Lump sum)150,00050,000
Electrification (× Lump sum)175,00075,000
Total3,01,000

Pre-filled from: PMEGP sample project report — Lead Acid Battery (prepared by Udyami/Samadhan); DGFT – ITC(HS) classification of export and import items. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Positive and negative lead plates — bought from outside at first; the main raw material
  • Containers, top covers and PVC separator sheets — for assembly
  • Lead alloy — melted to cast terminals
  • Bitumen sealing compound — to seal the top cover

07 Cost of project

₹ in lakh
Plant and machinery3.01
Contingency0.15
Total fixed capital3.16
Working capital margin0.00
Total project cost3.16

08 Means of finance

₹ in lakh%
Promoter’s contribution0.3210.0
Subsidy0.7925.0
Term loan from bank2.0565.0
Total3.16100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.060.060.060.060.060.060.06
Insurance0.020.020.020.020.020.020.02
Total cost of operations2.962.962.962.962.962.962.96
Operating profit (EBITDA)-2.96-2.96-2.96-2.96-2.96-2.96-2.96
Depreciation0.470.400.340.290.250.210.18
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.220.190.160.120.090.050.02
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.66-3.55-3.46-3.37-3.29-3.22-3.16
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.66-3.55-3.46-3.37-3.29-3.22-3.16

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.66-3.55-3.46-3.37-3.29-3.22-3.16
Depreciation0.470.400.340.290.250.210.18
Cash accruals (PAT + depreciation)-3.18-3.15-3.12-3.08-3.05-3.01-2.98
Term loan repaid0.160.320.320.320.320.320.32
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.34-3.47-3.43-3.40-3.36-3.33-3.29
Cash and bank-3.34-6.81-10.24-13.64-17.00-20.33-23.62

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.111.111.111.111.111.111.11
Reserves and surplus-3.66-7.21-10.67-14.04-17.34-20.56-23.72
Term loan outstanding1.901.581.260.950.630.320.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-0.65-4.52-8.30-11.99-15.60-19.14-22.61
Net fixed assets2.692.281.941.651.401.191.01
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.34-6.81-10.24-13.64-17.00-20.33-23.62
Total assets-0.65-4.52-8.30-11.99-15.60-19.14-22.61

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-7.78-5.82-6.24-6.74-7.32-8.00-8.84
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-7.25
Lowest DSCR-8.84
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.470.400.340.290.250.210.18

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
12.050.220.161.90
21.900.190.321.58
31.580.160.321.26
41.260.120.320.95
50.950.090.320.63
60.630.050.320.32
70.320.020.320.00

17 Licences and registrations

  • Udyam registration
  • GST
  • BIS certification to IS 7372 (the standard the report cites)
  • State Pollution Control Board consent and hazardous-waste authorisation (lead)
  • EPR registration with CPCB under the Battery Waste Management Rules, 2022
  • Factory licence and fire NOC as required

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. PMEGP sample project report — Lead Acid Battery (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Lead_acid_battery_%28_Samadhan_Projects_%29.pdf
  2. DGFT – ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.