Building BusinessServices

Section 24

Machine Vice Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹87.47 lakh and ₹87.47 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Machine Vice Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹20.63 L
Term loan from bank
₹18.57 L
Promoter’s contribution
₹2.06 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-7.06 L
Average DSCR
-0.92
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Machine cast-iron bodies and steel screws into plain and swivel vices that hold jobs on milling and drilling machines.

Main product or serviceMachine Vice Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Machine-tool makers, who fit vices as standard equipment
  • Workshops with milling and drilling machines
  • Tool rooms
  • Sub-contract supply to machine-tool makers
  • Machine-tool and hardware dealers

05 Plant and machinery

ItemQty₹Total ₹
Vertical milling machine with standard accessories16,50,0006,50,000
Universal tool and cutter grinder13,50,0003,50,000
Lathe, 40 mm spindle, 6 ft bed13,25,0003,25,000
Column drilling machine, 50 mm capacity12,50,0002,50,000
Surface grinder, 1000 mm x 240 mm11,40,0001,40,000
Universal band saw180,00080,000
Double-ended pedestal grinder, 6 inch140,00040,000
Measuring instruments150,00050,000
Jigs and fixtures180,00080,000
Total19,65,000

Pre-filled from: DC-MSME project profile — Machine Vices. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Cast-iron castings (special grade grey iron) — 4 tonnes a month at ₹40 a kg
  • EN-8 steel rod, 37 mm diameter — 1 tonne a month at ₹125 a kg
  • Carbon-steel plates for jaws — ₹40,000 a month
  • T-nuts, bolts and screws — ₹25,000 a month

07 Cost of project

₹ in lakh
Plant and machinery19.65
Contingency0.98
Total fixed capital20.63
Working capital margin0.00
Total project cost20.63

08 Means of finance

₹ in lakh%
Promoter’s contribution2.0610.0
Term loan from bank18.5790.0
Total20.63100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.410.410.410.410.410.410.41
Insurance0.100.100.100.100.100.100.10
Total cost of operations3.403.403.403.403.403.403.40
Operating profit (EBITDA)-3.40-3.40-3.40-3.40-3.40-3.40-3.40
Depreciation3.092.632.241.901.621.371.17
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan2.011.741.431.110.800.480.17
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-8.50-7.77-7.06-6.41-5.81-5.25-4.73
Income tax0.000.000.000.000.000.000.00
Profit after tax-8.50-7.77-7.06-6.41-5.81-5.25-4.73

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-8.50-7.77-7.06-6.41-5.81-5.25-4.73
Depreciation3.092.632.241.901.621.371.17
Cash accruals (PAT + depreciation)-5.41-5.14-4.82-4.51-4.19-3.88-3.57
Term loan repaid1.432.862.862.862.862.862.86
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-6.83-7.99-7.68-7.37-7.05-6.74-6.42
Cash and bank-6.83-14.83-22.51-29.87-36.92-43.66-50.08

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)2.062.062.062.062.062.062.06
Reserves and surplus-8.50-16.27-23.33-29.74-35.55-40.80-45.53
Term loan outstanding17.1414.2811.438.575.712.860.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities10.700.08-9.84-19.10-27.77-35.88-43.47
Net fixed assets17.5414.9112.6710.779.157.786.61
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-6.83-14.83-22.51-29.87-36.92-43.66-50.08
Total assets10.700.08-9.84-19.10-27.77-35.88-43.47

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.99-0.74-0.79-0.86-0.93-1.02-1.12
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.92
Lowest DSCR-1.12
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation3.092.632.241.901.621.371.17

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
118.572.011.4317.14
217.141.742.8614.28
314.281.432.8611.43
411.431.112.868.57
58.570.802.865.71
65.710.482.862.86
72.860.172.860.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence where the worker and power limits apply
  • Trade licence from the local body

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Machine Vices — https://www.dcmsme.gov.in/old/reports/mechanical/MachineVice.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.