Monoset Water Pump Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹120.36 lakh and ₹120.36 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Monoset Water Pump Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹55.81 L
Term loan from bank
₹50.23 L
Promoter’s contribution
₹5.58 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-14.18 L
Average DSCR
-0.43
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Machine castings, wind motors and assemble electric monoset pumps from 0.25 to 15 HP for farms and homes.

Main product or serviceMonoset Water Pump Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Farmers and land owners
  • State irrigation departments
  • Cooperative societies
  • Households
  • Pump and hardware dealers
  • Government tenders

05 Plant and machinery

ItemQty₹Total ₹
High-precision CNC lathe (570 mm swing, 750 mm between centres) with 20 HP motor130,00,00030,00,000
Heavy-duty cone pulley lathe with 5 HP motor (× 4)110,00,00010,00,000
Lathe 155 × 730 mm with 1.5 HP motor (× 2)11,20,0001,20,000
Hydraulic cylindrical grinding machine16,10,0006,10,000
Hydraulic press, 40 tonne170,00070,000
Hydraulic press, 25 tonne145,00045,000
Lapping machine11,00,0001,00,000
Dynamic balancing machine, 50 kg175,00075,000
Oven, 300°C150,00050,000
Pump testing control panel with meters11,10,0001,10,000
Electromagnetic flow meter145,00045,000
Water collection tank and underground sump190,00090,000
Total53,15,000

Pre-filled from: DC-MSME project profile — Monoset Water Pumps (PMRY series, prepared by SISI); World Customs Organization – HS Nomenclature 2022, Chapter 84. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Electrical stampings — 2 tonnes a month at ₹60,000 a tonne in the profile
  • Enamelled copper winding wire — 0.7 tonne a month at ₹2,00,000 a tonne
  • Cast-iron castings (bodies, impellers) — 4 tonnes a month at ₹17,000 a tonne, from local foundries
  • EN-8 shafts — 1 tonne a month at ₹28,000
  • Gun-metal parts — 0.1 tonne a month at ₹95,000 a tonne
  • Mechanical seals, ball bearings, foot valves, wood and paint — bought in; misc. items ₹25,000 a month

07 Cost of project

₹ in lakh
Plant and machinery53.15
Contingency2.66
Total fixed capital55.81
Working capital margin0.00
Total project cost55.81

08 Means of finance

₹ in lakh%
Promoter’s contribution5.5810.0
Term loan from bank50.2390.0
Total55.81100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance1.121.121.121.121.121.121.12
Insurance0.280.280.280.280.280.280.28
Total cost of operations4.284.284.284.284.284.284.28
Operating profit (EBITDA)-4.28-4.28-4.28-4.28-4.28-4.28-4.28
Depreciation8.377.126.055.144.373.713.16
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan5.444.713.863.012.161.310.46
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-18.08-16.10-14.18-12.43-10.81-9.30-7.89
Income tax0.000.000.000.000.000.000.00
Profit after tax-18.08-16.10-14.18-12.43-10.81-9.30-7.89

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-18.08-16.10-14.18-12.43-10.81-9.30-7.89
Depreciation8.377.126.055.144.373.713.16
Cash accruals (PAT + depreciation)-9.71-8.99-8.14-7.29-6.44-5.59-4.74
Term loan repaid3.867.737.737.737.737.737.73
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-13.58-16.71-15.86-15.01-14.16-13.31-12.46
Cash and bank-13.58-30.29-46.15-61.16-75.33-88.64-101.10

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)5.585.585.585.585.585.585.58
Reserves and surplus-18.08-34.18-48.37-60.79-71.60-80.90-88.79
Term loan outstanding46.3638.6430.9123.1815.457.730.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities33.8610.03-11.88-32.03-50.56-67.59-83.21
Net fixed assets47.4440.3234.2729.1324.7621.0517.89
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-13.58-30.29-46.15-61.16-75.33-88.64-101.10
Total assets33.8610.03-11.88-32.03-50.56-67.59-83.21

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.46-0.34-0.37-0.40-0.43-0.47-0.52
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.43
Lowest DSCR-0.52
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation8.377.126.055.144.373.713.16

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
150.235.443.8646.36
246.364.717.7338.64
338.643.867.7330.91
430.913.017.7323.18
523.182.167.7315.45
615.451.317.737.73
77.730.467.730.00

17 Licences and registrations

  • Udyam registration
  • GST
  • BIS ISI mark (IS 9079) — check whether a Quality Control Order applies; tenders often ask for it
  • Factory licence
  • State Pollution Control Board consent
  • BEE star labelling where it applies to your pump type

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. DC-MSME project profile — Monoset Water Pumps (PMRY series, prepared by SISI) — https://www.dcmsme.gov.in/publications/pmryprof/mechanical/ch17.pdf
  2. World Customs Organization – HS Nomenclature 2022, Chapter 84 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/1684_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.