Building BusinessServices

Section 24

MS Pipe Fittings (up to 100 mm)

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹9.95 lakh and ₹9.95 lakh.

Legal form
Applicant category
Location

Detailed Project Report

MS Pipe Fittings (up to 100 mm)

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹0.00 L
Term loan from bank
₹0.00 L
Promoter’s contribution
₹0.00 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-2.88 L
Average DSCR
—
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Press, weld, thread and galvanise mild-steel sockets and pipe fittings up to 100 mm for industry.

Main product or serviceMS Pipe Fittings (up to 100 mm)
Installed capacity per year (at 100%)10,000 units

04 Market

  • Chemical and process industries
  • Oil installations
  • Plumbing and pipeline contractors
  • Direct supply to plants and contractors
  • Hardware and pipe traders

05 Plant and machinery

ItemQty₹Total ₹
Guillotine shearing machine, 12.5 mm × 4 mm capacity100
Hand-operated earing machine, lever type, 30 cm100
Power press, 75 t, pillar type, CI body100
Power press, 50 t, pillar type, CI body100
Electric arc welding set, 350 A100
Special-purpose lathe, 800 mm100
Tapping machine up to 100 mm dia with motor100
Furnace and galvanising tank for hot-dip galvanising100
Hydraulic test benches, dies and tools (× set)100
Total0

Pre-filled from: MSME-DI Hyderabad project profile — MS Pipe Fittings up to 100 mm Dia; World Customs Organization – HS Nomenclature 2022, Chapter 73. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • MS skelp, 14 to 4 gauge — 3.5 t a month (about 350 g per socket)
  • Zinc for galvanising — 150 kg a month (5% of finished weight); raw material together ₹85,000 a month

07 Cost of project

₹ in lakh
Total fixed capital0.00
Working capital margin0.00
Total project cost0.00

08 Means of finance

₹ in lakh%
Total0.00100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.000.000.000.000.000.000.00
Insurance0.000.000.000.000.000.000.00
Total cost of operations2.882.882.882.882.882.882.88
Operating profit (EBITDA)-2.88-2.88-2.88-2.88-2.88-2.88-2.88
Depreciation0.000.000.000.000.000.000.00
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.000.000.000.000.000.000.00
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-2.88-2.88-2.88-2.88-2.88-2.88-2.88
Income tax0.000.000.000.000.000.000.00
Profit after tax-2.88-2.88-2.88-2.88-2.88-2.88-2.88

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-2.88-2.88-2.88-2.88-2.88-2.88-2.88
Depreciation0.000.000.000.000.000.000.00
Cash accruals (PAT + depreciation)-2.88-2.88-2.88-2.88-2.88-2.88-2.88
Term loan repaid0.000.000.000.000.000.000.00
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-2.88-2.88-2.88-2.88-2.88-2.88-2.88
Cash and bank-2.88-5.76-8.64-11.52-14.40-17.28-20.16

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.000.000.000.000.000.000.00
Reserves and surplus-2.88-5.76-8.64-11.52-14.40-17.28-20.16
Term loan outstanding0.000.000.000.000.000.000.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-2.88-5.76-8.64-11.52-14.40-17.28-20.16
Net fixed assets0.000.000.000.000.000.000.00
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-2.88-5.76-8.64-11.52-14.40-17.28-20.16
Total assets-2.88-5.76-8.64-11.52-14.40-17.28-20.16

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)———————
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR—
Lowest DSCR—
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.000.000.000.000.000.000.00

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
10.000.000.000.00
20.000.000.000.00
30.000.000.000.00
40.000.000.000.00
50.000.000.000.00
60.000.000.000.00
70.000.000.000.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence
  • State Pollution Control Board consent (galvanising)
  • Hazardous waste authorisation (zinc ash and spent acid)
  • BIS mark where buyers ask for IS 1239 (Part 2) fittings

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. MSME-DI Hyderabad project profile — MS Pipe Fittings up to 100 mm Dia — https://msmedihyderabad.gov.in/documents/report/7e6feafac24a84a1ff14bc56b5b625c0.doc
  2. World Customs Organization – HS Nomenclature 2022, Chapter 73 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/1573_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.