MS Wire Drawing Unit

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹27.7 lakh and ₹126.22 lakh.

Legal form
Applicant category
Location

Detailed Project Report

MS Wire Drawing Unit

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹35.49 L
Term loan from bank
₹23.07 L
Promoter’s contribution
₹3.55 L
Subsidy
₹8.87 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-9.39 L
Average DSCR
-0.82
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Pulling mild steel wire rod through dies to make thinner bright wire for nails, binding wire, mesh and fasteners.

Main product or serviceMS Wire Drawing Unit
Installed capacity per year (at 100%)10,000 units

04 Market

  • Wire nail, mesh and barbed wire makers
  • Fastener, spring and cycle part makers
  • Builders and hardware dealers (binding wire)
  • Cable and electrode makers
  • Direct supply to local factories
  • Steel and hardware wholesalers
  • Job work: drawing customers' rod for a charge

05 Plant and machinery

ItemQty₹Total ₹
Bull block wire drawing lines (× 2)113,00,00013,00,000
Wire rod breaking machine16,00,0006,00,000
Wire pointing and welding machine160,00060,000
Coilers and de-coilers (× 8)12,40,0002,40,000
Die repair and polishing machine11,50,0001,50,000
Annealing furnace14,50,0004,50,000
Pickling line12,50,0002,50,000
Surface treatment tank11,40,0001,40,000
Pillar drilling machine160,00060,000
Dies, tools, hand tools and gauges11,30,0001,30,000
NSIC list (no costs printed): four-block wire drawing unit, wire pointing machine, pickling, neutralising and washing tanks, de-scaling machine, hoisting equipment, butt welding machine, die polishing machine, flexible shaft grinder, platform weighing machine100
Total33,80,000

Pre-filled from: SIDBI Stand-Up Mitra project profile — Wire Drawing; NSIC project profile — M.S. Wire Drawing. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Mild steel wire rod, 6 mm or 8 mm — the SIDBI profile takes ₹35 to ₹65 per kg for mild steel rod (2018)
  • Sulphuric acid for pickling
  • Drawing lubricant (powder soap)
  • Drawing dies — tungsten carbide or diamond dies
  • Fuel for the annealing furnace

07 Cost of project

₹ in lakh
Plant and machinery33.80
Contingency1.69
Total fixed capital35.49
Working capital margin0.00
Total project cost35.49

08 Means of finance

₹ in lakh%
Promoter’s contribution3.5510.0
Subsidy8.8725.0
Term loan from bank23.0765.0
Total35.49100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.710.710.710.710.710.710.71
Insurance0.180.180.180.180.180.180.18
Total cost of operations3.773.773.773.773.773.773.77
Operating profit (EBITDA)-3.77-3.77-3.77-3.77-3.77-3.77-3.77
Depreciation5.324.523.853.272.782.362.01
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan2.502.161.771.380.990.600.21
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-11.59-10.46-9.39-8.42-7.54-6.73-5.99
Income tax0.000.000.000.000.000.000.00
Profit after tax-11.59-10.46-9.39-8.42-7.54-6.73-5.99

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-11.59-10.46-9.39-8.42-7.54-6.73-5.99
Depreciation5.324.523.853.272.782.362.01
Cash accruals (PAT + depreciation)-6.26-5.93-5.54-5.15-4.76-4.37-3.98
Term loan repaid1.773.553.553.553.553.553.55
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-8.04-9.48-9.09-8.70-8.31-7.92-7.53
Cash and bank-8.04-17.52-26.61-35.31-43.61-51.53-59.06

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)12.4212.4212.4212.4212.4212.4212.42
Reserves and surplus-11.59-22.04-31.43-39.85-47.39-54.12-60.10
Term loan outstanding21.2917.7514.2010.657.103.550.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities22.138.12-4.81-16.78-27.87-38.15-47.68
Net fixed assets30.1725.6421.8018.5315.7513.3911.38
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-8.04-17.52-26.61-35.31-43.61-51.53-59.06
Total assets22.138.12-4.81-16.78-27.87-38.15-47.68

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.88-0.66-0.71-0.76-0.83-0.91-1.00
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.82
Lowest DSCR-1.00
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation5.324.523.853.272.782.362.01

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
123.072.501.7721.29
221.292.163.5517.75
317.751.773.5514.20
414.201.383.5510.65
510.650.993.557.10
67.100.603.553.55
73.550.213.550.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence
  • State Pollution Control Board consent (acid pickling)
  • BIS certification where a Quality Control Order applies to the wire grade
  • Fire safety clearance from the local authority

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. SIDBI Stand-Up Mitra project profile — Wire Drawing — https://www.standupmitra.in/Default/ViewFile/?id=1516897503447_Wire%20Drawing.docx&path=ProjectProfile
  2. NSIC project profile — M.S. Wire Drawing — https://www.nsic.co.in/documents/pdfs/PProfiles/11.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.