Detailed Project Report
Peppermint (Mint) Oil Distillation
—
Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)
01 Project at a glance
- Total project cost
- ₹3.68 L
- Term loan from bank
- ₹2.39 L
- Promoter’s contribution
- ₹0.37 L
- Subsidy
- ₹0.92 L
- Sales · Year 3
- ₹0.00 L
- Profit after tax · Year 3
- ₹-3.55 L
- Average DSCR
- -6.26
- Break-even (% of capacity used)
- —
02 Promoter and unit
| Promoter name | — |
|---|---|
| Business / firm name | — |
| Legal form | Proprietorship |
| Address of the unit | — |
| Applicant category | General · Rural |
03 The project
Steam-distil mint shoots bought from farmers into peppermint oil for pharma, oral-care and cosmetic buyers.
| Main product or service | Peppermint (Mint) Oil Distillation |
|---|---|
| Installed capacity per year (at 100%) | 10,000 units |
04 Market
- Pharmaceutical makers (digestive, headache, cold and muscle-pain products)
- Oral-care makers (toothpaste, mouthwash)
- Shampoo, skin-cream and cosmetic makers
- Aromatherapy and essential-oil sellers
- Bulk sale to manufacturers
- Packed bottles through retailers
05 Plant and machinery
| Item | Qty | ₹ | Total ₹ |
|---|---|---|---|
| Heating vessel (still) | 1 | 0 | 0 |
| Condenser | 1 | 0 | 0 |
| Steam pipe | 1 | 0 | 0 |
| Oil–water separator | 1 | 0 | 0 |
| Water pump | 1 | 0 | 0 |
| Cooling tower | 1 | 0 | 0 |
| Water tank | 1 | 0 | 0 |
| Bottle filling machine | 1 | 0 | 0 |
| Plant & machinery (total in the cost table) | 1 | 3,50,000 | 3,50,000 |
| Total | 3,50,000 |
Pre-filled from: PMEGP sample project report — Peppermint Oil (prepared by Udyami/Samadhan); World Customs Organization – HS Nomenclature 2022, Chapter 33. Prices in older reports will have gone up — enter today’s quotations.
06 Raw materials
- Peppermint shoots (stem and leaves) — 500 tonnes a year at ₹15,000 a tonne (full capacity); bought from farmers
- Bottles (packing) — 10 ml to 500 ml; the report uses 100 ml bottles
07 Cost of project
| ₹ in lakh | |
|---|---|
| Plant and machinery | 3.50 |
| Contingency | 0.18 |
| Total fixed capital | 3.68 |
| Working capital margin | 0.00 |
| Total project cost | 3.68 |
08 Means of finance
| ₹ in lakh | % | |
|---|---|---|
| Promoter’s contribution | 0.37 | 10.0 |
| Subsidy | 0.92 | 25.0 |
| Term loan from bank | 2.39 | 65.0 |
| Total | 3.68 | 100.0 |
| Working capital loan (outside project cost) | 0.00 |
09 Key assumptions
| Selling price | ₹0 per units |
|---|---|
| Raw material & packing cost | ₹0 per units |
| Capacity used each year | 60% · 70% · 80% · 80% · 80% · 80% · 80% |
| Term loan interest rate (% a year) | 11% · 84 months (Moratorium 6) |
| Working capital method | Turnover method (RBI) · Working capital interest (% a year) 11% |
| Income tax rate | 25% |
| Yearly price and cost rise | 0% |
10 Production and sales
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Capacity used | 60% | 70% | 80% | 80% | 80% | 80% | 80% |
| Production (units) | 6,000 | 7,000 | 8,000 | 8,000 | 8,000 | 8,000 | 8,000 |
| Sales | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
11 Projected profitability
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Sales | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Raw material and packing | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Power and fuel | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Salaries and wages | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 | 2.88 |
| Rent | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Administration | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Selling and distribution | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Repairs and maintenance | 0.07 | 0.07 | 0.07 | 0.07 | 0.07 | 0.07 | 0.07 |
| Insurance | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 | 0.02 |
| Total cost of operations | 2.97 | 2.97 | 2.97 | 2.97 | 2.97 | 2.97 | 2.97 |
| Operating profit (EBITDA) | -2.97 | -2.97 | -2.97 | -2.97 | -2.97 | -2.97 | -2.97 |
| Depreciation | 0.55 | 0.47 | 0.40 | 0.34 | 0.29 | 0.24 | 0.21 |
| Preliminary expenses written off | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest on term loan | 0.26 | 0.22 | 0.18 | 0.14 | 0.10 | 0.06 | 0.02 |
| Interest on working capital | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Profit before tax | -3.78 | -3.66 | -3.55 | -3.45 | -3.36 | -3.28 | -3.20 |
| Income tax | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Profit after tax | -3.78 | -3.66 | -3.55 | -3.45 | -3.36 | -3.28 | -3.20 |
12 Cash flow
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Profit after tax | -3.78 | -3.66 | -3.55 | -3.45 | -3.36 | -3.28 | -3.20 |
| Depreciation | 0.55 | 0.47 | 0.40 | 0.34 | 0.29 | 0.24 | 0.21 |
| Cash accruals (PAT + depreciation) | -3.23 | -3.20 | -3.16 | -3.12 | -3.07 | -3.03 | -2.99 |
| Term loan repaid | 0.18 | 0.37 | 0.37 | 0.37 | 0.37 | 0.37 | 0.37 |
| Owner’s drawings | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Surplus after repayment | -3.41 | -3.56 | -3.52 | -3.48 | -3.44 | -3.40 | -3.36 |
| Cash and bank | -3.41 | -6.98 | -10.50 | -13.98 | -17.43 | -20.83 | -24.19 |
13 Projected balance sheet
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Capital (own + subsidy) | 1.29 | 1.29 | 1.29 | 1.29 | 1.29 | 1.29 | 1.29 |
| Reserves and surplus | -3.78 | -7.45 | -11.00 | -14.45 | -17.82 | -21.09 | -24.30 |
| Term loan outstanding | 2.21 | 1.84 | 1.47 | 1.10 | 0.74 | 0.37 | 0.00 |
| Working capital loan | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Total liabilities | -0.29 | -4.32 | -8.24 | -12.06 | -15.79 | -19.44 | -23.01 |
| Net fixed assets | 3.12 | 2.66 | 2.26 | 1.92 | 1.63 | 1.39 | 1.18 |
| Preliminary expenses not written off | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Current assets (stock and debtors) | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Cash and bank | -3.41 | -6.98 | -10.50 | -13.98 | -17.43 | -20.83 | -24.19 |
| Total assets | -0.29 | -4.32 | -8.24 | -12.06 | -15.79 | -19.44 | -23.01 |
14 Ratios and break-even
| Year | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Debt service coverage ratio (DSCR) | -6.72 | -5.02 | -5.39 | -5.82 | -6.32 | -6.91 | -7.63 |
| Break-even (% of capacity used) | — | — | — | — | — | — | — |
| Cash break-even | — | — | — | — | — | — | — |
| Average DSCR | -6.26 |
|---|---|
| Lowest DSCR | -7.63 |
| Payback period | — |
15 Depreciation
| Year → (₹ in lakh) | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
|---|---|---|---|---|---|---|---|
| Depreciation | 0.55 | 0.47 | 0.40 | 0.34 | 0.29 | 0.24 | 0.21 |
Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.
16 Term loan repayment
| Year | Opening | Interest | Term loan repaid | Closing |
|---|---|---|---|---|
| 1 | 2.39 | 0.26 | 0.18 | 2.21 |
| 2 | 2.21 | 0.22 | 0.37 | 1.84 |
| 3 | 1.84 | 0.18 | 0.37 | 1.47 |
| 4 | 1.47 | 0.14 | 0.37 | 1.10 |
| 5 | 1.10 | 0.10 | 0.37 | 0.74 |
| 6 | 0.74 | 0.06 | 0.37 | 0.37 |
| 7 | 0.37 | 0.02 | 0.37 | 0.00 |
17 Licences and registrations
- Udyam
- GST
- State Pollution Control Board consent
- Fire safety NOC (steam and fuel)
18 Government schemes that may apply
- Prime Minister's Employment Generation Programme (PMEGP)
- Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
- Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
19 Sources
- PMEGP sample project report — Peppermint Oil (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Peppermint_Oil_%28_Samadhan_Projects_%29.pdf
- World Customs Organization – HS Nomenclature 2022, Chapter 33 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/0633_2022e.pdf
This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.