Building BusinessServices

Section 24

Photochromatic and Coloured Sunglass Lenses

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹10.06 lakh and ₹10.06 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Photochromatic and Coloured Sunglass Lenses

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹2.19 L
Term loan from bank
₹1.42 L
Promoter’s contribution
₹0.22 L
Subsidy
₹0.55 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.28 L
Average DSCR
-10.37
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Grind and polish photochromic and coloured glass blanks into finished lenses for sunglasses and spectacles.

Main product or servicePhotochromatic and Coloured Sunglass Lenses
Installed capacity per year (at 100%)10,000 units

04 Market

  • Optical shops that fit lenses into frames
  • Optical wholesalers
  • Sunglass assemblers and frame makers
  • Direct supply to opticians in nearby towns
  • Sale through optical wholesale markets

05 Plant and machinery

ItemQty₹Total ₹
Spherical diamond curve generator with 1 HP motor and pump150,00050,000
Automatic two-spindle spherical smoothing machine with feeding pumps, motors and timer (× 2 sets)145,00045,000
Automatic two-spindle spherical polishing machine with feeding pumps and motors (× 5 sets)180,00080,000
Surface blocker and deblocker unit with thermostat (× 1 set)115,00015,000
Set of spherical grinding and polishing tools (× 20 pairs)11,5001,500
Spherical blocking holders, 50 mm to 55 mm (× 25 dozen pairs)11,5001,500
Brass gauges (× 10)12,5002,500
Lensometer110,00010,000
Lens measure (× 2)1750750
Trial set (× 1 set)12,5002,500
Total2,08,750

Pre-filled from: DC-MSME project profile — Ophthalmic and Sun Photochromatic Glasses. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Photochromic glass blanks (photogrey, photogrey extra, photobrown, photosun), 60 mm to 65 mm diameter, 2.8 mm to 5 mm thick — 260 dozen a month at ₹680 per dozen = ₹1,76,800 (2003 prices)
  • Coloured glass blanks in different shades, 55 mm to 65 mm diameter, 3.00 mm to 5.00 mm thick — 50 dozen pairs a month at ₹430 per dozen = ₹21,500
  • Abrasive and polishing compounds (cerium oxide) — ₹1,500 a month
  • Blocking alloy and cleaning chemicals — ₹1,500 a month
  • Packing materials — ₹1,000 a month

07 Cost of project

₹ in lakh
Plant and machinery2.09
Contingency0.10
Total fixed capital2.19
Working capital margin0.00
Total project cost2.19

08 Means of finance

₹ in lakh%
Promoter’s contribution0.2210.0
Subsidy0.5525.0
Term loan from bank1.4265.0
Total2.19100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.040.040.040.040.040.040.04
Insurance0.010.010.010.010.010.010.01
Total cost of operations2.932.932.932.932.932.932.93
Operating profit (EBITDA)-2.93-2.93-2.93-2.93-2.93-2.93-2.93
Depreciation0.330.280.240.200.170.150.12
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.150.130.110.090.060.040.01
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.42-3.35-3.28-3.22-3.17-3.12-3.07
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.42-3.35-3.28-3.22-3.17-3.12-3.07

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.42-3.35-3.28-3.22-3.17-3.12-3.07
Depreciation0.330.280.240.200.170.150.12
Cash accruals (PAT + depreciation)-3.09-3.07-3.04-3.02-3.00-2.97-2.95
Term loan repaid0.110.220.220.220.220.220.22
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.20-3.29-3.26-3.24-3.22-3.19-3.17
Cash and bank-3.20-6.49-9.75-12.99-16.20-19.40-22.56

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.770.770.770.770.770.770.77
Reserves and surplus-3.42-6.77-10.05-13.27-16.44-19.56-22.63
Term loan outstanding1.321.100.880.660.440.220.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-1.34-4.90-8.40-11.84-15.23-18.57-21.86
Net fixed assets1.861.581.351.140.970.830.70
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.20-6.49-9.75-12.99-16.20-19.40-22.56
Total assets-1.34-4.90-8.40-11.84-15.23-18.57-21.86

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-11.13-8.32-8.93-9.64-10.46-11.45-12.64
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-10.37
Lowest DSCR-12.64
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.330.280.240.200.170.150.12

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
11.420.150.111.32
21.320.130.221.10
31.100.110.220.88
40.880.090.220.66
50.660.060.220.44
60.440.040.220.22
70.220.010.220.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Trade licence from the local body
  • BIS certification where a Quality Control Order applies

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Ophthalmic and Sun Photochromatic Glasses — https://www.dcmsme.gov.in/publications/pmryprof/glass/ch19.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.