01 Project at a glance

Total project cost
₹18.67 L
Term loan from bank
₹12.13 L
Promoter’s contribution
₹1.87 L
Subsidy
₹4.67 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-6.30 L
Average DSCR
-1.39
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Calcine gypsum in a rotary drum and grind it into plaster of Paris for builders, ceramic units and statue makers.

Main product or servicePlaster of Paris Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Building and interior contractors
  • Ceramic units (moulds and models)
  • Toy, statue and chalk makers; ceiling-board makers
  • Hospitals and dental labs (orthopaedic plaster)
  • Hardware and building-material dealers
  • Direct supply to factories and contractors

05 Plant and machinery

ItemQty₹Total ₹
Rotary cylindrical drum calciner, 2 MT (fabricated), with ½ MT/hr disc pulveriser and 7 HP motor, erection 10%, office equipment (KVIC small, total)11,68,0001,68,000
Attrition disc pulveriser ½ MT/hr with 7 HP motor and accessories13,60,0003,60,000
Rotary drum calciner 2.5 m × 2 m, 4 MT a charge, on a fuel-fired brick oven with chimney15,00,0005,00,000
Burners and other equipment11,50,0001,50,000
Big drum calciner and 3 MT/hr disc pulveriser with 10 HP motor (KVIC B-type, total)16,00,0006,00,000
Total17,78,000

Pre-filled from: KVIC Project Profile — Plaster of Paris (PMEGP); PMEGP sample project report — Plaster of Paris (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Gypsum (natural, marine, dried or phospho-gypsum) — Samadhan: 1,200 MT a year at ₹2,250 a MT; KVIC small: raw material ₹5.10 lakh a year
  • Fuel: light diesel oil, firewood or coal — for the calciner
  • Polythene-lined gunny bags — airtight packing

07 Cost of project

₹ in lakh
Plant and machinery17.78
Contingency0.89
Total fixed capital18.67
Working capital margin0.00
Total project cost18.67

08 Means of finance

₹ in lakh%
Promoter’s contribution1.8710.0
Subsidy4.6725.0
Term loan from bank12.1365.0
Total18.67100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.370.370.370.370.370.370.37
Insurance0.090.090.090.090.090.090.09
Total cost of operations3.353.353.353.353.353.353.35
Operating profit (EBITDA)-3.35-3.35-3.35-3.35-3.35-3.35-3.35
Depreciation2.802.382.021.721.461.241.06
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.311.140.930.730.520.320.11
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-7.46-6.87-6.30-5.79-5.33-4.91-4.51
Income tax0.000.000.000.000.000.000.00
Profit after tax-7.46-6.87-6.30-5.79-5.33-4.91-4.51

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-7.46-6.87-6.30-5.79-5.33-4.91-4.51
Depreciation2.802.382.021.721.461.241.06
Cash accruals (PAT + depreciation)-4.66-4.48-4.28-4.07-3.87-3.66-3.46
Term loan repaid0.931.871.871.871.871.871.87
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-5.59-6.35-6.15-5.94-5.74-5.53-5.32
Cash and bank-5.59-11.95-18.09-24.03-29.77-35.30-40.62

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)6.536.536.536.536.536.536.53
Reserves and surplus-7.46-14.33-20.63-26.42-31.75-36.66-41.17
Term loan outstanding11.209.337.475.603.731.870.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities10.281.54-6.63-14.29-21.48-28.26-34.64
Net fixed assets15.8713.4911.479.758.287.045.98
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-5.59-11.95-18.09-24.03-29.77-35.30-40.62
Total assets10.281.54-6.63-14.29-21.48-28.26-34.64

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.49-1.11-1.20-1.29-1.40-1.53-1.69
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.39
Lowest DSCR-1.69
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation2.802.382.021.721.461.241.06

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
112.131.310.9311.20
211.201.141.879.33
39.330.931.877.47
47.470.731.875.60
55.600.521.873.73
63.730.321.871.87
71.870.111.870.00

17 Licences and registrations

  • Udyam
  • GST
  • State Pollution Control Board consent (calcining and dust)

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Mukhyamantri Yuva Udyami Vikas Abhiyan (CM-YUVA)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. KVIC Project Profile — Plaster of Paris (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/PLASTER_OF_PARIS_%28_MINERAL_BASED_INDUSTRY_%29.pdf
  2. PMEGP sample project report — Plaster of Paris (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Plaster_of_Paris_%28_Samadhan_Projects_%29.pdf
  3. KVIC Project Profile — Plaster of Paris (B type) (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/PLASTER_OF_PARIS_%28_B_type%29_%28_MINERAL_BASED_INDUSTRY_%29.pdf
  4. World Customs Organization – HS Nomenclature 2022, Chapter 25 — https://www.wcoomd.org/-/media/wco/public/global/pdf/topics/nomenclature/instruments-and-tools/hs-nomenclature-2022/2022/0525_2022e.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.