Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹15.17 lakh and ₹15.17 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Pooja Brass Wares (Idols, Lamps, Bells)

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹4.25 L
Term loan from bank
₹2.76 L
Promoter’s contribution
₹0.43 L
Subsidy
₹1.06 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.66 L
Average DSCR
-5.44
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Cast, turn, engrave, polish and plate brass into idols, diyas, bells and incense holders for worship, décor and gifting.

Main product or servicePooja Brass Wares (Idols, Lamps, Bells)
Installed capacity per year (at 100%)10,000 units

04 Market

  • Puja-goods shops in pilgrim towns such as Haridwar
  • Households for worship and festivals
  • Gift and home-décor buyers
  • Importers in the USA, Mauritius and Canada (report)
  • Retail and wholesale shops
  • E-commerce
  • Custom and personalised orders
  • Export

05 Plant and machinery

ItemQty₹Total ₹
Casting machine150,00050,000
Lathe machine130,00030,000
Engraving machine140,00040,000
Polishing machine125,00025,000
Cutting tools and equipment (× 1 set)115,00015,000
Annealing furnace135,00035,000
Brass sheet rolling machine160,00060,000
Electroplating equipment170,00070,000
Welding machine120,00020,000
Workbenches and workstations (× 1 set)115,00015,000
Quality-control instruments (× 1 set)125,00025,000
General tools and safety equipment (× 1 set)120,00020,000
Total4,05,000

Pre-filled from: Uttarakhand DUY project profile — Pooja Brass Wares. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Brass sheets and ingots — the core input; the report cites BIS IS 422 and IS 3288 for sheet and strip
  • Copper and zinc (with lead or tin where needed) — for alloying in-house
  • Glass, stones and wooden accents — for decoration
  • Abrasive compounds, coatings and lacquer — for polishing and finishing

07 Cost of project

₹ in lakh
Plant and machinery4.05
Contingency0.20
Total fixed capital4.25
Working capital margin0.00
Total project cost4.25

08 Means of finance

₹ in lakh%
Promoter’s contribution0.4310.0
Subsidy1.0625.0
Term loan from bank2.7665.0
Total4.25100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.090.090.090.090.090.090.09
Insurance0.020.020.020.020.020.020.02
Total cost of operations2.992.992.992.992.992.992.99
Operating profit (EBITDA)-2.99-2.99-2.99-2.99-2.99-2.99-2.99
Depreciation0.640.540.460.390.330.280.24
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.300.260.210.170.120.070.03
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.92-3.79-3.66-3.54-3.44-3.34-3.25
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.92-3.79-3.66-3.54-3.44-3.34-3.25

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.92-3.79-3.66-3.54-3.44-3.34-3.25
Depreciation0.640.540.460.390.330.280.24
Cash accruals (PAT + depreciation)-3.29-3.25-3.20-3.15-3.11-3.06-3.01
Term loan repaid0.210.430.430.430.430.430.43
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.50-3.67-3.62-3.58-3.53-3.48-3.44
Cash and bank-3.50-7.17-10.79-14.37-17.90-21.38-24.82

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)1.491.491.491.491.491.491.49
Reserves and surplus-3.92-7.71-11.37-14.91-18.35-21.69-24.95
Term loan outstanding2.552.131.701.280.850.430.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities0.12-4.10-8.18-12.15-16.01-19.78-23.46
Net fixed assets3.613.072.612.221.891.601.36
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.50-7.17-10.79-14.37-17.90-21.38-24.82
Total assets0.12-4.10-8.18-12.15-16.01-19.78-23.46

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-5.83-4.36-4.68-5.05-5.49-6.00-6.63
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-5.44
Lowest DSCR-6.63
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.640.540.460.390.330.280.24

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
12.760.300.212.55
22.550.260.432.13
32.130.210.431.70
41.700.170.431.28
51.280.120.430.85
60.850.070.430.43
70.430.030.430.00

17 Licences and registrations

  • Udyam
  • GST
  • Company/firm registration (report)
  • Uttarakhand Pollution Control Board consent (furnace and electroplating)
  • Factory licence if the worker/power threshold is crossed
  • BIS specifications IS 422 and IS 3288 for brass sheet and strip (report)
  • Artisan card for craft fairs
  • IEC for exports

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. Uttarakhand DUY project profile — Pooja Brass Wares — https://duy-heduk.org/downloads/project-profiles/26.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.