Detailed Project Report

RCC Spun (Hume) Pipes

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹26.72 L
Term loan from bank
₹17.37 L
Promoter’s contribution
₹2.67 L
Subsidy
₹6.68 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-7.78 L
Average DSCR
-1.03
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Spin concrete around a steel cage in a rotating mould to make drainage, sewer, culvert and irrigation pipes.

Main product or serviceRCC Spun (Hume) Pipes
Installed capacity per year (at 100%)10,000 units

04 Market

  • Public Health Engineering and Public Works departments
  • Irrigation, agriculture and forest departments
  • National Highways and municipal corporations
  • Panchayats and approved civil contractors
  • Supply to contractors executing government works
  • Government tenders
  • Private builders and farms

05 Plant and machinery

ItemQty₹Total ₹
Pipe moulding machine, 2 m length, with 10 HP motor13,00,0003,00,000
Gauge (cage) winding machine (× 2)11,10,0001,10,000
Concrete mixer11,10,0001,10,000
Collar winding drum with stand (× 2)175,00075,000
Pipe moulds 100–600 mm dia, 2 m, with accessories (× 40)18,00,0008,00,000
Collar moulds with end rings (× 40)15,50,0005,50,000
Gantry with pull-push trolley13,00,0003,00,000
Testing equipment (× 1 lot)11,00,0001,00,000
Electrification and installation (× 1 lot)12,00,0002,00,000
Total25,45,000

Pre-filled from: KVIC Project Profile — RCC Spun Pipe (PMEGP); PMEGP sample project report — RCC Spun Pipe (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Cement — the reports print the cement : stone metal : sand proportion as 1:2:5:2:5
  • Coarse and fine aggregate, sand — bought locally
  • Mild steel and HT rods and bars for cages — cage design as per IS 458
  • All raw material together — ₹30.00 L a year in the KVIC PMEGP profile; ₹90.00 L in year 1 of the Samadhan report

07 Cost of project

₹ in lakh
Plant and machinery25.45
Contingency1.27
Total fixed capital26.72
Working capital margin0.00
Total project cost26.72

08 Means of finance

₹ in lakh%
Promoter’s contribution2.6710.0
Subsidy6.6825.0
Term loan from bank17.3765.0
Total26.72100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.530.530.530.530.530.530.53
Insurance0.130.130.130.130.130.130.13
Total cost of operations3.553.553.553.553.553.553.55
Operating profit (EBITDA)-3.55-3.55-3.55-3.55-3.55-3.55-3.55
Depreciation4.013.412.902.462.091.781.51
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.881.631.341.040.750.450.16
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-9.44-8.58-7.78-7.05-6.39-5.78-5.22
Income tax0.000.000.000.000.000.000.00
Profit after tax-9.44-8.58-7.78-7.05-6.39-5.78-5.22

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-9.44-8.58-7.78-7.05-6.39-5.78-5.22
Depreciation4.013.412.902.462.091.781.51
Cash accruals (PAT + depreciation)-5.43-5.18-4.88-4.59-4.30-4.00-3.71
Term loan repaid1.342.672.672.672.672.672.67
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-6.76-7.85-7.56-7.26-6.97-6.67-6.38
Cash and bank-6.76-14.61-22.17-29.43-36.40-43.07-49.45

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)9.359.359.359.359.359.359.35
Reserves and surplus-9.44-18.02-25.80-32.85-39.24-45.02-50.24
Term loan outstanding16.0313.3610.698.025.342.670.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities15.954.69-5.76-15.48-24.54-32.99-40.88
Net fixed assets22.7119.3116.4113.9511.8610.088.57
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-6.76-14.61-22.17-29.43-36.40-43.07-49.45
Total assets15.954.69-5.76-15.48-24.54-32.99-40.88

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.10-0.82-0.89-0.96-1.04-1.14-1.25
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.03
Lowest DSCR-1.25
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation4.013.412.902.462.091.781.51

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
117.371.881.3416.03
216.031.632.6713.36
313.361.342.6710.69
410.691.042.678.02
58.020.752.675.34
65.340.452.672.67
72.670.162.670.00

17 Licences and registrations

  • Udyam
  • GST
  • BIS ISI mark to IS 458 — expected by government departments buying pipes
  • Pollution control board consent (dust from mixing)
  • Registration as a vendor with PWD, Jal Nigam or municipal bodies

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. KVIC Project Profile — RCC Spun Pipe (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/RCC_SPUN_PIPE_%28_MINERAL_BASED_INDUSTRY_%29.pdf
  2. PMEGP sample project report — RCC Spun Pipe (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/RCC_Spun_Pipe_%28_Samadhan_Projects_%29.pdf
  3. KVIC Project Profile — R.C.C. Spun Pipe (Gramodyog Rojgar Yojana / PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/R.C.C_%28_MINERAL_BASED_INDUSTRY_%29.pdf
  4. DGFT — ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.