Building BusinessServices

Section 24

Regulated DC Power Supplies

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹4.2 lakh and ₹4.2 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Regulated DC Power Supplies

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹1.31 L
Term loan from bank
₹0.85 L
Promoter’s contribution
₹0.13 L
Subsidy
₹0.33 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-3.12 L
Average DSCR
-17.18
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Assemble and test bench power supplies that give a steady DC voltage from mains power for labs, colleges and workshops.

Main product or serviceRegulated DC Power Supplies
Installed capacity per year (at 100%)10,000 units

04 Market

  • Electronics laboratories and R&D sections
  • Colleges, ITIs and polytechnics
  • Industries and communication departments
  • Electronics repair and service centres
  • Direct sale to institutions
  • Laboratory equipment dealers
  • Government and institutional tenders

05 Plant and machinery

ItemQty₹Total ₹
Drilling machine (1/2"), bench grinder, dual-trace oscilloscope (10 MHz), digital voltmeter (4½ digit), multimeters, true-RMS meter, dimmerstats (4 and 8 A), panel meters, HV tester, rheostats, megger, hand tools, jigs and fixtures, office equipment and furniture (× 1 lot)11,25,0001,25,000
Total1,25,000

Pre-filled from: KVIC Project Profile — Regulated D.C. Power Supplies (PMEGP); DGFT — ITC(HS) classification of export and import items. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Electronic components and parts — ₹10,00,000 a year in the profile
  • Labels and packing material — ₹35,000 a year

07 Cost of project

₹ in lakh
Plant and machinery1.25
Contingency0.06
Total fixed capital1.31
Working capital margin0.00
Total project cost1.31

08 Means of finance

₹ in lakh%
Promoter’s contribution0.1310.0
Subsidy0.3325.0
Term loan from bank0.8565.0
Total1.31100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.030.030.030.030.030.030.03
Insurance0.010.010.010.010.010.010.01
Total cost of operations2.912.912.912.912.912.912.91
Operating profit (EBITDA)-2.91-2.91-2.91-2.91-2.91-2.91-2.91
Depreciation0.200.170.140.120.100.090.07
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.090.080.070.050.040.020.01
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-3.20-3.16-3.12-3.08-3.05-3.02-2.99
Income tax0.000.000.000.000.000.000.00
Profit after tax-3.20-3.16-3.12-3.08-3.05-3.02-2.99

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-3.20-3.16-3.12-3.08-3.05-3.02-2.99
Depreciation0.200.170.140.120.100.090.07
Cash accruals (PAT + depreciation)-3.01-2.99-2.98-2.96-2.95-2.94-2.92
Term loan repaid0.070.130.130.130.130.130.13
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.07-3.12-3.11-3.10-3.08-3.07-3.05
Cash and bank-3.07-6.19-9.30-12.40-15.48-18.55-21.60

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)0.460.460.460.460.460.460.46
Reserves and surplus-3.20-6.36-9.48-12.57-15.62-18.64-21.64
Term loan outstanding0.790.660.530.390.260.130.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities-1.96-5.25-8.50-11.71-14.90-18.05-21.18
Net fixed assets1.120.950.810.690.580.500.42
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.07-6.19-9.30-12.40-15.48-18.55-21.60
Total assets-1.96-5.25-8.50-11.71-14.90-18.05-21.18

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-18.44-13.79-14.80-15.97-17.34-18.98-20.94
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-17.18
Lowest DSCR-20.94
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation0.200.170.140.120.100.090.07

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
10.850.090.070.79
20.790.080.130.66
30.660.070.130.53
40.530.050.130.39
50.390.040.130.26
60.260.020.130.13
70.130.010.130.00

17 Licences and registrations

  • Udyam
  • GST
  • BIS registration under the Compulsory Registration Scheme if the product falls in a notified electronics category
  • Trade licence from the local body

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus

19 Sources

  1. KVIC Project Profile — Regulated D.C. Power Supplies (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/REGULATED_D.C._POWER_SUPPLIES_%28_RURAL_ENGG._AND_BIO-TECH_INDUSTRY_%29.pdf
  2. DGFT — ITC(HS) classification of export and import items — https://www.dgft.gov.in/CP/?opt=itchs-import-export

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.