01 Project at a glance

Total project cost
₹7.32 L
Term loan from bank
₹4.76 L
Promoter’s contribution
₹0.73 L
Subsidy
₹1.83 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-4.22 L
Average DSCR
-3.24
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Make mild-steel rolling shutters for shops, godowns and offices.

Main product or serviceRolling Shutters
Installed capacity per year (at 100%)10,000 units

04 Market

  • New commercial and office buildings
  • Shops and godowns
  • Truck, special carrier and ambulance body builders (named in the report)
  • Direct orders from shop owners and builders
  • Contractors and architects
  • Hardware dealers

05 Plant and machinery

ItemQty₹Total ₹
Hand shearing machine, 300 mm blade, cuts 6 mm plate170,00070,000
Hand-operated screw press No. 10, double pillar130,00030,000
Spring coiling machine18,0008,000
Second hand shearing machine (listed again at a lower price)16,0006,000
Second screw press No. 10 (listed again at a lower price)110,00010,000
Pillar drilling machine, ¾-inch, 2 HP112,00012,000
Bench grinder, 10-inch wheel, 2 HP16,0006,000
Welding transformer, 300 A112,00012,000
Electrification and installation (× lump sum)120,00020,000
Testing and measuring equipment (× lump sum)115,00015,000
Other tools and fixtures (× lump sum)115,00015,000
KVIC set: roll-type sheet profile forming machine for 150 mm × 18 SWG strip, press brake 2.5 m, spring coiling machine, shearing machine, screw press, drilling machine, welding transformer, grinder, jigs and fixtures (× 1 set)14,93,0004,93,000
Total6,97,000

Pre-filled from: KVIC Project Profile — Rolling Shutters (PMEGP); PMEGP sample project report — Rolling Shutters (prepared by Udyami/Samadhan). Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • MS strip, 18–22 gauge — 66 tonnes a year at ₹45,000 a tonne
  • Spring-steel wire, 3–6 mm — 9 tonnes a year at ₹90,000 a tonne
  • MS tube, sheets and flats — 1.8 tonnes a year at ₹85,000 a tonne
  • Bolts, nuts, rivets — ₹1.80 lakh a year (lump sum)

07 Cost of project

₹ in lakh
Plant and machinery6.97
Contingency0.35
Total fixed capital7.32
Working capital margin0.00
Total project cost7.32

08 Means of finance

₹ in lakh%
Promoter’s contribution0.7310.0
Subsidy1.8325.0
Term loan from bank4.7665.0
Total7.32100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.150.150.150.150.150.150.15
Insurance0.040.040.040.040.040.040.04
Total cost of operations3.063.063.063.063.063.063.06
Operating profit (EBITDA)-3.06-3.06-3.06-3.06-3.06-3.06-3.06
Depreciation1.100.930.790.670.570.490.41
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan0.510.450.370.290.200.120.04
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-4.68-4.44-4.22-4.02-3.84-3.67-3.52
Income tax0.000.000.000.000.000.000.00
Profit after tax-4.68-4.44-4.22-4.02-3.84-3.67-3.52

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-4.68-4.44-4.22-4.02-3.84-3.67-3.52
Depreciation1.100.930.790.670.570.490.41
Cash accruals (PAT + depreciation)-3.58-3.51-3.43-3.35-3.27-3.19-3.11
Term loan repaid0.370.730.730.730.730.730.73
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-3.94-4.24-4.16-4.08-4.00-3.92-3.84
Cash and bank-3.94-8.18-12.35-16.43-20.42-24.34-28.18

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)2.562.562.562.562.562.562.56
Reserves and surplus-4.68-9.12-13.34-17.36-21.20-24.88-28.40
Term loan outstanding4.393.662.932.201.460.730.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities2.28-2.90-7.85-12.60-17.18-21.58-25.84
Net fixed assets6.225.294.493.823.252.762.35
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-3.94-8.18-12.35-16.43-20.42-24.34-28.18
Total assets2.28-2.90-7.85-12.60-17.18-21.58-25.84

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-3.48-2.60-2.79-3.01-3.27-3.58-3.95
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-3.24
Lowest DSCR-3.95
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation1.100.930.790.670.570.490.41

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
14.760.510.374.39
24.390.450.733.66
33.660.370.732.93
42.930.290.732.20
52.200.200.731.46
61.460.120.730.73
70.730.040.730.00

17 Licences and registrations

  • Udyam registration
  • GST
  • NOC from the State Pollution Control Board (listed in the report)
  • Trade licence from the local body

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Pradhan Mantri MUDRA Yojana (PMMY) – Shishu, Kishor, Tarun, Tarun Plus
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)
  • Stand-Up India

19 Sources

  1. KVIC Project Profile — Rolling Shutters (PMEGP) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/ROLLING_SHUTTERS_%28_RURAL_ENGG._AND_BIO-TECH_INDUSTRY_%29.pdf
  2. PMEGP sample project report — Rolling Shutters (prepared by Udyami/Samadhan) — https://pmegp.msme.gov.in/Home/DownloadDocument?fileName=Documents/ProjectSampleReport/Rolling_Shutters_%28_Samadhan_Projects_%29.pdf
  3. World Customs Organization – HS Nomenclature 2022 edition — https://www.wcoomd.org/en/topics/nomenclature/instrument-and-tools/hs-nomenclature-2022-edition/hs-nomenclature-2022-edition.aspx

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.