Seamless MS Pipe Sockets and Fittings

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹44.11 lakh and ₹44.11 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Seamless MS Pipe Sockets and Fittings

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹26.89 L
Term loan from bank
₹17.48 L
Promoter’s contribution
₹2.69 L
Subsidy
₹6.72 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-7.81 L
Average DSCR
-1.02
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Machining and threading sockets from seamless mild steel pipe — fittings with no weld seam, for lines that carry fluids under pressure.

Main product or serviceSeamless MS Pipe Sockets and Fittings
Installed capacity per year (at 100%)10,000 units

04 Market

  • Chemical and process industries
  • Fertiliser and petrochemical plants
  • Oil installations
  • Ship-building and repair yards
  • Direct supply to plants and their piping contractors
  • Industrial pipe and fitting stockists
  • Vendor registration and tenders of large buyers

05 Plant and machinery

ItemQty₹Total ₹
Guillotine shearing machine, 1250 mm × 4 mm, 7.5 HP12,00,0002,00,000
Hand operated lever shearing machine, 30 cm150,00050,000
Power press, 75 tonnes, 7.5 HP11,75,0001,75,000
Power press, 50 tonnes, 5 HP11,40,0001,40,000
Electric arc welding set, 350 amps140,00040,000
Special purpose production lathe, 900 mm bed (× 6)112,00,00012,00,000
Tapping machine, up to 100 mm diameter (× 2)11,50,0001,50,000
Power press, 10 tonnes, 2 HP150,00050,000
Power hacksaw machine, 18 inch (× 2)130,00030,000
Bench drilling machine (× 2)140,00040,000
Bench grinder114,00014,000
Tools, tackles, fixtures and measuring tools160,00060,000
Portable hand drilling machine, ½ inch (× 2)116,00016,000
Universal bending machine11,60,0001,60,000
Double ended grinding machine, ½ HP (× 2)136,00036,000
Laboratory equipment and chemicals12,00,0002,00,000
Total25,61,000

Pre-filled from: DC-MSME project profile — Seamless Pipe Fittings. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • MS seamless pipes of assorted lengths and diameters — 5,000 kg a month at ₹40 per kg (2002)
  • Consumables: grease, oil, lubricants and packing material — ₹40,000 a month

07 Cost of project

₹ in lakh
Plant and machinery25.61
Contingency1.28
Total fixed capital26.89
Working capital margin0.00
Total project cost26.89

08 Means of finance

₹ in lakh%
Promoter’s contribution2.6910.0
Subsidy6.7225.0
Term loan from bank17.4865.0
Total26.89100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.540.540.540.540.540.540.54
Insurance0.130.130.130.130.130.130.13
Total cost of operations3.553.553.553.553.553.553.55
Operating profit (EBITDA)-3.55-3.55-3.55-3.55-3.55-3.55-3.55
Depreciation4.033.432.912.482.111.791.52
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan1.891.641.341.050.750.460.16
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-9.48-8.62-7.81-7.08-6.41-5.80-5.23
Income tax0.000.000.000.000.000.000.00
Profit after tax-9.48-8.62-7.81-7.08-6.41-5.80-5.23

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-9.48-8.62-7.81-7.08-6.41-5.80-5.23
Depreciation4.033.432.912.482.111.791.52
Cash accruals (PAT + depreciation)-5.44-5.19-4.90-4.60-4.30-4.01-3.71
Term loan repaid1.342.692.692.692.692.692.69
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-6.79-7.88-7.58-7.29-6.99-6.70-6.40
Cash and bank-6.79-14.67-22.25-29.54-36.54-43.23-49.63

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)9.419.419.419.419.419.419.41
Reserves and surplus-9.48-18.10-25.91-32.98-39.39-45.19-50.43
Term loan outstanding16.1313.4510.768.075.382.690.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities16.074.76-5.74-15.51-24.60-33.09-41.01
Net fixed assets22.8619.4316.5114.0411.9310.148.62
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-6.79-14.67-22.25-29.54-36.54-43.23-49.63
Total assets16.074.76-5.74-15.51-24.60-33.09-41.01

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-1.10-0.82-0.88-0.95-1.03-1.13-1.25
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-1.02
Lowest DSCR-1.25
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation4.033.432.912.482.111.791.52

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
117.481.891.3416.13
216.131.642.6913.45
313.451.342.6910.76
410.761.052.698.07
58.070.752.695.38
65.380.462.692.69
72.690.162.690.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence
  • State Pollution Control Board consent (the profile advises taking an NOC)
  • BIS certification where a Quality Control Order applies

18 Government schemes that may apply

  • Prime Minister's Employment Generation Programme (PMEGP)
  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Seamless Pipe Fittings — https://www.dcmsme.gov.in/publications/pmryprof/meatllurgical/ch22.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.