Carbon Bonded Silicon Carbide Crucibles

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹83.02 lakh and ₹83.02 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Carbon Bonded Silicon Carbide Crucibles

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹37.85 L
Term loan from bank
₹34.07 L
Promoter’s contribution
₹3.79 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-10.55 L
Average DSCR
-0.57
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Pressing silicon carbide and graphite with pitch or resin and firing the pots in a shuttle kiln to make crucibles for melting metals in foundries.

Main product or serviceCarbon Bonded Silicon Carbide Crucibles
Installed capacity per year (at 100%)10,000 units

04 Market

  • Non-ferrous foundries melting brass, copper, nickel and their alloys
  • Precious metal and alloy makers
  • Railway and defence production workshops
  • Foundry supply dealers
  • Direct supply to foundries
  • Dealers in foundry stores and refractories
  • Tenders of railways and defence units

05 Plant and machinery

ItemQty₹Total ₹
Jaw crusher, 150 × 75 mm, with 3 HP motor130,00030,000
Disintegrator, 350 mm, with 5 HP motor140,00040,000
Electro or permanent magnet110,00010,000
Ball mill, 900 × 900 mm, with 7.5 HP motor160,00060,000
Ejection type steel dies for standard crucible sizes11,00,0001,00,000
Vibrating screen with dust accumulator, 900 × 600 mm, 3 HP125,00025,000
Platform weighing scales, 10 kg and 30 kg (× 2)110,00010,000
U-trough mixer or kneader, 600 × 900 mm, with 7.5 HP motor140,00040,000
Hydraulic roller press, 100 tonnes, with accumulator and pump14,50,0004,50,000
Oil firing equipment: 8 burners, 2 blowers, pre-heaters, filters, tanks and pyrometers11,00,0001,00,000
Testing equipment117,00017,000
Flashing furnaces113,00013,000
Shuttle kilns, 19 × 10 ft and 12 × 10 ft, with a common chimney (× 2)127,00,00027,00,000
Miscellaneous tools such as heating kettle and mixing shovels110,00010,000
Total36,05,000

Pre-filled from: DC-MSME project profile — Carbon Bonded Silicon Carbide Crucibles. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Graphite, imported or Indian — 13 tonnes a month at ₹25,000 a tonne (2002)
  • Silicon carbide — 9 tonnes a month at ₹22,000 a tonne
  • Ferro-manganese and ferro-silicon — 3.5 tonnes a month at an average of ₹11,000 a tonne
  • Bonding material: tar, pitch or synthetic resin — 5 tonnes a month at an average of ₹6,000 a tonne
  • Fire clay, ball clay, china clay and minerals for saggers and kiln furniture — ₹10,000 a month
  • Coke — 10 tonnes a month at ₹2,500 a tonne

07 Cost of project

₹ in lakh
Plant and machinery36.05
Contingency1.80
Total fixed capital37.85
Working capital margin0.00
Total project cost37.85

08 Means of finance

₹ in lakh%
Promoter’s contribution3.7910.0
Term loan from bank34.0790.0
Total37.85100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance0.760.760.760.760.760.760.76
Insurance0.190.190.190.190.190.190.19
Total cost of operations3.833.833.833.833.833.833.83
Operating profit (EBITDA)-3.83-3.83-3.83-3.83-3.83-3.83-3.83
Depreciation5.684.834.103.492.962.522.14
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan3.693.192.622.041.470.890.31
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-13.19-11.85-10.55-9.36-8.26-7.23-6.28
Income tax0.000.000.000.000.000.000.00
Profit after tax-13.19-11.85-10.55-9.36-8.26-7.23-6.28

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-13.19-11.85-10.55-9.36-8.26-7.23-6.28
Depreciation5.684.834.103.492.962.522.14
Cash accruals (PAT + depreciation)-7.51-7.02-6.44-5.87-5.29-4.72-4.14
Term loan repaid2.625.245.245.245.245.245.24
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-10.13-12.26-11.69-11.11-10.53-9.96-9.38
Cash and bank-10.13-22.40-34.08-45.19-55.72-65.68-75.06

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)3.793.793.793.793.793.793.79
Reserves and surplus-13.19-25.04-35.59-44.94-53.20-60.43-66.71
Term loan outstanding31.4526.2120.9615.7210.485.240.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities22.044.95-10.84-25.43-38.93-51.40-62.93
Net fixed assets32.1727.3523.2519.7616.8014.2812.13
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-10.13-22.40-34.08-45.19-55.72-65.68-75.06
Total assets22.044.95-10.84-25.43-38.93-51.40-62.93

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.61-0.45-0.49-0.53-0.57-0.62-0.69
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.57
Lowest DSCR-0.69
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation5.684.834.103.492.962.522.14

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
134.073.692.6231.45
231.453.195.2426.21
326.212.625.2420.96
420.962.045.2415.72
515.721.475.2410.48
610.480.895.245.24
75.240.315.240.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence
  • State Pollution Control Board consent (oil-fired kilns, pitch fumes and dust)
  • Licence to store fuel oil where the quantity needs it
  • BIS certification where a Quality Control Order applies

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME project profile — Carbon Bonded Silicon Carbide Crucibles — https://www.dcmsme.gov.in/publications/pmryprof/glass/ch3.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.