Ski Boots Manufacturing

Fill six short steps; the report updates as you type. Print it or save it as a PDF when you are done. Published project reports put the total cost of this business between ₹525 lakh and ₹525 lakh.

Legal form
Applicant category
Location

Detailed Project Report

Ski Boots Manufacturing

—

Prepared on: 13 November 2026 · Prepared with Building Business DPR (buildingbusiness.in)

01 Project at a glance

Total project cost
₹200.55 L
Term loan from bank
₹180.50 L
Promoter’s contribution
₹20.06 L
Sales · Year 3
₹0.00 L
Profit after tax · Year 3
₹-43.50 L
Average DSCR
-0.22
Break-even (% of capacity used)
—

02 Promoter and unit

Promoter name—
Business / firm name—
Legal formProprietorship
Address of the unit—
Applicant categoryGeneral · Rural

03 The project

Injection-mould hard cold-resistant plastic shells, stitch insulated waterproof inner liners and fit buckles to make ski boots for soldiers and skiers.

Main product or serviceSki Boots Manufacturing
Installed capacity per year (at 100%)10,000 units

04 Market

  • Defence forces deployed on high-altitude snow
  • Skiers, sports academies and winter-sports clubs
  • Ski resorts and equipment rental shops
  • Adventure and sports goods retailers
  • Defence tenders and GeM
  • Sports goods distributors and online stores
  • Direct supply to resorts and training institutes

05 Plant and machinery

ItemQty₹Total ₹
Injection moulding machine for PVC/polymer shells, two-colour (imported)180,00,00080,00,000
Set of metal moulds for cuff, base last, sole plate and sole lugs142,00,00042,00,000
Heavy duty post-bed lock stitch sewing machine (imported) (× 3)110,50,00010,50,000
Heavy duty flat-bed lock stitch sewing machine (imported) (× 2)15,00,0005,00,000
Strobel chain stitch machine (imported)15,00,0005,00,000
Seam sealing tape heating machine (imported) (× 2)110,00,00010,00,000
Auto skiving machine (imported) (× 2)18,00,0008,00,000
Travelling head cutting machine (imported)110,00,00010,00,000
Heated mould press for shaping liner bootees and lining trimming machine (× 1 + 1)13,50,0003,50,000
Logo hot-brand embossing stamper14,00,0004,00,000
Pedestal drill and buckle attaching machine11,00,0001,00,000
Screw compressor 35 HP with drier14,00,0004,00,000
Generator 135 KVA18,00,0008,00,000
Total1,91,00,000

Pre-filled from: DC-MSME import-substitution DPR — Spiked Boots, Ski Boots and Shoes. Prices in older reports will have gone up — enter today’s quotations.

06 Raw materials

  • Moulded cold-resistant polymer shell parts — cuff, base and outer sole — ₹1,280 a pair
  • Insulated waterproof inner liners — ₹1,200 a pair
  • Aluminium adjustable snap-lock buckles — 8 a pair, ₹1,200
  • Textile cuff straps and accessories — ₹400 a pair
  • PU moulded footbeds and sole tips — ₹520 a pair
  • Hinge points, luminous reflectors and packing — ₹400 a pair

07 Cost of project

₹ in lakh
Plant and machinery191.00
Contingency9.55
Total fixed capital200.55
Working capital margin0.00
Total project cost200.55

08 Means of finance

₹ in lakh%
Promoter’s contribution20.0610.0
Term loan from bank180.5090.0
Total200.55100.0
Working capital loan (outside project cost)0.00

09 Key assumptions

Selling price₹0 per units
Raw material & packing cost₹0 per units
Capacity used each year60% · 70% · 80% · 80% · 80% · 80% · 80%
Term loan interest rate (% a year)11% · 84 months (Moratorium 6)
Working capital methodTurnover method (RBI) · Working capital interest (% a year) 11%
Income tax rate25%
Yearly price and cost rise0%

10 Production and sales

Year → (₹ in lakh)1234567
Capacity used60%70%80%80%80%80%80%
Production (units)6,0007,0008,0008,0008,0008,0008,000
Sales0.000.000.000.000.000.000.00

11 Projected profitability

Year → (₹ in lakh)1234567
Sales0.000.000.000.000.000.000.00
Raw material and packing0.000.000.000.000.000.000.00
Power and fuel0.000.000.000.000.000.000.00
Salaries and wages2.882.882.882.882.882.882.88
Rent0.000.000.000.000.000.000.00
Administration0.000.000.000.000.000.000.00
Selling and distribution0.000.000.000.000.000.000.00
Repairs and maintenance4.014.014.014.014.014.014.01
Insurance1.001.001.001.001.001.001.00
Total cost of operations7.897.897.897.897.897.897.89
Operating profit (EBITDA)-7.89-7.89-7.89-7.89-7.89-7.89-7.89
Depreciation30.0825.5721.7318.4715.7013.3511.35
Preliminary expenses written off0.000.000.000.000.000.000.00
Interest on term loan19.5416.9313.8710.827.764.711.65
Interest on working capital0.000.000.000.000.000.000.00
Profit before tax-57.51-50.39-43.50-37.19-31.36-25.95-20.89
Income tax0.000.000.000.000.000.000.00
Profit after tax-57.51-50.39-43.50-37.19-31.36-25.95-20.89

12 Cash flow

Year → (₹ in lakh)1234567
Profit after tax-57.51-50.39-43.50-37.19-31.36-25.95-20.89
Depreciation30.0825.5721.7318.4715.7013.3511.35
Cash accruals (PAT + depreciation)-27.43-24.82-21.77-18.71-15.66-12.60-9.55
Term loan repaid13.8827.7727.7727.7727.7727.7727.77
Owner’s drawings0.000.000.000.000.000.000.00
Surplus after repayment-41.31-52.59-49.53-46.48-43.43-40.37-37.32
Cash and bank-41.31-93.90-143.44-189.92-233.34-273.72-311.03

13 Projected balance sheet

Year → (₹ in lakh)1234567
Capital (own + subsidy)20.0620.0620.0620.0620.0620.0620.06
Reserves and surplus-57.51-107.90-151.40-188.59-219.95-245.90-266.80
Term loan outstanding166.61138.84111.0783.3155.5427.770.00
Working capital loan0.000.000.000.000.000.000.00
Total liabilities129.1550.99-20.28-85.23-144.36-198.08-246.74
Net fixed assets170.47144.90123.16104.6988.9975.6464.29
Preliminary expenses not written off0.000.000.000.000.000.000.00
Current assets (stock and debtors)0.000.000.000.000.000.000.00
Cash and bank-41.31-93.90-143.44-189.92-233.34-273.72-311.03
Total assets129.1550.99-20.28-85.23-144.36-198.08-246.74

14 Ratios and break-even

Year1234567
Debt service coverage ratio (DSCR)-0.24-0.18-0.19-0.20-0.22-0.24-0.27
Break-even (% of capacity used)———————
Cash break-even———————
Average DSCR-0.22
Lowest DSCR-0.27
Payback period—

15 Depreciation

Year → (₹ in lakh)1234567
Depreciation30.0825.5721.7318.4715.7013.3511.35

Written-down value method at Income-tax Rules block rates (building 10%, plant & machinery 15%, furniture 10%, computers 40%). Change them if your CA uses other rates.

16 Term loan repayment

YearOpeningInterestTerm loan repaidClosing
1180.5019.5413.88166.61
2166.6116.9327.77138.84
3138.8413.8727.77111.07
4111.0710.8227.7783.31
583.317.7627.7755.54
655.544.7127.7727.77
727.771.6527.770.00

17 Licences and registrations

  • Udyam registration
  • GST registration
  • Factory licence
  • State Pollution Control Board consent
  • Vendor registration with defence procurement agencies and on GeM
  • Import Export Code (IEC) for imported machines and materials

18 Government schemes that may apply

  • Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE)

19 Sources

  1. DC-MSME import-substitution DPR — Spiked Boots, Ski Boots and Shoes — https://dcmsme.gov.in/DPR-of-SKI-BOOT-PROJECT-from-Md_Ali_Rahman.pdf

This report is a projection from the figures entered by the promoter. It is not a bank appraisal or a guarantee of a loan or subsidy. Check every figure with current quotations and your chartered accountant before submitting it.